Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22038A163 + (Set 1 of Responses to Requests for Additional Information on Westinghouse Topical Report WCAP 18446-P/NP, Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)
- ML25196A082 + (Set 19 Requests for Additional Information Regarding Environmental Safety Chapter 9 of the License Application from TRISO-X, LLC)
- ML20311A211 + (Set 2 of NRC Staff Preliminary Clarification Questions for the Kairos Quality Assurance Program Topical Report)
- ML071170261 + (Set 2 of Response to Request for Information Re GG-ISI-002 Code Case N-716 - Enclosure to 4/12/07 to E-Mail from G. Davant, Entergy Operations, Inc. to B. Vaidya, NRR/DORL/LPL4)
- ML25090A300 + (Set 2 of Responses to Requests for Additional Information on Westinghouse Topical Report WCAP-18850, Adaptation of Full Spectrum LOCA (Fsloca) Evaluation Methodology to Perform Cladding Rupture Calculations for High Burnup Fuel)
- ML18296A024 + (Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review)
- ML22161A927 + (Set 3 of Responses and Clarifications to Requests for Additional Information on Westinghouse Topical Report WCAP 18446-P/NP, Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)
- ML13310A576 + (Set 5 RAI (Scoping and Screening))
- L-2018-193, Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review + (Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review)
- 05000456/LER-2002-001, Set Point Drift Causes Two of Three Pressurizer Safety Valve Lift Tests to Exceed Technical Specification Tolerance on April 8, 2002 + (Set Point Drift Causes Two of Three Pressurizer Safety Valve Lift Tests to Exceed Technical Specification Tolerance on April 8, 2002)
- ML20083N027 + (Set of Tables Completing App to Licensee Testimony of WR Stratton,Wa Rodger & TE Potter on Commission Question 1)
- ML20036C194 + (Setpoint Calculation LIS263-72A,B,D:Reactor Vessel Low-Low Water Level)
- ML20261G485 + (Setpoint Control LOOP Diagram - MSIV LCS Main Steam Line a Pressure Below High/Low Setpoint)
- ML030870615 + (Setpoint Document, Secondary Systems Instrument, Service and Breathing Air, Stpt 14.7)
- 05000325/LER-2018-003, Setpoint Drift in Main Steam Line Safety/Relief Valves Results in Two Valves Inoperable + (Setpoint Drift in Main Steam Line Safety/Relief Valves Results in Two Valves Inoperable)
- ML20064N300 + (Setpoint Program Determination for Westinghouse Cold Overpressure Mitigating Sys in Houston Lighting & Power South Tx Units 1 & 2,Rev 2)
- ML19337A063 + (Setpoint Study for Farley 1 & 2, Nonproprietary Version)
- Information Notice 1988-68, Setpoint Testing of Pressurizer Safety Valves with Filled Loop Seals Using Hydraulic Assist Devices + (Setpoint Testing of Pressurizer Safety Valves with Filled Loop Seals Using Hydraulic Assist Devices)
- ML18110A882 + (Setpoint of Bistable Trip Unit for Steam Generator Pressure Found Inadequately Conservative)
- ML19331B181 + (Sets Forth CPC Objections to Terms & Conditions of Proposed Settlement to Be Brought to Commissioners Attention.Urges Mod to Add Opinions of Lower Tribunals Which Establish Precedents in Proceeding)
- ML20052E283 + (Sets Forth Interpretation of Tech Specs Re Source Range Monitors & Fuel Loading Chambers,In Anticipation of Upcoming Refueling Operations)
- ML19207B415 + (Sets Forth Mods to NRC Needs Re NRC Requesting Addl Info Required for Rept on Bwr.Changes Made After Meeting W/Ge BWR Owners Group)
- ML20136B766 + (Sets Forth Principles,Expectations & Responsibilities for Mgt & Execution of Region IV Activities on Coatings Efforts at Facility)
- ML19289C701 + (Sets Out Queries to Identify Areas of Particular Interest to Commissioners Re 790119 Oral Presentations.Questions Concern Environ Dose commitments,Technetium-99 Releases & Worst Case Analysis)
- ML19257B011 + (Sets Priorities for Developing long-range Research Plans: Obtain Data,Determine Testing Conditions & Evaluate Testing Equipment)
- ML20133J073 + (Sets Reference Manual)
- ML20265A612 + (Setting Plan for Component Cooling Water Heat Exchangers. Sheet 1)
- ML19276E046 + (Settlement & Termination of Special Proceeding.Since Comptroller General Held That NRC Was Not Responsible for Investigative Fees,Considers Issue Settled.W/Supporting Documentation)
- ML18225A261 + (Settlement Agreement Amendment (Attachment to Joint Status Report))
- ML19317E262 + (Settlement Agreement Between Applicant,Municipal Intervenors,Nc Electric Membership Corp & Blue Ridge Electric Membership Corp)
- ML17208A703 + (Settlement Agreement Between City of Orlando,Fl,Orlando Utils Commission & Util Providing for Transfer of 6.08951% Ownership Share to Utils Commission.Release & Certificate of Svc Encl)
- ML21096A083 + (Settlement Agreement Between Commonwealth of Massachusetts and Holtec)
- ML18066A735 + (Settlement Agreement Between Entergy, Northstar, State of Vermont Agencies, and Others Related to the Proposed Purchase and Sale of the Vermont Yankee Nuclear Station (License DPR-28, Docket No. 50-271))
- ML20126K010 + (Settlement Agreement Between Util & Cities of Anaheim, Banning & Riverside,Ca.Cities Will Amend Petition to Intervene by Withdrawing Objections to AEC Licensing Proceedings.Ltrs Encl)
- ML20032B231 + (Settlement Agreement Between Util & City of Cincinnati.City Will Withdraw as Party from Proceedings & Contentions Will Be Dismissed W/Prejudice.Util Will Install & Maintain Telemetry Sys as Listed)
- ML20010F075 + (Settlement Agreement Between VEPCO & Nc Municipal Power Agency Number 3 Including Agreement for Interim Electric Svc & Agreement for Transmission Use & Other Electric Svc)
- ML050120077 + (Settlement Agreement Between the Tennessee Valley Authority and the Nuclear Regulatory Commission - Review of Safety Conscious Work Environment Training)
- ML20072D622 + (Settlement Agreement Re Disposition of J Reed Contentions & Util Motions for Summary Disposition.Util Will Withdraw Motions for Summary Disposition of Contentions 6 & 16. Certificate of Svc Encl)
- ML20072P105 + (Settlement Agreement Re Disposition of J Reed Contentions 4, 11 & 15.Certificate of Svc Encl)
- ML20054F322 + (Settlement Agreement Re Shoreham Opponents Coalition Contention 16 on Clad Swelling & Flow Blockage.Certificate of Svc Encl)
- ML11355A203 + (Settlement Agreement Regarding New York State Contention 24)
- ML20054E125 + (Settlement Agreement Terminating Civil Case 79-1368.NRC Will Prepare Programmatic Eis.Util Will Not Discharge Wastewater Into Susquehanna River Until EIS Published.All Claims Will Be Brought Before NRC Initially)
- ML20009H430 + (Settlement Agreement That Gainsville,Fl Will Withdraw from Rc Proceeding & Withdraw Request for Hearing & Appeal.City Will Stipulate Dismissal of Antitrust Cases W/Prejudice. Proposed Stipulations Encl)
- ML20032A010 + (Settlement Agreement That Util Install Telemetry Sys as Listed Prior to Reactor Being Made Critical.Cincinnati Will Withdraw from Proceeding as Party)
- ML20079R237 + (Settlement Agreement,Executed by Util Re Disposition of J Reed Contentions.Util Will Withdraw Motion for Summary Disposition of Reed Contentions 6 & 16.Parties Will Attempt to Settle Contentions 4,11 & 15.Svc List Encl)
- ML20049H455 + (Settlement Agreement,Stipulation & Order.Nfs Will Surrender Low Level Storage Facilities Upon DOE Takeover & Authority Will Assume Responsibility.Accepted & So Ordered by Us District Court,Western District of Ny)
- ML20128K380 + (Settlement Agreement.* 960905 & 09 Telcons Between J Shelton & J Lieberman,Shelton Indicated That Testco Desired to Settle Matter W/O Further Litigation.Nrc Agreed.W/ Certificate of Svc.Served on 961001)
- ML20059A940 + (Settlement Agreement.* Agreement Between Nrc,Rl Dickherber & Util)
- ML20206N024 + (Settlement Agreement.* Agreement Made & Entered Into on 881121 Between Intervenor & Licensee Re 880108 Application for Amend to License R-101 Re Decommissioning & Removal of Reactor.Related Documentation & Certificate of Svc Encl)
- ML20043A698 + (Settlement Agreement.* Agreement for Basin Testing Lab,Inc to Withdraw Request for Hearing & Pay $5,000 Civil Penalty, Agreement That General License Should Not Be Suspended & That Order Approving Settlement Needed Noted)
- ML20246F147 + (Settlement Agreement.* Certificate of Svc Encl)