Steam Generator Repair Program, Radiological Progress Rept for 830203-0331
ML17345B063
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 04/29/1983
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345B062 List:
References
NUDOCS 8305030173
Download: ML17345B063 (12)


Text

STEAM GENERATOR REPAIR PROGRAM FOR TURKEY POINT UNIT 0 RADIOLOGICALPROGRESS REPORT - NO. 3 FOR THE PERIOD FEBRUARY 3, 1983 THROUGH MARCH 30, 1983 DOCKET NO. 50-251-LICENSE NO. DPR-Ol.

FLORIDA POWER AND LIGHT COMPANY 8305030173 830429 PDR ADOCK 05000251 R - "PDR '.-"I

0 yO ) ~

l A

'kABLE 30

SUMMARY

OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ACTIVITY ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTING EXPENDED STATUS ACTIVITY DESCRIPTION LABOR TO DATE EXPOSURE PERIOD TO-DATE (C-COMPLETE)

(PERSON-HOURS) (PERSON-HOURS) (PERSON-REM) (PERSON"REM) (PERSON-REM) (I-IN PROGRESS)

1. Remove temporary containments 970 1,129 5.97 4.10 4.10 C

~

and ventilation.

2. Installation of miscellaneous 600 2g681 2.33 7.38 7.38 steel.
3. Installation of miscellaneous 350 3 I 817 7.58 12.37 12.37 C piping in S/G cubicles.
4. Installation of permanent 580 442 5.00 1.59 1.59 electrical cables/equipment. 1

~

~ I t

5. Installation of concrete stop logs, 5,490 2,539 22.08 7.10 7.10 C concrete forms, rebar snd pouring 58'l.

~

of new concrete 30'6" 6

6. Installation of emergency 210 1,118 2.52 2.24 2.24 containment coolers.
7. Installation of CRDM coolers 100 64 0.42 0.28 0.2& .... C and fans.
8. Install manipulator crane. 178 0.49 0.49 I~

TABLE 3D (Continued)

SUMHARY OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 HARCH 1983 TURKEY POINT - UNIT 4 ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ACTIVITY ESTIMATED LABOR EXPENDED ESTIMATED - FOR REPORTING EXPENDED STATUS ACTIVITY DESCRIPTION LABOR TO DATE EXPOSURE PERIOD TO-DATE (C-COMPLETE)

(PERSON-HOURS) (PERSON-HOURS) (PERSON-REH) (PERSON-REM) (PERSON-REM) (I-IN PROGRESS)

9. Installation of reactor coolant 1,219 0 4.68 4.68 C pump motors.
10. S/G tube cleaning and inspection. 0 302 ~

0 8.31 8.31 C

11. Conduct S/0 secondary hydrostatic 0 281 0 0.59 0.59 testing.
12. Reactor preparation/hot 0 40 0 0.52 0.52 functional testing.
13. Removal of secondary exhaust 140 252 3.03 1.74 1.74 system.
14. Remove temporary shielding. 84 4.02 4.02 I
15. Remove sea ffolding all 830 0 7.85 0 I

,elevations ~

16. On-going decontamination 2,730 ~- 0 8.20 0 activities.
17. 'Remove/dispose of contaminated materials, 900 0 7.41 0 0 i .... I
18. Project non-manual support. 1~720 0 24.75 0 0

TABLF. 3D (Continued)

SUMMARY

OF POST-INSTALLATION ACTIVITY EXPOSURES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 ACTUAL ACTUAL EXPOSURE ACTUAL EXPOSURE ACTIVITY ESTIMATED LABOR EXPENDED ESTIMATED FOR REPORTIHG EXPENDED STATUS ACTIVITY DESCRIPTION LABOR TO DATE EXPOSURE PERIOD TO-DATE (C-COMPLETE)

(PERSON-HOURS) (PERSOH-HOURS) (PERSON-REM) (PERSON-REM) "(PERSON-REM) (I-IN PROGRESS)

19. Containment tool and veld rod 210 0.63 0 0 room support.
20. Crane operation and maintenance. 685 0 1.36 0
21. Miscellaneous. 5,875 295 39.77 0.42 0.42 Phase Activity Totals 21,474 147884 141 55.83 55.83 Total Phase IV 8I300 13,592 ,45.90 49.16 49.16 (Completed Tasks Only)

~ ~ ~ E

~ ~

TABLE 4 PERSONNEL EXPOSURE

SUMMARY

PER PHASE REFORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 PHASE ESTIHATED LABOR ACTUAL LABOR TOTAL ESTIMATED ESTIMATED EXPOSURE ACTUAL EXPOSURE FOR REPORTINC ACTUAL EXPOSURE PHASE STATUS (C-COMPLETE) 0:

DESCRIPTION EXPENDED TO-DATE EXPENDED TO-DATE EXPOSURE EXPENDED TO-DATB PERIOD BXPENDED TO-DATB (I IN FROCRESS)

(PERSON-HOURS) (PERSON-HOURS) (PERSON REM) (PERSON-REM) (PERSON-REM) (PERSON-REH) (NS-NOT STARTED)

Preparation 34~992 49,422 283 283 0.00 229.99 Removal 69g129 54,457 lg016 1,016 0:00 395.62 Installation 82,000 132,539 644 644 311.12 562+60 Miscellaneousa 21 p474 14,884 141 141 55.83 55.83 Project totals 207~595 251,302 2,084 2,084 366.95 1)244.04 (Completed Phases Only) 186,121 236,418 1,943>> '1,943 N/A 1)188.21

~ ~

Miscellaneous (post-installation) - includes cleanup, storage and miscellaneous preparations prior to start-up.

TABLE 5

SUMMARY

OF RADIOACTIVE EFFLUENT RELEASES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT - UNIT 4 1983 I. LIQUID EFFLUENT RADIOACTIVITY RELEASED IN LIQUID EFFLUENTS (CURIES)

RELEASES TOTAL ACTIVITY TOTAL RELEASED THIS RELEASED DURING FEBRUARY MARCH REPORTINC S/G REPAIR RADIONUCLIDE 2/3 " 3/2 3/3 3/30 PERIOD TO DATE AE-110m

  • 6.95E-05 6.95E"05 3.09E"04 Co-58 3.38E-04 1.13E-03 1.47E"03 lo21E-02 Co-60 6.53E-04 3.0E-03 3.65E-03 1 ~ 67K-02 Cs-134 1 ~ 11E-04 3.18E-04 4.298-04 8.36E-03 Cs-136 1.90E-04 Cs-137 2 '1E-04 7.04E-04 9.25E-04 1.55E"02 I-131 1.79E"02 I-133 2o50E"03 I-135 2.60E-04

~ ~ ~ i ~

Mn-54 1.47E-05 7.67E-05 9.14E-05 '1.94E-04 Nb-95 9.80E-06 9.80E"06 8.538-05 TOTAL 1.35E-03 5.30E-03 6.65E-03 7.41E-02 Tritium Released (Curies) 0.0 0.0 0.0 4 ~ 7E401 VOLUME RELEASED VOLUME RELEASED Liquid Effluent Volume THIS REPORTING DURING S/0 REPAIR Released (Liters) PERIOD TO DATE 1.22E+06 1.27E+06 2.49E+06 8.51Et06 Not etecta e

TABLE 5 (Continued)

SUMMARY

OF RADIOACTIVE EFFLUENT RELEASES REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 1983 \

I'IRBORNE RADIOACTIVITY RELEASED IN AIRBORNE EFFLUENTS RELEASES (CURIES)

TOTAL ACTIVITY TOTAL h.. NOBLE GASES RELEASED THIS RELEASED DURING FEBRUARY MARCH REPORTING S/G REPAIR RADIONUCLIDE 2/3 3/2 3/3 - 3/30 PERIOD TO DATE Ar-41 3.52E-01 Kr-85 4.09E-01 Kr-85m 2.238-01 Kr-88 1.,39E-01 Xe-131m 1.31Et00 Xe-133 8.62E+02 Xe-133m 3.89E+00 Xe-135 6.59K+00

~

~ ~

TOTAL 8.75E+02 TRITIUM 2.65E-02 B. HALOCENS

. Br-82 1.'90E-04 I-131 1.80E-09 1.80E"09 3.30E-02 I-133 5.62E-03 TOTAL 1 '0E-09 1 80E-09 3.88E-02

  • Not Detectable

TABLF. 5 (Continued)

SUMMARY

OF RADIOACTIVE EFFLUEHT RELEASES REPORTINC PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT UNIT 4 1983 I. AIRBORNE RADIOACTIVITY RELEASED IN AIRBORNE EFFLUENTS RELEASES (CURIES)

TOTAL ACTIVITY RELEASED THIS TOTAL'ELEASED C. PARTICULATES DURING FEBRUARY MARCH REPORTINC S/C REPAIR RADIONUCLIDE 2/3 3/2 3/3 - 3/30 PERIOD TO DATE Be-140

  • 3.50E-07 Co-58 8.60E-06 "1.708-05 2.56E"05 3.64E"04 Co-60 2 '0E-05 4.90E"05 7.70E-05 2.468-04 Cr-51 1.20E-05 Cs"134 2.208-06 3.908-06 6.10E"06 1.078-04 Cs-136 3.54E-05 Cs"137 8.50E"06 1.008-05 1 1.85E-05 ' 2. 16E-04 I-131 ~ ~ ~ w ~

.1.04E-04 La-140 l .408-05 Mn-54 2.10E-06 2.108-06 2.05E-05 Hb-93

  • 3.10E-06 RQ-103
  • 3.80E"06 TOTAL 4)738-05 8.20E-05 1.29E-04 1.15E"03
  • Not Detectable

~ ~ fQ 0 28 TABLE 6

SUMMARY

"OF SOLID LOW-LEVEL RADIOACTIVEWASTE REPORTING PERIOD 3 FEBRUARY 1983 TO 30 MARCH 1983 TURKEY POINT - UNIT 0 I. SOLID LOW-LEVEL RADIOACTIVEWASTE GENERATED 'FROM U-0 S/G REPAIR WASTE FORM VOLUME LLWa,IN CU-FT VOLUME LLW IN CU-FT FOR REPORTING PERIOD TO DATE Compacted Dry Active Waste 7,086 22,702 Non-Compacted Dry Active Waste 1,050 3) 200 Resin and Filter Media 055 I) 090 Channel Head Decontamination Waste 595 Miscellaneous Totals 8,591 28,031 II. SOLID LOW-LEVEL REPAIR ACTIVITYWASTE SHIPPED REPORTING PERIOD VOLUME LLWa SHIPPED ESTIMATED ACTIVITY>

DATES IN CU-FT CURIES 10 October 82 - 2 December 82 7,191, 0.332 3 December 82 - 2 February 83 8,217 120.250 3 February 83 - 30 March 83 8,591 7.058 Totals 23,999 128.000 a LLW Low-level (radioactive) waste.

Predominant radionuclides 137Cs, Co, 5 Co.