ML19207C081
| ML19207C081 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/10/1979 |
| From: | Vollmer R Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| NUDOCS 7909060418 | |
| Download: ML19207C081 (1) | |
Text
f/ /
- # ;fO j',
April 10, 1979
-p y, j
?:-
r
-'"J y1 Metropolitan Edison Company - Docket 50-320 sde ]..
/t
\\]
,,v 3 +f 6
T'1ree Ml l e Island Nuclear Station - Unit No. 2 Y'
Middletown, Pa.
Based on our evaluation of the current status and operational require-ments of hheThreeMile Island Nuclear Station - Unit Nos.
2, we hereby issue the following temporary change to the Technical Speci-fication with regaru to operability of the RB Emergency Cooling booster pumps.
Section 3.6.2.3.d of the Techn* cal Specification shall be changed to read as follows:
3.6.2.3 d.
With all RB Emergency Cooling Booster pumps inoperable, operation may continue provided that RB temperatore is maintained less than 130 F and RB pressure is maintained no greater than -0.3 psig.
Fan-coil units shall be maintained operatin9 during this time.
Mode applicability is 3 and 4 FOR U.S. NUCLEAR REGULATORY COMMI SS ION Ak ichard H. Vollmer Assistant Director for Systems and Pro,iects Nuclear Reactor Regulation
/
O '! r[(Y l4 u 3:
e
. O v :a.1