Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000458/2014405 + (Special Inspection Report 05000458-14-405, NRC Investigation Report 4-2012-022, March 21, 2012, River Bend, Preliminary Greater than Green Finding and Apparent Violation)
- IR 05000458/2020050 + (Special Inspection Report 05000458/2020050)
- IR 05000461/2020403 + (Special Inspection Report 05000461/2020403 and Preliminary Greater than Green (Cover Letter Only))
- ML081720277 + (Special Inspection Report Questions - Transmittal E-mail)
- ML071840152 + (Special Inspection Team Charter)
- ML15139A195 + (Special Inspection Team Charter - Indian Point Nuclear Generating Unit 3 - Water Accumulation in Safety-Related Switchgear Room Following Deluge of Main Transformer Fire)
- ML18158A170 + (Special Inspection Team Charter for Inoperability of the Clinton Power Station Division 1 and Division 2 Emergency Diesel Generators)
- ML23129A606 + (Special Inspection Team Charters to Evaluate the Circumstances Surrounding the Ground Settling at the Davis-Besse Nuclear Power Station)
- IR 05000373/2017009 + (Special Inspection Team Report and Exercise of Discretion; Inspection Report 05000373/2017009; 05000374/2017009 (Jcb))
- ML18318A295 + (Special Inspection Webinar; Meeting Summary)
- ML20040G451 + (Special Inspection of Preliminary Report,Seismic Reverification Program at Diablo Canyon Units 1 and 2. Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company))
- ML20041D034 + (Special Inspection of Preliminary Report,Seismic Reverification Program at Diablo Canyon Units 1 and 2. Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company))
- ML16341B736 + (Special Inspection of Seismic Related Errors at Diablo Canyon Units 1 and 2.Docket Nos. 50-275 & 50-323.(Pacific Gas and Electric Company).Issue 1)
- ML063310486 + (Special Inspection to Review Corrective Actions for Degraded Seals on Below-Grade Electrical Penetrations)
- ML20024B175 + (Special Instructions for Training Program)
- ML19309G243 + (Special Interview of C Faust,E Frederick,F Scheimann & W Zewe on 790911 Re Tmi.Pp 1-272)
- ML19309G236 + (Special Interview of Gr Hitz on 790912 in Middletown,Pa Re TMI Incident.Pp 1-67)
- ML19309G239 + (Special Interview of Jr Floyd on 790913 in Middletown,Pa Re TMI Incident.Pp 1-139)
- 05000315/LER-1981-020, Special LER 81-020/01T-0 Per IE Bulletin 80-24:on 810701, Pinhole Nonessential Svc Water Leak Discovered in Integral Return Header of Instrument Room Ventilation Unit Copper Cooling Coil.Caused by Imperfection During Mfg Proces + (Special LER 81-020/01T-0 Per IE Bulletin 80-24:on 810701, Pinhole Nonessential Svc Water Leak Discovered in Integral Return Header of Instrument Room Ventilation Unit Copper Cooling Coil.Caused by Imperfection During Mfg Process)
- IR 05000146/1986001 + (Special Licensee Meeting Rept 50-146/86-01 on 860725.Major Areas Discussed:Current Operations & Planned Liquid Waste Removal (Water Discharge) Activities.Related Info Encl)
- ML19323G331 + (Special Loft Features for Improved Monitoring & Survival of LOCA Transients, Technical R&D Interim Rept)
- ML20031A355 + (Special Low Power Test Rept:Conducted 810513-17)
- ML20008D874 + (Special Low Power Tests Safety Evaluation)
- ML19338F565 + (Special Low Power Tests Safety Evaluation)
- ML19331D948 + (Special Low Power Tests Safety Evaluation)
- ML18082A925 + (Special Low-Power Tests Safety Evaluation)
- ML20126D117 + (Special Maint Instruction SMI-1-1-1, Preservice Baseline Insp of Low Pressure Turbines)
- ML19344D606 + (Special Maint Procedure Spl 10.7-5, Containment Air Recirculation Fans - Installation of Addl Charcoal Air Filters)
- ML20084D231 + (Special Maint Rept 73-1:on 731023-25 & 1103-05,during Startup & Initial Operation,Fischer & Porter Co Electronic Differential Pressure Transmitters,Models 2495 & 2496 Found to Fail Internally.Caused by through-bolts Not Torqued)
- PMNS20181076, Special Management Review Board Meeting + (Special Management Review Board Meeting)
- PMNS20170839, Special Management Review Board Meeting + (Special Management Review Board Meeting)
- PMNS20200170, Special Management Review Board Meeting + (Special Management Review Board Meeting)
- PMNS20200781, Special Management Review Board Meeting + (Special Management Review Board Meeting)
- ML20134B080 + (Special Mgt Rept:Marble Hill Nuclear Project)
- ML20055C859 + (Special Neutron Attenuation Test for High Density Spent Fuel Racks (Wet), Final Rept)
- ENS 42597 + (Special Nuclear Material (.003 Grams) Lost)
- ML051530459 + (Special Nuclear Material Control and Accountability Project, Final Report)
- ML051530435 + (Special Nuclear Material Control and Accountability Project Final Report)
- Regulatory Guide 5.27 + (Special Nuclear Material Doorway Monitors)
- ML20041E602 + (Special Nuclear Material Flow Projections for the Commercial Nuclear Industry)
- 05000416/LER-2009-003, Special Nuclear Material Inventory Discrepancy + (Special Nuclear Material Inventory Discrepancy)
- ML24204A264 + (Special Nuclear Material License Number 95 Licensing Project Manager Change - Pennsylvania State University)
- L-2004-163, Special Nuclear Material Reports Covering the Period from June 3, 2003 to May 26, 2004 + (Special Nuclear Material Reports Covering the Period from June 3, 2003 to May 26, 2004)
- L-2016-094, Special Nuclear Material Reports for April 1, 2015 - March 31, 2016: Cover Letter + (Special Nuclear Material Reports for April 1, 2015 - March 31, 2016: Cover Letter)
- ML20040G474 + (Special Nuclear Material SELF-PROTECTION Criteria Investigation.Phases I and II)
- L-2013-179, Special Nuclear Material Status Reports for the Period April 1, 2012 to March 31, 2013 + (Special Nuclear Material Status Reports for the Period April 1, 2012 to March 31, 2013)
- STC-23-017, Special Nuclear Material of Low Strategic Significance (SNM-LSS) Agreement State 73.67 Communication Plan + (Special Nuclear Material of Low Strategic Significance (SNM-LSS) Agreement State 73.67 Communication Plan)
- ENS 41869 + (Special Nuclear Materials Inventory Discovers a Fuel Pin Missing)
- NL-03-146, Special Nuclear Materials Report - October 2002 Through July 2003 + (Special Nuclear Materials Report - October 2002 Through July 2003)
- ML19319B499 + (Special Nuclear Matl:Authority for Access to or Control, 10CFR11,50 & 70 Proposed Rules.Proposed Program Protects Against Internal & External Threats)
- ML20125B462 + (Special Operating Procedure R-2-79-22 to Simulate Operation of Air Operated Condensate Polisher Valves W/Water in Instrument Air Line to Polisher Main Control Panel)