ML18052A208

From kanterella
Jump to navigation Jump to search
Temporary Change TCN-EI-85-008 to Rev 4 to Emergency Plan Implementing Procedure EI-8, Onsite Radiological Monitoring
ML18052A208
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/03/1985
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
EI-8-03, EI-8-3, NUDOCS 8512270262
Download: ML18052A208 (4)


Text

.

.:-~ -..

PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE Revision and Approval Summary TITLE:

ONSITE RADIOLOGICAL MONITORING

1.

Prepared

.. ---- *- "' D

£&.

J; Origl;tator Id). Yi Date

3.

Recomm~nd Approval/Q-List* ~

~ ~rtment Head

  • Date

.5.

Approved

7.

Biennial Review

2.

QA Concurrence No

4.

PRC Reviewed

6.

ATMS Incorporated Proc No EI-8 Revision 4 Date* 1/29/85 TCN-EI-85-008 1-J3-rts Date ~~

Vertical lines.have not been added because this procedure i~ a complete rewrite.

ei0780-0010j154-89

( 8512270262 951203 ul'

.\\

~DR' ADOCK osoo~5~s;.

4.3.7 4.3.8 4.3.9 PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE TITLE:

OPERATIONAL SUPPORT CENTER ACTIVATION Proc No EI-4.2 Revision 4 Page 5 of 6

c.

Perform post accident sampling and analysis in accordance with EI-7.

d.

Perform onsite analysis of samples on the Multi-Channel Analyzer (MCA).

e.

Ensure efficient and timely information flow and docwnentation.

Health Physics Technicians HP Technicians shall:

a.

Bring equipment designated in Section 2 of Attachment 3 of this procedure.

b.

Assist in initial physical arrangement of the OSC facility per Step 4.2.2 of this procedure.

c.

Perform onsite monitoring in accordance.with EI-8.

d.

Perform offsite monitoring in accordance with EI-9.

e.

Ensure efficient and timely information flow and documentation.

Dosimetry Clerk The Dosimetry Clerk shall:

a.

Bring equipment designated in Section 2 of Attachment 3 of this procedure.

b.

Assist in initial physical arrangement of the OSC facility per Step 4.2.2.of this procedure.

c.

Maintain dosimetry and equipment control throughout the emergency.

d.

Maintain the Dosimetry Record (Attachment 5) and the Equipment Log.

(Attachment 6) throughout the emergency.

e.

Keep the HP Supervisor apprised of personnel approaching exposure limits.

Chemistry ctnd Health Physics Clerks Chemistry and HP Clerks shall:

a.

Assist in initial physical arrangement of the OSC facility per Step 4.2.2 of this procedure.

b.

Keep the status boards updated as information becomes available.

ei0780-0008a154-89

~

PALISADES NUCLEAR PLANT~

EMERGENCY IMPLEMENTATION PROCEDURE TITLE:

OPERATIONAL SUPPORT CENTER ACTIVATION

  • )

Proc No EI-4.2 Revision 4 Page 6 of 6 *

c.

Ensure efficient and timely information flow and documentation of messages.

4.4 EVACUATION/RELOCATION 5.0 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1. 7 5.2 If the area dose rate exceeds 100 mr/hr or airborne activity exceeds 20% MPC, the OSC shall relocate to the second floor of the Feedwater Purity Building.

Evacuation shall be performed with the concurrence of the SED unless the delay caused by waiting for concurrence would endanger OSC personnel.

The evacuation. should be announced over the public address system.

If the Feedwater Purity Building is not habitable, the SED shall designate an alternate OSC location.

ATTACHMENTS AND RECORDS ATTACHMENTS, "Operational Support Center Floor Plan", "Operational Support Center Organizational Chart", "Operational Support Center Emergency Equipment", "Operational Support Center Activation Checklist", "Operational Support Center Dosimetry Record", "Operational Support Center Equipment Log" ' "Preferred and Alternate Methods of Communication" RECORDS None ei0780-0008al54-89

~.*

.~

1

  • . 2 4

es 6

r'.""',......,.~_,.......=-~=--,,.,-,,.....,.,=-=-~-:::-::::-:--...,--,;-:,-,...,.....,...,...,-,.,,--,-...,,,,.,,,-------,---,--,----~~--::~,...,------,-~~---,-...,,,,.,---,----,-,,-.,..---,-~~-,------,,.,.,...,.,--:,--,--7-:--:-.,...,,,.----,,:~

7.8

.. ~:!t.t**i'.&~1~f.illt2faH~*:::,fif~Jt;.*:~ [~ *.~! / F~*E*~:**~; j~= ~:;,*:F'. r,~ 6£:.t: ~*~i~~~:.~::**Qt:rt~2:*ri:*\\ttLJ.s-r,: **,r/E.

9

' I NSEfi::fED:'fNTlJ OF\\< DI SCARDED~Ff:;:OM :YOUR/PROCEDURES Ml~NlH1L...

"--'-"'-'"-'-'.;.._,,;'"--"'.;.;__~--'--'-'----'----'-"'-'--=-==-..:."'-==--"--=-'-'-'==--=:..:....:..->-=-=-::;....=..:...:..:...=-::=-:.::..-..:......:....:.."'-"""'-'-"--=--=-""'--"-'-'--=-'=-==--"'-'-'-==--'-'-'--'"'-'-"'+"=-"~~-"f'-~'

10 DIRECTIONS ACCOMPANY EACH ITEM

  • lf.

+*

) ~ -. '

~

.* 1: ';

'-.~*

EI--.B*:**F~/4 i *:.. cQVE*RstffET; :'<°BIENNJAL... REVJ Eli.('

1s

[*..

. Df~TED

  • 121318'.5:-;c*;:***:.~*<>.,.

'-'-'-'~-'-"-'-'-"""-"-'-~--.,,.--"---'--"--'--'-"--,----"-'-'""'---'-~-'-'-'-'---'-~--'---'-~~...=...,;~,=.;o:.....;....:._;_.='-'-'.,;.::....:_-=..:.;_.,__;;,-'-~---'-~--'--'-~~--'--'---'-'~~'-1 16 17 30

. 34

-*-35 36 37

.38

  • .1 S1GNATURE OR.INITIALS

.DATE

~---~--~-------------

1'7'7,..---,,,----,----,-~...,,-~~---:,-;_-,-,-..,,-;-c~~~,_.,.-..,..,--,,..,---,-,.--,-~~--.-.....,,_-,..-_.,_-,--,.~~-+.,...,,---,~-.,.,,,..,,.....,..,.,.....,.,,....,.~.,..,....,..,.......,..,..-....,..,,.,~~=-'--,..,.,...,::---

39='---'--'----'--'-4---'--~~-'-'-'--"-'--'-~_;;;_-'--'--'--'--'--'-"-"'-"----'-'-"-'--'--'--'--'---'--'--'-...,_;;:..;.....:.__:__;_;___:___:_::;::_~,...,...-'-'-'-'-'--'-~-'--'-'-'--'-~

40 41

  • .:.. 1, 46

***4.7;=*=*-=-============;:=================!:0:===-=-=-*============

48

,.-,-,--,----~~,--~~~-,-~~~..,-,.-~-,--:-~-;---;,.-:--:-~-,-...,--,-~~--.-~--.-:-~,--,--,-,.-,-.,--,~,,,-,,---'--,,--,-:--':-~-,--':-~,.,.,-,~_,,"

49 50

"... ( ~.~*.";

  • . J

~

.. 51'-'--~~~~~~~~~~-'---'-~~~~~-'---=-~~-'-~~'~*~~~~~~-'-~""'--'"--jf-'-,,_.~,--_;_..._-'--~--'--~~~"'--'-'----

52

.53 54

'\\