- ML20266D124 + (Steam Generator Pdt Mechanical Nozzle Seal Assembly.Sheet 1 of 2)
- 05000318/LER-1982-011-03, Steam Generator Pressure Indicator PI-1023A Read High.Caused by Mechanically Binding Force Resulting in Calibr Problem.Force Motor on Pressure Transmitter PT-1023A Replaced + (Steam Generator Pressure Indicator PI-1023A Read High.Caused by Mechanically Binding Force Resulting in Calibr Problem.Force Motor on Pressure Transmitter PT-1023A Replaced)
- ML20085D292 + (Steam Generator Pressure Test)
- 05000456/FIN-2012003-02 + (Steam Generator Primary Manway Bolts Examined with Unqualified Procedure)
- ML070890431 + (Steam Generator Program Amendment Need for Discussion)
- ML20197K034 + (Steam Generator Program Guidelines)
- ML041610191 + (Steam Generator Pulled Tube Examination Watts Bar Unit I - Cycle 5 RFO, Chapters 1 Through 5)
- ML041480437 + (Steam Generator Pulled Tube Examination Watts Bar Unit I - Cycle 5 RFO, Chapters 6 Through 10)
- ML20069M654 + (Steam Generator Reg Guide 1.121 Evaluation, Rev 2)
- ML18113A584 + (Steam Generator Repair Prog for Subj Facil.Rev Contains Supplemental Info Requested by NRC Staff)
- ML19212A239 + (Steam Generator Repair Program Progress Rept 3, June-Jul 1979)
- ML17341A868 + (Steam Generator Repair Program Radiological Progress Rept 3)
- ML18139B515 + (Steam Generator Repair Program for Surry Power Station Unit 1:Final Rept (Radiological Progress Rept Number 5) for Period 800914-810630)
- ML17345B173 + (Steam Generator Repair Program for Turkey Point Unit 4, Final Radiological Progress Rept 4 for 821010 - 830516)
- ML17341A708 + (Steam Generator Repair Program for Turkey Point Unit 3 Radiological Progress Rept 2,810823-1103)
- ML18139A026 + (Steam Generator Repair Program for Unit 2,Final Rept (Progress Rept 6) for Period 790203-1231)
- ML18114A753 + (Steam Generator Repair Program, Progress Rept 2 for 790401-0531)
- ML17345B063 + (Steam Generator Repair Program, Radiological Progress Rept for 830203-0331)
- ML18136A150 + (Steam Generator Repair Program,Progress Rept 4 for Aug-Sept 1979)
- ML18136A367 + (Steam Generator Repair Program,Progress Rept 5 for Oct-Nov 1979)
- ML17345A989 + (Steam Generator Repair Program,Radiological Progress Rept 2 for 821203-830202)
- ML17341B018 + (Steam Generator Repair Program,Radiological Progress Rept, 811231-820302)
- ML13333A926 + (Steam Generator Repair Program,Return to Power Rept)
- ML17341B588 + (Steam Generator Repair Program:Radiological Progress Rept 1 for 821010-1202)
- ML17325A893 + (Steam Generator Repair QA Program)
- ML20062K982 + (Steam Generator Repair Rept)
- ML13311A243 + (Steam Generator Repair Rept, Nonproprietary Version)
- ML18044A494 + (Steam Generator Repair Rept, Revision 4)
- ML17339A802 + (Steam Generator Repair Rept, Revision 7)
- ML17338A469 + (Steam Generator Repair Rept,Revision 6. Provides Detailed Description of Onsite Storage Facility for Replaced Steam Generator Lower Assemblies)
- ML030510412 + (Steam Generator Replacement (Sgr) Project - Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling Topical Report, Commitment Information)
- ML19093B022 + (Steam Generator Replacement - Surry Units Nos. 1 & 2)
- L-PI-04-108, Steam Generator Replacement Activities Outside Security Plan Scope + (Steam Generator Replacement Activities Outside Security Plan Scope)
- ML051930356 + (Steam Generator Replacement Meeting Slides)
- ML12277A176 + (Steam Generator Replacement Presentation)
- ML030160240 + (Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling Topical Report, Response to NRC Request for Additional Information)
- ML023450466 + (Steam Generator Replacement Project - Topical Report No. 24370-TR-C-001, Alternate Rebar Splice - Bar-Lock Mechanical Splices, Response to NRC Request for Additional Information)
- ML021060581 + (Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging & Heavy Load Handling)
- ML030510234 + (Steam Generator Replacement Project - Topical Report No. 24370-TR-C-003, Steam Generator Compartment Roof Modification, Revision 1.)
- ML020910792 + (Steam Generator Replacement Project - Topical Report No. 24370-TR-C-003, Steam Generator Compartment Roof Modification)
- ML20078K058 + (Steam Generator Replacement Study for OL Amend Proceeding. Certificate of Svc Encl)
- ML19289C675 + (Steam Generator Retubing & Refurbishment. Generic Description of Steps Involved in Retube Operation Followed by Detailed Description of Design Features of Refurbished Unit)
- ML20211D236 + (Steam Generator Run Time Analysis Cycle 9)
- ML17229A092 + (Steam Generator Run Time Analysis,Cycle 14, for St Lucie Unit 1)
- ENS 45464 + (Steam Generator Safety Relief Valves Did Not Open at Required Setpoint)
- ML20261L622 + (Steam Generator Sample Isolation Valves Logic Diagram System:Sb)
- ML20260D952 + (Steam Generator Sample Isolation Valves Logic Diagram System:Sb)
- PMNS20210390, Steam Generator Sleeve Inspection License Amendment Request Discussion + (Steam Generator Sleeve Inspection License Amendment Request Discussion)
- ML20077N974 + (Steam Generator Sleeving Rept)
- ML20128N197 + (Steam Generator Sleeving Rept (Brazed Sleeves))
- ML20128N156 + (Steam Generator Sleeving Rept (Mechanical Sleeves))