Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266H710 + (Steam Generator Nozzle Modification for Beaver Valley (Unit 2) Protective Liner Assy SG-21A,B and C, as-built)
- NRC 2015-0040, Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection + (Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection)
- ML20005E037 + (Steam Generator Number 3 Inservice Insp,Yankee Nuclear Power Station)
- ML20082N988 + (Steam Generator Operating Cycle Evaluation)
- ML20151J556 + (Steam Generator Operating Experience Update 1982-1983)
- ML20246A389 + (Steam Generator Operating Experience,Update for 1987-1988)
- ML20086T055 + (Steam Generator Operating Experience,Update for 1989-1990)
- ML20116F302 + (Steam Generator Operational Assessment)
- ML080930312 + (Steam Generator Outage Summary 180-Day Report for End of Cycle 15 Refueling Outage)
- ML053410182 + (Steam Generator Outage Summary 180-Day Report for End of Cycle 15 Refueling Outage)
- ML062550112 + (Steam Generator Outage Summary 180-day Report for End of Cycle 14 Refueling Outage)
- ML062060296 + (Steam Generator Outage Summary Inservice Inspection Report for End of Cycle 14 Refueling Outage)
- ML041110904 + (Steam Generator Outage Summary Report for End of Cycle 12 Refueling Outage, Reply to Request for Additional Information)
- ML041420128 + (Steam Generator Outage Summary Report for End of Cycle 14 Refueling Outage)
- ML050240371 + (Steam Generator Outage Summary Report for End of Cycle 13 Refueling Outage)
- ML023380276 + (Steam Generator Outage Summary Report for End of Cycle 11 Refueling Outage Response to NRC Request for Additional Information)
- ML17312A019 + (Steam Generator Outline)
- ML041480433 + (Steam Generator Outside Diamenter Stress Corrosion Cracking Pulled Tube Examination - Cycle 5 Refueling Outage)
- ML030560407 + (Steam Generator PORV Commitment Clarification)
- ML20266D129 + (Steam Generator Pdt Mechanical Nozzle Seal Assembly. Sheet 2 of 2)
- ML20266D124 + (Steam Generator Pdt Mechanical Nozzle Seal Assembly.Sheet 1 of 2)
- 05000318/LER-1982-011-03, Steam Generator Pressure Indicator PI-1023A Read High.Caused by Mechanically Binding Force Resulting in Calibr Problem.Force Motor on Pressure Transmitter PT-1023A Replaced + (Steam Generator Pressure Indicator PI-1023A Read High.Caused by Mechanically Binding Force Resulting in Calibr Problem.Force Motor on Pressure Transmitter PT-1023A Replaced)
- ML20085D292 + (Steam Generator Pressure Test)
- 05000456/FIN-2012003-02 + (Steam Generator Primary Manway Bolts Examined with Unqualified Procedure)
- ML070890431 + (Steam Generator Program Amendment Need for Discussion)
- ML20197K034 + (Steam Generator Program Guidelines)
- ML041610191 + (Steam Generator Pulled Tube Examination Watts Bar Unit I - Cycle 5 RFO, Chapters 1 Through 5)
- ML041480437 + (Steam Generator Pulled Tube Examination Watts Bar Unit I - Cycle 5 RFO, Chapters 6 Through 10)
- ML20069M654 + (Steam Generator Reg Guide 1.121 Evaluation, Rev 2)
- ML18113A584 + (Steam Generator Repair Prog for Subj Facil.Rev Contains Supplemental Info Requested by NRC Staff)
- ML19212A239 + (Steam Generator Repair Program Progress Rept 3, June-Jul 1979)
- ML17341A868 + (Steam Generator Repair Program Radiological Progress Rept 3)
- ML18139B515 + (Steam Generator Repair Program for Surry Power Station Unit 1:Final Rept (Radiological Progress Rept Number 5) for Period 800914-810630)
- ML17345B173 + (Steam Generator Repair Program for Turkey Point Unit 4, Final Radiological Progress Rept 4 for 821010 - 830516)
- ML17341A708 + (Steam Generator Repair Program for Turkey Point Unit 3 Radiological Progress Rept 2,810823-1103)
- ML18139A026 + (Steam Generator Repair Program for Unit 2,Final Rept (Progress Rept 6) for Period 790203-1231)
- ML18114A753 + (Steam Generator Repair Program, Progress Rept 2 for 790401-0531)
- ML17345B063 + (Steam Generator Repair Program, Radiological Progress Rept for 830203-0331)
- ML18136A150 + (Steam Generator Repair Program,Progress Rept 4 for Aug-Sept 1979)
- ML18136A367 + (Steam Generator Repair Program,Progress Rept 5 for Oct-Nov 1979)
- ML17345A989 + (Steam Generator Repair Program,Radiological Progress Rept 2 for 821203-830202)
- ML17341B018 + (Steam Generator Repair Program,Radiological Progress Rept, 811231-820302)
- ML13333A926 + (Steam Generator Repair Program,Return to Power Rept)
- ML17341B588 + (Steam Generator Repair Program:Radiological Progress Rept 1 for 821010-1202)
- ML17325A893 + (Steam Generator Repair QA Program)
- ML20062K982 + (Steam Generator Repair Rept)
- ML13311A243 + (Steam Generator Repair Rept, Nonproprietary Version)
- ML18044A494 + (Steam Generator Repair Rept, Revision 4)
- ML17339A802 + (Steam Generator Repair Rept, Revision 7)
- ML17338A469 + (Steam Generator Repair Rept,Revision 6. Provides Detailed Description of Onsite Storage Facility for Replaced Steam Generator Lower Assemblies)
- ML030510412 + (Steam Generator Replacement (Sgr) Project - Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling Topical Report, Commitment Information)