ML040910340

From kanterella
Jump to navigation Jump to search

TS Pages for Point Beach, Units 1 and 2
ML040910340
Person / Time
Site: Point Beach  
Issue date: 03/29/2004
From:
NRC/NRR/DLPM
To:
References
TAC MB8183, TAC MB8184
Download: ML040910340 (2)


Text

Rod Group Alignment Limits 3.1.4 Table 3.1.4-1 Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (Fa(Z), F; A)

At Power Levels > 85% Of Rated Power And Bank D Demand < 215 Steps Withdrawn ALIGNMENT LIMITS REQUIRED MARGIN TO REQUIRED MARGIN TO (STEPS)*

F LIMIT (%)

Fo(Z) LIMIT (%)

12 0.00 0.00 13 0.33 0.83 14 0.67 1.67 15 1.00 2.50 16 1.33 3.33 17 1.67 4.17 18 2.00 5.00 Between the bank demand position and the RPI System.

Table 3.1.4-2 Allowable Alignment Umits As A Function Of Measured Peaking Factor Margin (Fo(Z). FNM)

At Power Levels > 85% Of Rated Power And Bank D Demand 2 215 Steps Withdrawn AUGNMENT LIMITS REQUIRED MARGIN TO REQUIRED MARGIN TO (STEPSr F4 LIMIT (%)

Fo(Z) LIMIT Rio) 12 0.00 13 0.33 14 0.67 15 1.00 16 1.33 17 1.67 18 2.00 19 2.33 20 2.67 21 3.00 22 3.33 23 3.67 24 4.00

  • Between the bank demand position and the RPI System.

Point Beach 3.1.4-5 0.00 0.83 1.67 2.50 3.33 4.17 5.00 5.83 6.67 7.50 8.33 9.17 10.0 Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217

Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify Individual rod positions are within the following alignment limits:

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

a.

+ 18 steps of demanded position (as allowed by Table 3.1.4-1)

In MODE 1 > 85 percent RTP when bank demand position Is < 215 steps; AND

b.

i 24 steps of demanded position (as allowed by Table 3.1.4-2)

In MODE I > 85 percent RTP when bank demand position Is 2 215 steps; AND

c.

+/- 24 steps of demanded position In MODE 1 s 85 percent RTP or in MODE 2.

SR 3.1.4.2 Verify rod freedom of movement (trippability) by 92 days moving each rod not fully Inserted in the core 2 10 steps In either direction.

SR 3.1.4.3 Verify rod drop time of each rod, from the fully Prior to reactor withdrawn position, Is s 2.2 seconds from the criticality after beginning of decay of stationary gripper coil each removal of voltage to dashpot entry, with:

the reactor head

a.

Tag 2 500°F; and

b.

All reactor coolant pumps operating.

Point Beach 3.1.4-4 Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217