ML030290710

From kanterella
Jump to navigation Jump to search

TS Pages for Amendment, South Texas Project, Units 1 & 2, Revising TS 4.4.1.4.2.2 and 4.9.1.3
ML030290710
Person / Time
Site: South Texas  
(NPF-076, NPF-080)
Issue date: 01/27/2003
From:
NRC/NRR/DLPM
To:
Thadani M, NRR/DLPM, 415-1476
Shared Package
ML030290208 List:
References
TAC MB6171, TAC MB6172
Download: ML030290710 (2)


Text

REACTOR COOLANT SYSTEM COLD SHUTDOWN - LOOPS NOT FILLED LIMITING CONDITION FOR OPERATION 3.4.1.4.2

a.

At least two residual heat removal (RHR) loops shall be OPERABLE* and at least one RHR loop shall be in operation.**, and

b.

Each valve or mechanical joint used to isolate unborated water sources shall be secured in the closed position.

APPLICABILITY:

MODE 5 with reactor coolant loops not filled.

ACTION:

a.

With less than the above required RHR loops OPERABLE, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.

b.

With no RHR loop in operation, suspend all operations that would cause introduction into the RCS of coolant with boron concentration less than required to meet SHUTDOWN MARGIN of LCO 3.1.1 and immediately initiate corrective action to return the required RHR loop to operation.

c.

With a valve or mechanical joint used to isolate unborated water sources not secured in the closed position, immediately suspend all operations that would cause introduction into the RCS of coolant with boron concentration less than required to meet SHUTDOWN MARGIN of LCO 3.1.1 and initiate action to secure the valve(s) or joint(s) in the closed position and within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> verify boron concentration is within limits specified in LCO 3.1.1.2. The required action to verify the boron concentration within limits must be completed whenever ACTION c is entered. A separate ACTION entry is allowed for each unsecured valve or mechanical joint.

SURVEILLANCE REQUIREMENTS 4.4.1.4.2.1 At least one RHR loop shall be determined to be in operation and circulating reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.4.2.2 Each valve or mechanical joint used to isolate unborated water sources shall be verified closed and secured in position at least once per 31 days.

  • Two RHR loops may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other RHR loop is OPERABLE and in operation.

"**The RHR pump may be deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided: (1) no operations are permitted that would cause dilution of the Reactor Coolant System boron concentration, and (2) core outlet temperature is maintained at least 10F below saturation temperature.

SOUTH TEXAS - UNITS I & 2 3/4 4-6 Unit 1 - Amendment No. 128, 149 Unit2-AmendmentNo. 1-1.7, 137

3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met; either:

a.

A Kff of 0.95 or less, or

b.

A boron concentration of greater than or equal to 2800 ppm, and

c.

Each valve or mechanical joint used to isolate unborated water sources shall be secured in the closed position.

APPLICABILITY:

MODE 6.*

ACTION:

a.

With the requirements of LCO a. or b. not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes and initiate and continue boration at greater than or equal to 30 gpm of a solution containing greater than or equal to 7000 ppm boron or its equivalent until Keff is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2800 ppm, whichever is the more restrictive.

b.

With a valve or mechanical joint used to isolate an unborated water source not secured in the closed position, immediately suspend CORE ALTERATIONS and initiate action to secure the valve(s) or mechanical joint(s) in the closed position and within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> verify boron concentration is within limit. The required action to verify the boron concentration within limits must be completed whenever ACTION b. is entered. A separate ACTION entry is allowed for each unsecured valve or mechanical joint.

SURVEILLANCE REQUIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to:

a.

Removing or unbolting the reactor vessel head, and

b.

Withdrawal of any full-length control rod in excess of 3 feet from its fully inserted position within the reactor vessel.

4.9.1.2 The boron concentration of the Reactor Coolant System and the refueling canal shall be determined by chemical analysis at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

4.9.1.3 Each valve or mechanical joint used to isolate unborated water sources shall be verified closed and secured in position at least once per 31 days.

  • The reactor shall be maintained in MODE 6 whenever fuel is in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.

SOUTH TEXAS - UNITS I & 2 3/4 9-1 Unit 1 - Amendment No. 5-, 64, 149 Unit 2 -Amendment No. 40,43, 137