STEAM GENERATOR REPAIR PROGRAM FOR TURKEY POINT UNIT 0 RADIOLOGICALPROGRESS REPORT - NO. 3 FOR THE PERIOD FEBRUARY 3, 1983 THROUGH MARCH 30, 1983 DOCKET NO. 50-251-LICENSE NO. DPR-Ol.
FLORIDA POWER AND LIGHT COMPANY 8305030173 830429 PDR ADOCK 05000251 R
- "PDR '.-"I
0 yO
)
~
l A
'kABLE 30
SUMMARY
OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 ACTIVITY DESCRIPTION ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTING EXPENDED LABOR TO DATE EXPOSURE PERIOD TO-DATE (PERSON-HOURS)
(PERSON-HOURS)
(PERSON-REM)
(PERSON"REM)
(PERSON-REM)
ACTIVITY STATUS (C-COMPLETE)
(I-IN PROGRESS) 1.
Remove temporary containments
~
and ventilation.
970 1,129 5.97 4.10 4.10 C
2.
Installation of miscellaneous steel.
3.
Installation of miscellaneous piping in S/G cubicles.
600 350 2g681 3 I817 2.33 7.58 7.38 12.37 7.38 12.37 C
4.
Installation of permanent 580 electrical cables/equipment.
5.
Installation of concrete stop logs, 5,490
~
concrete forms, rebar snd pouring of new concrete 30'6" 6 58'l.
442
~ ~
I 2,539 5.00 1
t 22.08 1.59 7.10 1.59 7.10 C
6.
Installation of emergency containment coolers.
7.
Installation of CRDM coolers and fans.
8.
Install manipulator crane.
210 100 1,118 64 178 2.52 0.42 2.24 0.28 0.49 2.24 0.2&
.... C 0.49 I ~
TABLE 3D (Continued)
SUMHARY OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 HARCH 1983 TURKEY POINT - UNIT 4 ACTIVITY DESCRIPTION ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTING EXPENDED LABOR TO DATE EXPOSURE PERIOD TO-DATE (PERSON-HOURS)
(PERSON-HOURS)
(PERSON-REH)
(PERSON-REM)
(PERSON-REM)
ACTIVITY STATUS (C-COMPLETE)
(I-IN PROGRESS) 9.
Installation of reactor coolant pump motors.
1,219 0
4.68 4.68 C
10.
S/G tube cleaning and inspection.
11.
Conduct S/0 secondary hydrostatic testing.
12.
Reactor preparation/hot functional testing.
13.
Removal of secondary exhaust system.
0 0
0 140 302 281 40 252
~
0 0
0 3.03 8.31 0.59 0.52 1.74 8.31 0.59 0.52 1.74 C
14.
Remove temporary shielding.
15.
Remove sea ffolding all
,elevations
~
16.
On-going decontamination activities.
17.
'Remove/dispose of contaminated materials, 84 830 2,730
~-
900 0
0 0
7.85 8.20 7.41 4.02 0
0 4.02 I
0 I
0 i
.... I 18.
Project non-manual support.
1~720 0
24.75 0
0
TABLF. 3D (Continued)
SUMMARY
OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 ACTIVITY DESCRIPTION ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTIHG EXPENDED LABOR TO DATE EXPOSURE PERIOD TO-DATE (PERSON-HOURS)
(PERSOH-HOURS)
(PERSON-REM)
(PERSON-REM)
"(PERSON-REM)
ACTIVITY STATUS (C-COMPLETE)
(I-IN PROGRESS) 19.
Containment tool and veld rod room support.
20.
Crane operation and maintenance.
21.
Miscellaneous.
Phase ActivityTotals Total Phase IV (Completed Tasks Only) 210 685 5,875 21,474 8I300 0
295 147884 13,592
~
~
0.63 1.36 39.77 141
,45.90
~
E 0
0.42 55.83 49.16 0
0 0.42 55.83 49.16
~ ~
TABLE 4 PERSONNEL EXPOSURE
SUMMARY
PER PHASE REFORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 PHASE ESTIHATED LABOR ACTUAL LABOR DESCRIPTION EXPENDED TO-DATE EXPENDED TO-DATE (PERSON-HOURS)
(PERSON-HOURS)
TOTAL ESTIMATED EXPOSURE (PERSON REM)
ESTIMATED EXPOSURE EXPENDED TO-DATB (PERSON-REM)
ACTUAL EXPOSURE PHASE STATUS FOR REPORTINC ACTUAL EXPOSURE (C-COMPLETE)
PERIOD BXPENDED TO-DATB (I IN FROCRESS)
(PERSON-REM)
(PERSON-REH)
(NS-NOT STARTED) 0:
Preparation Removal Installation 34~992 69g129 82,000 Miscellaneousa 21 p474 Project totals 207~595 (Completed Phases Only) 186,121 49,422 54,457 132,539 14,884 251,302 236,418 283 lg016 644 141 2,084 1,943>>
~
~
283 1,016 644 141 2,084
'1,943 0.00 0:00 311.12 55.83 366.95 N/A 229.99 395.62 562+60 55.83 1)244.04 1)188.21 Miscellaneous (post-installation)
- includes cleanup, storage and miscellaneous preparations prior to start-up.
TABLE 5
SUMMARY
OF RADIOACTIVE EFFLUENT RELEASES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT - UNIT 4 1983 I.
LIQUID EFFLUENT RELEASES FEBRUARY MARCH RADIONUCLIDE 2/3 " 3/2 3/3 3/30 RADIOACTIVITYRELEASED IN LIQUID EFFLUENTS (CURIES)
TOTAL ACTIVITY RELEASED THIS REPORTINC PERIOD TOTAL RELEASED DURING S/G REPAIR TO DATE AE-110m Co-58 Co-60 Cs-134 Cs-136 Cs-137 I-131 I-133 I-135 Mn-54 Nb-95 3.38E-04 6.53E-04 1 ~ 11E-04 1.13E-03 3.0E-03 3.18E-04 2'1E-04 7.04E-04 1.47E-05 9.80E-06 7.67E-05 6.95E-05
~
~
~ i
~
6.95E"05 1.47E"03 3.65E-03 4.298-04 9.25E-04 9.14E-05 9.80E"06 3.09E"04 lo21E-02 1 ~ 67K-02 8.36E-03 1.90E-04 1.55E"02 1.79E"02 2o50E"03 2.60E-04
'1.94E-04 8.538-05 TOTAL 1.35E-03 5.30E-03 6.65E-03 7.41E-02 Tritium Released (Curies) 0.0 0.0 0.0 4 ~ 7E401 Liquid Effluent Volume Released (Liters) 1.22E+06 Not etecta e
1.27E+06 VOLUME RELEASED THIS REPORTING PERIOD 2.49E+06 VOLUME RELEASED DURING S/0 REPAIR TO DATE 8.51Et06
TABLE 5 (Continued)
SUMMARY
OF RADIOACTIVE EFFLUENT RELEASES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 1983
\\
I'IRBORNE RELEASES h..
NOBLE GASES FEBRUARY MARCH RADIONUCLIDE 2/3 3/2 3/3 - 3/30 RADIOACTIVITYRELEASED IN AIRBORNE EFFLUENTS (CURIES)
TOTAL ACTIVITY RELEASED THIS REPORTING PERIOD TOTAL RELEASED DURING S/G REPAIR TO DATE Ar-41 Kr-85 Kr-85m Kr-88 Xe-131m Xe-133 Xe-133m Xe-135 TOTAL TRITIUM
~
~
~
3.52E-01 4.09E-01 2.238-01 1.,39E-01 1.31Et00 8.62E+02 3.89E+00 6.59K+00 8.75E+02 2.65E-02 B.
HALOCENS
. Br-82 I-131 I-133 1.80E-09 1.80E"09 1.'90E-04 3.30E-02 5.62E-03 TOTAL 1 '0E-09 1 80E-09 3.88E-02
- Not Detectable
TABLF. 5 (Continued)
SUMMARY
OF RADIOACTIVE EFFLUEHT RELEASES REPORTINC PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 1983 I.
AIRBORNE RELEASES C.
PARTICULATES FEBRUARY MARCH RADIONUCLIDE 2/3 3/2 3/3 - 3/30 RADIOACTIVITYRELEASED IN AIRBORNE EFFLUENTS (CURIES)
TOTAL ACTIVITY RELEASED THIS REPORTINC PERIOD TOTAL'ELEASED DURING S/C REPAIR TO DATE Be-140 Co-57 Co-58 Co-60 Cr-51 Cs"134 Cs-136 Cs"137 I-131 La-140 Mn-54 Hb-93 RQ-103 8.60E-06 2'0E-05 2.208-06 8.50E"06 "1.708-05 4.90E"05 3.908-06 1.008-05 2.10E-06 1
~
~ ~
w
~
2.56E"05 7.70E-05 6.10E"06 1.85E-05 2.108-06 2,00E-05 3.50E-07 3.64E"04 2.468-04 1.20E-05 1.078-04 3.54E-05
- 2. 16E-04
.1.04E-04 l.408-05 2.05E-05 3.10E-06 3.80E"06 TOTAL 4)738-05 8.20E-05 1.29E-04 1.15E"03
- Not Detectable
~
~
fQ 0
28 TABLE 6
SUMMARY
"OFSOLID LOW-LEVELRADIOACTIVEWASTE REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT - UNIT 0 I.
SOLID LOW-LEVELRADIOACTIVEWASTE GENERATED 'FROM U-0 S/G REPAIR WASTE FORM VOLUME LLWa,IN CU-FT VOLUME LLW IN CU-FT FOR REPORTING PERIOD TO DATE Compacted Dry Active Waste Non-Compacted Dry Active Waste Resin and Filter Media Channel Head Decontamination Waste Miscellaneous Totals 7,086 1,050 055 8,591 22,702
- 3) 200 I)090 595 28,031 II.
SOLID LOW-LEVELREPAIR ACTIVITYWASTE SHIPPED REPORTING PERIOD DATES VOLUME LLWa SHIPPED IN CU-FT ESTIMATED ACTIVITY>
CURIES 10 October 82 - 2 December 82 3 December 82 - 2 February 83 3 February 83 - 30 March 83 Totals 7,191, 8,217 8,591 23,999 0.332 120.250 7.058 128.000 a
LLW Low-level (radioactive) waste.
Predominant radionuclides 137Cs, Co, 5 Co.