PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

MODES 1 With one main steam line isolation valve inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MODES 2 -

and 3 With one main steam line isolation valve inoperable, subsequent operation in MODES 2 or 3 may proceed after:

a.

The inoperable isolation valve is restored to OPERABLE status, or

b.

The isolation valve is maintained closed; Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.5 Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within 6 seconds when tested pursuant to Specification 4.0.5.

BEAVER VALLEY -