Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML021260148 + (TS Pages Amendment 83)
- ML021510294 + (TS Pages Amendment Deletion of TS 3/4.4.1.6)
- ML020300311 + (TS Pages Amendments 138 Boron Dilution Alarm System and Refueling Operations-Nuclear Instrumentation)
- ML021150408 + (TS Pages for ANO-2 Issuance of Amd 244 Tac. MB0789 Increase in Licensed Power Level)
- ML020840443 + (TS Pages for Amd 182 Unit 3,TAC. MB2379 Issuance of Amd Replacement of Part-Length Control Element Assemblies)
- ML022630467 + (TS Pages for Amd. 152, Containment Purge Isolation Instrumentation)
- ML022690740 + (TS Pages for Amds 154 & 154 Credit Soluble Boron in the Spent Fuel Pool Criticality Analysis Tacs. MB2983 & MB2984)
- ML050800432 + (TS Pages for Amendment 221 to License DPR-28, Relocating Current Definition of Surveillance Frequency to New Technical Specification (TS) Sections 4.0.2 and 4.0.3 and Revises Requirements for Missed Surveillance in TS Section 4.0.3)
- ML050120076 + (TS Pages for Amendment 255 Regarding Technical Specifications Adopt TSTF-359, Increased Flexibility in Mode Restraints)
- ML020100406 + (TS Pages for Amendment 262 Elimination of Requirements for Post-Accident Sampling)
- ML030700403 + (TS Pages for Amendment No. 143, Adding a Main Vacuum Pump Trip Specification)
- ML030720061 + (TS Pages for Amendment No. 165, Implement a Core Operating Limits Report)
- ML020100298 + (TS Pages for Amendment No. 177 Re Revision of Reactor Coolant System Cooldown Requirement)
- ML032030009 + (TS Pages for Amendment No. 200 Personnel Title Revisions and Reference Correction to Technical Specification, Section 5.0, Administrative Controls)
- ML043370117 + (TS Pages for Amendment No. 230 Relocating Requirements of TS 3.3(1)a and Other Components Subject to ASME XI Boiler & Pressure Vessel Code Inspection and Testing Surveillance and TS 3.4 to Update UFSAR)
- ML082530055 + (TS Pages for Amendment Nos. 152 and 133, Steam Generator Tube Inspection Program (Tac Nos. MD9148 and MD9149))
- ML030290710 + (TS Pages for Amendment, South Texas Project, Units 1 & 2, Revising TS 4.4.1.4.2.2 and 4.9.1.3)
- ML022210074 + (TS Pages for Amendments 143, 143 & 143 Equipment Hatch Open During Refuel Operations)
- ML022750119 + (TS Pages for Amendments 208 & 189 Revising TS 5.6.5.a)
- ML033100424 + (TS Pages for Amendments 248, 285, and 243 Revised Action Scram Discharge Volume Vent and Drain Valves)
- ML031770176 + (TS Pages for Beaver Valley Power Station, Unit 2)
- ML031540755 + (TS Pages for Columbia Generating Station)
- ML022680740 + (TS Pages for License Amendment 130 Relating to Containment Systems Technical Specification Revisions)
- ML021620378 + (TS Pages for Millstone Nuclear Power Station, Unit No. 2, Issuance of Amendment Containment Air Lock)
- ML031550096 + (TS Pages for Nine Mile Point Nuclear Station, Unit 1)
- ML050260389 + (TS Pages for Nine Mile Point, Unit 1)
- ML040910340 + (TS Pages for Point Beach, Units 1 and 2)
- ML031770170 + (TS Pages for Salem Generating Station, Units 1 & 2)
- ML040900237 + (TS Pages for Vermont Yankee Nuclear Power Station)
- ML020930466 + (TS Pages for Wolf Creek Gs Tac. MB1638)-Issuance of Amd 144 Relocation of Cycle Specific Parameters to the Core Operating Limits Report)
- ML100541369 + (TS Pages from Licensee)
- ML030770092 + (TS Pages to Amendment 132 of License NPF-47)
- ML021060357 + (TS Pages to Amendment 171)
- ML021060349 + (TS Pages to Amendment 230)
- ML020070242 + (TS Pages to Amendment 249 & 229 Change to Technical Specifications 28 Volt D.C. Distribution)
- ML021540133 + (TS Pages to Amendment 289 Cycle-Specific Safety Limit Minimum Critical Power Ratio)
- ML020240317 + (TS Pages, Amendment No. 182, Songs Unit 2)
- ML043380317 + (TS Pages- Issuance of Amendment Revised Techical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation)
- ML023110270 + (TS Pages-Wolf Creek Amendment No. 149)
- ML20155G492 + (TS Proposed Change 197 to License DPR-28,modifying Tech Specs to More Clearly Describe ECCS Actuation Instrumentation - LPCI Sys A/B RHR Pump Start Time Delay Requirements)
- BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank + (TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank)
- ML20195C871 + (TS Proposed Change 203 to License DPR-28,clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases)
- ML20247J806 + (TS Proposed Change 204 to License DPR-28,reducing Normal Operating Supression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances to Add Heat to Suppression Pool.Rept Re Pool Temp,Encl)
- BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) + (TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)))
- BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation + (TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation)
- BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn + (TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn)
- ML20205S939 + (TS Proposed Change 211 to License DPR-28,revising Reactor Spiral Reloading Pattern Beginning Around Source Range Monitor)
- ML20196H280 + (TS Proposed Change 214 to License DPR-28,revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives)
- ML20210D324 + (TS Proposed Change 218 to License DPR-28,evaluating Increase in Allowable Core Flow from 100% to 107%.Listed Specific Change Proposed)
- ML20209G163 + (TS Proposed Change 221 for License DPR-28,revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values.Proprietary & non-proprietary GE Info Re SLMCPR Values,Encl.Proprietary Info Withheld,Per 10CFR2.790(b)(1))
- BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS + (TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS)