Steam Generator Repair Program, Radiological Progress Rept for 830203-0331
ML17345B063
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 04/29/1983
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345B062 List:
References
NUDOCS 8305030173
Download: ML17345B063 (12)


Text

STEAM GENERATOR REPAIR PROGRAM FOR TURKEY POINT UNIT 0 RADIOLOGICALPROGRESS REPORT - NO. 3 FOR THE PERIOD FEBRUARY 3, 1983 THROUGH MARCH 30, 1983 DOCKET NO. 50-251-LICENSE NO. DPR-Ol.

FLORIDA POWER AND LIGHT COMPANY 8305030173 830429 PDR ADOCK 05000251 R

- "PDR '.-"I

0 yO

)

~

l A

'kABLE 30

SUMMARY

OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 ACTIVITY DESCRIPTION ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTING EXPENDED LABOR TO DATE EXPOSURE PERIOD TO-DATE (PERSON-HOURS)

(PERSON-HOURS)

(PERSON-REM)

(PERSON"REM)

(PERSON-REM)

ACTIVITY STATUS (C-COMPLETE)

(I-IN PROGRESS) 1.

Remove temporary containments

~

and ventilation.

970 1,129 5.97 4.10 4.10 C

2.

Installation of miscellaneous steel.

3.

Installation of miscellaneous piping in S/G cubicles.

600 350 2g681 3 I817 2.33 7.58 7.38 12.37 7.38 12.37 C

4.

Installation of permanent 580 electrical cables/equipment.

5.

Installation of concrete stop logs, 5,490

~

concrete forms, rebar snd pouring of new concrete 30'6" 6 58'l.

442

~ ~

I 2,539 5.00 1

t 22.08 1.59 7.10 1.59 7.10 C

6.

Installation of emergency containment coolers.

7.

Installation of CRDM coolers and fans.

8.

Install manipulator crane.

210 100 1,118 64 178 2.52 0.42 2.24 0.28 0.49 2.24 0.2&

.... C 0.49 I ~

TABLE 3D (Continued)

SUMHARY OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 HARCH 1983 TURKEY POINT - UNIT 4 ACTIVITY DESCRIPTION ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTING EXPENDED LABOR TO DATE EXPOSURE PERIOD TO-DATE (PERSON-HOURS)

(PERSON-HOURS)

(PERSON-REH)

(PERSON-REM)

(PERSON-REM)

ACTIVITY STATUS (C-COMPLETE)

(I-IN PROGRESS) 9.

Installation of reactor coolant pump motors.

1,219 0

4.68 4.68 C

10.

S/G tube cleaning and inspection.

11.

Conduct S/0 secondary hydrostatic testing.

12.

Reactor preparation/hot functional testing.

13.

Removal of secondary exhaust system.

0 0

0 140 302 281 40 252

~

0 0

0 3.03 8.31 0.59 0.52 1.74 8.31 0.59 0.52 1.74 C

14.

Remove temporary shielding.

15.

Remove sea ffolding all

,elevations

~

16.

On-going decontamination activities.

17.

'Remove/dispose of contaminated materials, 84 830 2,730

~-

900 0

0 0

7.85 8.20 7.41 4.02 0

0 4.02 I

0 I

0 i

.... I 18.

Project non-manual support.

1~720 0

24.75 0

0

TABLF. 3D (Continued)

SUMMARY

OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 ACTIVITY DESCRIPTION ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTIHG EXPENDED LABOR TO DATE EXPOSURE PERIOD TO-DATE (PERSON-HOURS)

(PERSOH-HOURS)

(PERSON-REM)

(PERSON-REM)

"(PERSON-REM)

ACTIVITY STATUS (C-COMPLETE)

(I-IN PROGRESS) 19.

Containment tool and veld rod room support.

20.

Crane operation and maintenance.

21.

Miscellaneous.

Phase ActivityTotals Total Phase IV (Completed Tasks Only) 210 685 5,875 21,474 8I300 0

295 147884 13,592

~

~

0.63 1.36 39.77 141

,45.90

~

E 0

0.42 55.83 49.16 0

0 0.42 55.83 49.16

~ ~

TABLE 4 PERSONNEL EXPOSURE

SUMMARY

PER PHASE REFORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 PHASE ESTIHATED LABOR ACTUAL LABOR DESCRIPTION EXPENDED TO-DATE EXPENDED TO-DATE (PERSON-HOURS)

(PERSON-HOURS)

TOTAL ESTIMATED EXPOSURE (PERSON REM)

ESTIMATED EXPOSURE EXPENDED TO-DATB (PERSON-REM)

ACTUAL EXPOSURE PHASE STATUS FOR REPORTINC ACTUAL EXPOSURE (C-COMPLETE)

PERIOD BXPENDED TO-DATB (I IN FROCRESS)

(PERSON-REM)

(PERSON-REH)

(NS-NOT STARTED) 0:

Preparation Removal Installation 34~992 69g129 82,000 Miscellaneousa 21 p474 Project totals 207~595 (Completed Phases Only) 186,121 49,422 54,457 132,539 14,884 251,302 236,418 283 lg016 644 141 2,084 1,943>>

~

~

283 1,016 644 141 2,084

'1,943 0.00 0:00 311.12 55.83 366.95 N/A 229.99 395.62 562+60 55.83 1)244.04 1)188.21 Miscellaneous (post-installation)

- includes cleanup, storage and miscellaneous preparations prior to start-up.

TABLE 5

SUMMARY

OF RADIOACTIVE EFFLUENT RELEASES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT - UNIT 4 1983 I.

LIQUID EFFLUENT RELEASES FEBRUARY MARCH RADIONUCLIDE 2/3 " 3/2 3/3 3/30 RADIOACTIVITYRELEASED IN LIQUID EFFLUENTS (CURIES)

TOTAL ACTIVITY RELEASED THIS REPORTINC PERIOD TOTAL RELEASED DURING S/G REPAIR TO DATE AE-110m Co-58 Co-60 Cs-134 Cs-136 Cs-137 I-131 I-133 I-135 Mn-54 Nb-95 3.38E-04 6.53E-04 1 ~ 11E-04 1.13E-03 3.0E-03 3.18E-04 2'1E-04 7.04E-04 1.47E-05 9.80E-06 7.67E-05 6.95E-05

~

~

~ i

~

6.95E"05 1.47E"03 3.65E-03 4.298-04 9.25E-04 9.14E-05 9.80E"06 3.09E"04 lo21E-02 1 ~ 67K-02 8.36E-03 1.90E-04 1.55E"02 1.79E"02 2o50E"03 2.60E-04

'1.94E-04 8.538-05 TOTAL 1.35E-03 5.30E-03 6.65E-03 7.41E-02 Tritium Released (Curies) 0.0 0.0 0.0 4 ~ 7E401 Liquid Effluent Volume Released (Liters) 1.22E+06 Not etecta e

1.27E+06 VOLUME RELEASED THIS REPORTING PERIOD 2.49E+06 VOLUME RELEASED DURING S/0 REPAIR TO DATE 8.51Et06

TABLE 5 (Continued)

SUMMARY

OF RADIOACTIVE EFFLUENT RELEASES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 1983

\\

I'IRBORNE RELEASES h..

NOBLE GASES FEBRUARY MARCH RADIONUCLIDE 2/3 3/2 3/3 - 3/30 RADIOACTIVITYRELEASED IN AIRBORNE EFFLUENTS (CURIES)

TOTAL ACTIVITY RELEASED THIS REPORTING PERIOD TOTAL RELEASED DURING S/G REPAIR TO DATE Ar-41 Kr-85 Kr-85m Kr-88 Xe-131m Xe-133 Xe-133m Xe-135 TOTAL TRITIUM

~

~

~

3.52E-01 4.09E-01 2.238-01 1.,39E-01 1.31Et00 8.62E+02 3.89E+00 6.59K+00 8.75E+02 2.65E-02 B.

HALOCENS

. Br-82 I-131 I-133 1.80E-09 1.80E"09 1.'90E-04 3.30E-02 5.62E-03 TOTAL 1 '0E-09 1 80E-09 3.88E-02

  • Not Detectable

TABLF. 5 (Continued)

SUMMARY

OF RADIOACTIVE EFFLUEHT RELEASES REPORTINC PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 1983 I.

AIRBORNE RELEASES C.

PARTICULATES FEBRUARY MARCH RADIONUCLIDE 2/3 3/2 3/3 - 3/30 RADIOACTIVITYRELEASED IN AIRBORNE EFFLUENTS (CURIES)

TOTAL ACTIVITY RELEASED THIS REPORTINC PERIOD TOTAL'ELEASED DURING S/C REPAIR TO DATE Be-140 Co-57 Co-58 Co-60 Cr-51 Cs"134 Cs-136 Cs"137 I-131 La-140 Mn-54 Hb-93 RQ-103 8.60E-06 2'0E-05 2.208-06 8.50E"06 "1.708-05 4.90E"05 3.908-06 1.008-05 2.10E-06 1

~

~ ~

w

~

2.56E"05 7.70E-05 6.10E"06 1.85E-05 2.108-06 2,00E-05 3.50E-07 3.64E"04 2.468-04 1.20E-05 1.078-04 3.54E-05

2. 16E-04

.1.04E-04 l.408-05 2.05E-05 3.10E-06 3.80E"06 TOTAL 4)738-05 8.20E-05 1.29E-04 1.15E"03

  • Not Detectable

~

~

fQ 0

28 TABLE 6

SUMMARY

"OFSOLID LOW-LEVELRADIOACTIVEWASTE REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT - UNIT 0 I.

SOLID LOW-LEVELRADIOACTIVEWASTE GENERATED 'FROM U-0 S/G REPAIR WASTE FORM VOLUME LLWa,IN CU-FT VOLUME LLW IN CU-FT FOR REPORTING PERIOD TO DATE Compacted Dry Active Waste Non-Compacted Dry Active Waste Resin and Filter Media Channel Head Decontamination Waste Miscellaneous Totals 7,086 1,050 055 8,591 22,702

3) 200 I)090 595 28,031 II.

SOLID LOW-LEVELREPAIR ACTIVITYWASTE SHIPPED REPORTING PERIOD DATES VOLUME LLWa SHIPPED IN CU-FT ESTIMATED ACTIVITY>

CURIES 10 October 82 - 2 December 82 3 December 82 - 2 February 83 3 February 83 - 30 March 83 Totals 7,191, 8,217 8,591 23,999 0.332 120.250 7.058 128.000 a

LLW Low-level (radioactive) waste.

Predominant radionuclides 137Cs, Co, 5 Co.