ML20212N392
ML20212N392 | |
Person / Time | |
---|---|
Site: | Rensselaer Polytechnic Institute |
Issue date: | 03/31/1985 |
From: | RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY |
To: | |
Shared Package | |
ML20212N386 | List: |
References | |
PROC-850331, NUDOCS 8703130004 | |
Download: ML20212N392 (4) | |
Text
'
These'.STARTUP PROCEDURES, dated March, 1985,have been reviewed and approved J'
by the Nuclear Safety Review Board.
Nade Date J7+ A d $ 6 si 4/M/rr r
8'M TM f/24/gf if, a. flfp'
/
A/eu evu h4 a 5 '6.Y -
p to r%
Gb R Wkdm,n .5l8/8G P-sj> '
8703130004 870303 PDR ADOCK 05000225 Y PDR
r These STARTUP ' PROCEDURES, dated March, 1985,have been reviewed and approved by-the Nuclear Safety Review Board.
Name Date ALd $44 4/?c/rr 8%sh-W S. +/14/g.sr r.
If, e flfb'_
h /0 L ' '/~W7'
& Wa,- 5's.'C~
a i
k( &L JI7fK G R h 6-H,s 5/8/86
.Oe
%d8 e G703130004 870303 DR ADOCK 0500 5
/
STARTUP PROCEDURES FOR CRITICAL FACILITY
(.
%d 1
1 Revised by Dr. Donald R. Harris, Director March 1985
.. e
^*' .g. t STARTUP PROCEDURES
- Startup checkout Each day' when reactor operations are to take place, the facility is checked
'out to_ assure proper and safe operation.
Pre startup procedures and checklist .
O. Power on Key 0.1 Turn control console " Power On" key to the on position.
- 1. Startup channels 1.0 Turn on power for startup channels A and B.
1.1 Set each startup channel High Voltage to previously calibrated level 1.2 Check that the amplifier gains and discriminator levels are at pre--
calibrated settings 1.3 Adjust fine voltage +/-50 volts to check High Voltage plateau, and return to original setting. If a significant change in count rate occurs, as compared with previous count rates (see operation book),
(~1 recalibrate for new voltage plateau, record new voltage settings in L' Maintenance Log. Adjust discriminator level setting +/ .5 to check bias plateau and return to original setting. Recalibrate and record new settings if necessary.
1.4 Turn on audio scaler and perform 10 KHZ check on Channel A and 10 KHZ on Channel B.
1.5 Turn on audio amplifier and intercom; check that 10 KHZ signal is audiable in control room and reactor room.
- 2. Core check .
2.1 Visually inspect the reactor core, support structure, control rods and drive mechanisms, neutron source and drive mechanism, and neutron detectors'. All should be in position, free of obstructions and ready for reactor operation.
~
2.2 Close reactor room door.
- 3. Auxiliary panel 3.1 Turn on the control power switch located in the middle of panel CP-2 3.2 Check that the switches and indicator lights for door bypass and
<"' water dump bypass are normal.
,.EL) .
- . . . 1
_ w r
, r i
e 1
ADDENDUM TO ANSWER TO ,
QUESTION 16 References Nos. 2, 4, and 5.