L-PI-04-108, Steam Generator Replacement Activities Outside Security Plan Scope

From kanterella
Jump to navigation Jump to search
Steam Generator Replacement Activities Outside Security Plan Scope
ML042650350
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/17/2004
From: Solymossy J
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-04-108
Download: ML042650350 (2)


Text

C N

s NM Committed to Nuc or xcl Prairie Island Nuclear Generating Plant Operated by Nuclear Management Company, LLC ATTACHMENTS CONTAIN SAFEGUARDS INFORMATION SEP 1 7 2004 L-PI-04-108 I OCFR Part 50 Section 50.54(p)

U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant Units I and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Unit I Steam Generator Replacement Activities Outside Security Plan Scope

Reference:

Prairie Island Nuclear Generating Plant Security Plan Pursuant to 10CFR Part 50, Section 50.54 (p), we are hereby submitting four (4) copies of Revision 45 to the Prairie Island Nuclear Generating Plant Security Plan. This revision addresses Steam Generator Replacement activities outside the Security Plan scope. These changes do not decrease the effectiveness of the Plan.

This revision to the Prairie Island Nuclear Generating Plant Security Plan contains Safeguards Information as identified by the Commission in 10 CFR Part 73, Section 73.21. This submittal should not be made available for inspection and should not be placed in the public document room.

Please contact Doug Blakesley (651-388-1121, ext. 4164) if you have any questions related to this submittal.

NOTE: THE ATTACHMENTS TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED OACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS LETTER IS "DECONTROLLED."

ATTACHMENTS CONTAIN SAFEGUARDS INFORMATION 1717 Wakonade Drive East

  • Welch, Minnesota 55089-9642 Telephone: 651.388.1121

'/4

Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

M. Solymossy Sit ice President, P irie Itnd Nuclear Generating Plant Enclosures (4) cc:

Administrator, Region 111, USNRC (3 Copies)

Project Manager, Prairie Island, USNRC (Cover letter only)

Resident Inspector, Prairie Island, USNRC (cover letter only)