Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030800237 + (Temporary Change Review and Approval, AOP 10, Control Room Inaccessibility)
- ML030780089 + (Temporary Change Review and Approval, AOP 10, Control Room Inaccessibility)
- ML030800062 + (Temporary Change Review and Approval, AOP Lob, Safe to Cold Shutdown in Local Control)
- ML030870807 + (Temporary Change Review and Approval, ECA-0.0, Rev 31, Loss of All AC Power)
- ML030870559 + (Temporary Change Review and Approval, IT 10, Temp Change No. 2002-0047)
- ML030870566 + (Temporary Change Review and Approval, IT 10, Temp Change No. 2002-0048)
- ML030730731 + (Temporary Change Review and Approval, IT 10, Rev 43, Temp Change No. 2002-0048)
- ML030870670 + (Temporary Change Review and Approval, IT 10A, Revision 11, Temp Change No. 2002-0324)
- ML030800159 + (Temporary Change Review and Approval, IT Lob, Test of Electric-Driven Auxiliary Feed Pumps and Valves with Flow to Unit 2 Steam Generators (Quarterly))
- ML030800044 + (Temporary Change Review and Approval, IT 09A, Cold Start of Turbine Driven Auxiliary Feed Pump and Valve Test (Quarterly) Unit 2)
- ML030800095 + (Temporary Change Review and Approval, IT 08A, Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve Test (Quarterly) Unit 1)
- ML030800087 + (Temporary Change Review and Approval, IT 10, Test of Electric-Driven Auxiliary Feed Pumps and Valves (Quarterly))
- ML030800142 + (Temporary Change Review and Approval, IT 10A, Test of Electric-Driven Auxiliary Feed Pumps and Valves with Flow to Unit 1 Steam Generators (Quarterly))
- ML030800416 + (Temporary Change Review and Approval, OI 62A, Motor Driven Auxiliary System (P-38A & P-38B))
- ML030790060 + (Temporary Change Review and Approval, OI 62B, Turbine-Driven Auxiliary Feedwater System (P-29))
- ML030790082 + (Temporary Change Review and Approval, OI 62A, Rev 21, Motor-Driven Auxiliary Feedwater System (P-38A and P-38B)
- ML18052A208 + (Temporary Change TCN-EI-85-008 to Rev 4 to Emergency Plan Implementing Procedure EI-8, Onsite Radiological Monitoring)
- ML18052A237 + (Temporary Change TCN-EI-85-009 to Rev 4 to Emergency Plan Implementation Procedure EI-4.2, Operational Support Ctr Activation)
- ML040700525 + (Temporary Change for PM for South Texas, Units 1 and 2 - PM Change Mr. M. Webb Will Be PM Until Late June 2004)
- ML041900573 + (Temporary Change in Personnel Assignment)
- PLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817 + (Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817)
- ML20205N329 + (Temporary Change to Rev 2 to Operations Manual Off-Normal Instruction ONI-D51, Earthquake)
- ML19207C081 + (Temporary Change to Section 3.6.2.3.d of Tech Specs, Permitting Operation W/All Emergency Cooling Booster Pumps Inoperable)
- PLA-7892, Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892 + (Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892)
- EPID:L-2020-LLA-0245 + (Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892)
- NL-12-0838, Temporary Compensatory Measures Notification + (Temporary Compensatory Measures Notification)
- ML021120059 + (Temporary Discharge to Discharge Canal)
- ENS 48556 + (Temporary Emergency Operating Facility Established for Planned Outage)
- ML070580103 + (Temporary Exemption Request for Use of Lead Fuel Assemblies)
- ML060240112 + (Temporary Exemption Request for Use of Lead Fuel Assemblies)
- DCL-20-058, Temporary Exemption Request from 10 CFR 50 Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic + (Temporary Exemption Request from 10 CFR 50 Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic)
- NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic + (Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic)
- ML20203M233 + (Temporary Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L-2020-LLE-0116) (COVID-19))
- ML033350272 + (Temporary Exemption Request from Requirements of 10 CFR 50.75(h)(2))
- ML033580628 + (Temporary Exemption Request from the Requirements of 10CFR50.75(h)(2))
- ML20297A239 + (Temporary Exemption Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0162 (COVID-19)))
- ML20155F702 + (Temporary Exemption from 10CFR 50.54(w)(5)(i) Requirements Until Completion of Pending Rulemaking Extending Implementation Date Specified But Not Later than 890401)
- ML17329A111 + (Temporary Exemption from 10CFR50,App A,Gdc 2 Re Requirement That Equipment Important to Safety Withstand Effects of Natural Phenomena)
- ML20155C595 + (Temporary Exemption from 10CFR50.54(w)(5)(i) Property Insurance Rule Requirements)
- ML20206K608 + (Temporary Exemption from 10CFR50.54(w)(5)(i) Re Increase in Amount of Onsite Property Damage Insurance Required by Power Reactor Licensees & Insurance That Prioritize Insurance Proceeds for Stabilization & Decontamination After Accident)
- ML20206K513 + (Temporary Exemption from 10CFR50.54(w)(5)(i) Re Increase in Amount of Onsite Property Damage Insurance Required by Power Reactor Licensees & Insurance That Prioritize Insurance Proceeds for Stabilization & Decontamination After Accident)
- ML18153B513 + (Temporary Exemption from 10CFR50.54(w)(5)(i) Increasing Amount of Onsite Property Damage Insurance Until Rulemaking Finalized But No Later than 890401)
- ML20206K557 + (Temporary Exemption from 10CFR50.54(w)(5)(i) Re Increase in Onsite Property Damage Insurance Required by Power Reactor Licensees & Insurance Policies That Prioritized Insurance Proceeds for Stabilization & Decontamination After Accident)
- ML17251A309 + (Temporary Exemption from 10CFR50.54(w)(5)(i),increasing Amount of Onsite Property Damage Insurance Required by NRC Licensees.Exemption Granted Until Rulemaking Finalized But No Later than 890401)
- ML18153B512 + (Temporary Exemption from 10CFR50.54(w)(5)(i),increasing Amount of Onsite Property Damage Insurance Until Rulemaking Finalized But No Later than 890401)
- ML17055E234 + (Temporary Exemption from 10CFR50.54(w)(5)(i),increasing Amount of Onsite Property Damage Insurance Until Rulemaking Finalized But No Later than 890401)
- ML17345A441 + (Temporary Exemption from 10CFR50.54(w)(5)(i) Requirements Re Property Insurance Rule)
- ML17345A442 + (Temporary Exemption from 10CFR50.54(w)(5)(i) Requirements Re Property Insurance Rule)
- ML21133A003 + (Temporary Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection A.7 (EPID L-2021-LLE-0024 (Covid 19)))
- ML20315A345 + (Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.c (EPID L-2020-LLE-0163 (COVID-19)))
- ML20294A291 + (Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR Part 50, Appendix E, Section Iv.F (EPID L-2020-LLE-0153 (COVID-19)))