Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Startup Physics Test Rept,Unit 2,Cycle 6". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20261D855  + (Start-up Range Neutron Monitoring System IRM Channel C,G Analog Section)
  • ML20261D860  + (Start-up Range Neutron Monitoring System IRM Channel D,H Analog Section)
  • ML20067A228  + (Start-up Test Rept for Rensselaer Polytechnic Inst Reactor Critical Facility)
  • ML20263J994  + (Starting Air Piping Schematic)
  • ML20261F579  + (Starting Air Piping Schematic)
  • ML20261E181  + (Starting Air Piping Schematic Zion Station Units 1 & 2.Sheet 11)
  • 05000362/LER-2001-002, Starting the Movement of Irradiated Fuel with One Train of Pacu Inoperable Causes TS Violation  + (Starting the Movement of Irradiated Fuel with One Train of Pacu Inoperable Causes TS Violation)
  • ML20198J899  + (Startup & Power Ascension Plan)
  • ML18106A672  + (Startup & Power Ascension Units 1 & 2)
  • MNS-17-038, Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate  + (Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate)
  • ML20084C263  + (Startup Assessment Team (SAT) Review Final Rept)
  • ML16340D283  + (Startup Assistance Visit to Diablo Canyon Power Plant, 820125-30)
  • ML19093B092  + (Startup Certification Audit Examination at Surry Training Center Will Be Given on 09/12/1978)
  • ML19207B263  + (Startup Data Rept for Nrc/Pacific Northwest Lab Halden Assembly IFA-513. (Rept Number Changed 790925))
  • ML17299B051  + (Startup Experience Rept:Mgt Overview)
  • ML20008E415  + (Startup Experiment Program for Yankee Reactor)
  • IR 05000353/1989027  + (Startup Insp Rept 50-353/89-27 on 890911-12 & 14-15.No Violations Noted.Major Areas Inspected:Radiological Controls Programs,Including Shield Verification Surveys,Locked High Radiation Areas & Shipment of Intermediate Range Monitor)
  • IR 05000443/1989018  + (Startup Insp Rept 50-443/89-18 on 891127-1201.No Violations Noted.Major Areas Inspected:Gaseous & Liquid Effluent Control & Radiological Environ Monitoring Programs Including Mgt Controls & Calibr of Effluent)
  • ML20151P075  + (Startup Physics Test Program Apr 1988)
  • ML20002E386  + (Startup Physics Test Rept Unit 1 Cycle 6)
  • ML20063L726  + (Startup Physics Test Rept Unit 2 Cycle 16)
  • ML20067E440  + (Startup Physics Test Rept, Re Verifying Adequacy of Cycle 3 Reload Core Design.Each Test Performed Indicated Measured Parameters Which Were within Specified Acceptance Criteria)
  • ML18152A057  + (Startup Physics Test Rept,Surry Unit 1,Cycle 14)
  • ML20244B682  + (Startup Physics Test Rept,Unit 2,Cycle 11)
  • ML19309H642  + (Startup Physics Test Rept,Unit 2,Cycle 5 Startup)
  • ML20008F816  + (Startup Physics Test Rept,Unit 2,Cycle 6)
  • ML17254A890  + (Startup Physics Testing Program)
  • ML19249D887  + (Startup Physics Testing Program for Cycle 7,summary Rept)
  • L-96-265, Startup Physics Testing Rept  + (Startup Physics Testing Rept)
  • ML20073D586  + (Startup Physics Testing Rept Unit 1 Cycle 17)
  • ML20077S455  + (Startup Physics Testing Rept,Cycle 17)
  • W3F1-2008-0057, Startup Power Escalation Report for Cycle 16  + (Startup Power Escalation Report for Cycle 16)
  • ML19308C098  + (Startup Problem Rept 2690 Re Lack of Proper Overpressure Protection on WDL-C-1A/B Tube Side)
  • ML20125B453  + (Startup Problem Rept 2690:on 780222,WDL-C-1A/B Tube Side Did Not Have Proper Overpressure Protection.Burns & Roe Proposed Solution on 780405.Action Completed Satisfactorily on 780428)
  • ML19308C102  + (Startup Problem Rept 5314 Re Acceptability of Max Flow Rate in Radwaste Gas Sys.Burns & Roe Judged Rate Acceptable)
  • ML20125B458  + (Startup Problem Rept 5314:on 780314,radwaste Gas Release Rate of 90 Scfm Could Not Be Obtained.On 780317,flow Rate of 65 Scfm Determined Acceptable by Burns & Roe)
  • ML19246A368  + (Startup Problem Rept Re Auxiliary Bldg Heating & Ventilation Sys)
  • ML20125B478  + (Startup Problem Rept Re Condensate)
  • ML20037B702  + (Startup Problem Rept for Facility)
  • ML18082A931  + (Startup Procedure 90.0,Revision 2, Special Tests Sequence Document)
  • ML18082A933  + (Startup Procedure 90.1,Revision 2, Natural Circulation Test)
  • ML18082A934  + (Startup Procedure 90.2,Revision 2, Natural Circulation W/ Simulated Loss of Offsite AC Power)
  • ML18082A936  + (Startup Procedure 90.3,Revision 2, Natural Circulation W/ Loss of Pressurizer Heaters)
  • ML18082A937  + (Startup Procedure 90.4,Revision 2, Effect of S/G Secondary Side Isolation on Natural Circulation)
  • ML19331C787  + (Startup Procedure 90.5,Revision 2, Natural Circulation at Reduced Pressure)
  • ML18082A938  + (Startup Procedure 90.6,Revision 2, Cooldown Capability of Charging & Letdown)
  • ML18082A939  + (Startup Procedure 90.7,Revision 2, Simulated Loss of All Onsite & Offsite Ac Power)
  • 05000352/FIN-2015001-02  + (Startup Procedure Considered High Pressure Coolant Injection Operable with High Reactor Water Level Trip Actuated Preventing High Drywell Pressure Automatic Actuation)
  • ML20212N392  + (Startup Procedures for Critical Facility)
  • ML20127D007  + (Startup Program Rept,Jul 1982. Incomplete 791031 Press Release I-79-144 Encl)
  • ML050050466  + (Startup Readiness)