Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Safety Evaluation Supporting Relief from Inservice Testing Program". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20062B785  + (Safety Evaluation Supporting Reactor Protection Sys Power Monitoring Sys Mod)
  • ML13330B393  + (Safety Evaluation Supporting Reactor Trip Sys Reliability, on-line Testing)
  • ML20041B073  + (Safety Evaluation Supporting Reactor Water Cleanup Sys Pipe Repairs)
  • ML17139D080  + (Safety Evaluation Supporting Reanalysis of Feedwater Penetration Bypass Leakage.Util Proposal to Not Test Feedwater Isolation Valve for Bypass Leakage Requirements Acceptable)
  • ML19345A367  + (Safety Evaluation Supporting Reduction of Accumulator Pressure to 352 Psia Making ECCS Performance Conform W/Loca Analysis Submitted in Suppl 8 to Proposed Change 125 Transmitted W/Util to NRC)
  • ML19261A578  + (Safety Evaluation Supporting Reevaluation of Petroleum Product Pipeline Across Site)
  • ML20005A957  + (Safety Evaluation Supporting Ref of Basic Safety Rept as Fuel Assembly & Safety Analysis Rept)
  • ML17059B449  + (Safety Evaluation Supporting Reinspection of Core Shroud During RFO-14 Re License DPR-63)
  • ML20151R856  + (Safety Evaluation Supporting Related Inservice Testing Program & Request for Relief of Utils)
  • ML20058L703  + (Safety Evaluation Supporting Relaxation of RG 1.97 Environ Qualification Requirements Re Pressurized Water Reactors Accumulator Pressure & Volume Instrumentation)
  • ML20137Z164  + (Safety Evaluation Supporting Release of Shift Advisors from Advisory Duties)
  • ML20133C072  + (Safety Evaluation Supporting Release of Shift Advisors. License Condition 2.C.(29) Met)
  • ML18066A625  + (Safety Evaluation Supporting Relief Request of Quality & Safety to License DPR-20)
  • ML17354A359  + (Safety Evaluation Supporting Relief Requests 14 & 15 of Licenses DPR 31 & 41,respectively.Relief Request 17 Denied)
  • ML18153C681  + (Safety Evaluation Supporting Relief Request P-4 of Inservice Testing Program for Outside Recirculation Spray Pump)
  • ML18106B098  + (Safety Evaluation Supporting Relief Requests to Licenses DPR-70 & DPR-82,respectively)
  • ML18152B648  + (Safety Evaluation Supporting Relief Requests IWE-2,4.5.6 & IWL-2 to Licenses DPR-32 & DPR-37 Respectively)
  • ML14183A929  + (Safety Evaluation Supporting Relief Requests IWE/IWL-01 Through IWE/IWL-09)
  • ML20196D965  + (Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee)
  • ML15112A697  + (Safety Evaluation Supporting Relief Request Re Catawba Units 1 & 2,2nd 10-yr Interval,Mcguire Units 1 & 2,2nd 10-yr Interval & Oconee Units 1,2 & 3,3rd 10-yr Interval)
  • ML14183A771  + (Safety Evaluation Supporting Relief Request SI-PRR-1 That Proposes Alternative to Code Test Frequency Requirements of ASME Sect Xi,Paragraph Iwp 3400,for Installed Spare SI Pump B W/Determination That Compliance Would Result in Hardship)
  • ML20054F861  + (Safety Evaluation Supporting Relief Request for Inservice Insp Hydrostatic Test Requirements)
  • ML15112B058  + (Safety Evaluation Supporting Relief Request for Facility Inservice Testing Program.Request Granted Based on Reconsideration of Original Decision)
  • ML17263B114  + (Safety Evaluation Supporting Relief Request 13,rev 1)
  • ML20128B960  + (Safety Evaluation Supporting Relief for 16 MSIVs from 1980 Edition of ASME Section XI Code Requiring Increased Frequency of Leak Rate Testing Based on Leak Rate Trending of 6-inch & Larger Valves)
  • ML20155F264  + (Safety Evaluation Supporting Relief from Inservice Testing Program)
  • ML20196E720  + (Safety Evaluation Supporting Relief from ASME Section XI Requirements Re Replacement of Component Cooling & Recirculation Spray HXs)
  • ML20205R706  + (Safety Evaluation Supporting Relief from Certain ASME Code Hoop Stress Requirements Until Next Refueling Outage to Repair Flaw in Base Metal of Steam Generator Main Steam Line 12)
  • ML19343B181  + (Safety Evaluation Supporting Relief from Inservice Insp Requirements of Section XI ASME Code to Allow Postponement of Category B-L-2 Exam Beyond Insp Interval Ending 801228)
  • NUREG-0103, Safety Evaluation Supporting Relief from Inservice Insp Requirements of ASME Boiler & Pressure Vessel Code Requiring Quarterly Stroke Testing of RCS Valves & Denying Relief from Code Requirements for Valve RC-11 Testing  + (Safety Evaluation Supporting Relief from Inservice Insp Requirements of ASME Boiler & Pressure Vessel Code Requiring Quarterly Stroke Testing of RCS Valves & Denying Relief from Code Requirements for Valve RC-11 Testing)
  • ML17346A864  + (Safety Evaluation Supporting Relief from Performing Certain Volumetric & Surface Exams of Regenerative HXs Required by ASME Boiler & Pressure Vessel Code,Section XI,1980 Edition Through Winter 1981 Addenda)
  • ML20003J075  + (Safety Evaluation Supporting Relief from Requirements of Section XI ASME Code Re Inservice Valve Testing.Core Requirements & Staff Position Re Verification of Pressure Isolation Valve Leak Tight Integrity Encl)
  • ML18087A867  + (Safety Evaluation Supporting Relief from Inservice Insp Requirements Per 10CFR50.55a(g).Alternative Procedures & Schedules Defined)
  • ML17221A552  + (Safety Evaluation Supporting Relief from ASME Code Re Inservice Insp Requirements)
  • ML20127P662  + (Safety Evaluation Supporting Relief from ASME Code Section XI Inservice Testing Program Requirements W/Listed Exceptions)
  • ML20127E135  + (Safety Evaluation Supporting Relief from ASME Boiler & Pressure Vessel code-requirement to Perform Surface Exam of Welded Attachments for RHR HX)
  • ML17241A426  + (Safety Evaluation Supporting Relief from ASME Code Requirements Related to Inservice Insp Program Second 10-year Interval for Unit 2)
  • ML19345G962  + (Safety Evaluation Supporting Relief from Requirements of Section XI ASME Code)
  • ML20137T339  + (Safety Evaluation Supporting Relocation of Missile Shields & W30X173 Beams from D-ring B to a)
  • ML13324A918  + (Safety Evaluation Supporting Remedial Actions to Resolve Steam Generator Tube Degradation Identified in 1985 Steam Generator Insp,Per Tech Spec 4.16.E.4.b)
  • ML16341E545  + (Safety Evaluation Supporting Removal of Autoclosure Interlock Function.Nrc Believes That Procedural Enhancements Proposed by Licensee Add Considerably to Plant Safety)
  • ML20211J242  + (Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2)
  • ML20151Y466  + (Safety Evaluation Supporting Removal of Seismic Restraints & Qualification of Existing Spent Fuel Racks as free-standing Racks,Per 880624 Application for Amend to License)
  • ML20237G600  + (Safety Evaluation Supporting Renewal of License SNM-0561)
  • ML20028G358  + (Safety Evaluation Supporting Renewal of License SNM-1097 for 1-yr Period)
  • ML20239A188  + (Safety Evaluation Supporting Renewal of License SNM-1227)
  • ML20032B138  + (Safety Evaluation Supporting Renewal of License SNM-142)
  • ML20215J744  + (Safety Evaluation Supporting Renewal of License SNM-142 for 5-yr Period)
  • ML20052F058  + (Safety Evaluation Supporting Renewal of License SNM-1513)
  • ML19327A122  + (Safety Evaluation Supporting Renewal of License SNM-1526)
  • ML20210A801  + (Safety Evaluation Supporting Renewal of License SNM-844)