Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209G166 + (SPDS Safety Analysis for Rancho Seco Nuclear Generating Station Unit 1)
- ML20206F689 + (SPDS Sar)
- ML20207E240 + (SPDS Sar)
- ML17298B932 + (SPDS Sar)
- ML20100E095 + (SPDS Sar,Millstone Nuclear Power Station,Unit 2)
- ML20207H965 + (SPDS Software Verification & Validation Summary Package, Catawba Nuclear Station)
- ML20207H933 + (SPDS Status Trees Development Summary Package,Catawba Nuclear Station)
- ML20136H268 + (SPDS TMI Action Plan I.D.2)
- ML20151P585 + (SPDS Verification & Validation Program Plan)
- ML22026A044 + (SPEC Group PSC, Notice of License Expiration, 52-24862-01)
- IR 07100102/2023201 + (SPEC Inspection Report 71-0102/2023-201 Corrective Actions Status Call)
- ML20149D676 + (SPEC QA Program - NRC Coc 0102 Internal Audit Rept)
- ML25161A174 + (SPEC-150 CoC No. 9263, Revision 11)
- ML25161A179 + (SPEC-150, CoC No. 9263, Revision 11)
- ML25161A181 + (SPEC-150, CoC No. 9263, Revision 11, SER)
- ML20071L784 + (SPES-2 Facility Description)
- ML20091M383 + (SPES-2 Hot Preoperational Test H-06 Inadvertent ADS Stage 1 Actuation (with No ADS Stage 4))
- ML18257A227 + (SPRA (Fukushima 50.54f) Audit (Clarification) Questions - Plant Response)
- ML19004A335 + (SPRA (Fukushima 50.54f) Audit Follow-Up Clarification Question on Plant Modifications)
- ML18257A231 + (SPRA (Fukushima 50.54f) Audit Questions - 2nd Set)
- ML20085F931 + (SPRA - Spr Audit Questions - 2nd Batch)
- ML20087N663 + (SPRA - Spr Audit Questions Redacted)
- ML18257A223 + (SPRA Audit Questions)
- ML19323E793 + (SPRA Completeness Review)
- ML19056A445 + (SPRA Document Requests and Initial Questions)
- ML19113A168 + (SPRA Questions-PRA Group)
- ML15233A074 + (SPRA Relief - Information to Support Reconsideration of Hatch U1 for Inclusion in SPRA Relief Due to Seismic Robustness and Similarities to Hatch U2)
- ML20105A507 + (SPRA Report Staff Assessment)
- ML17041A342 + (SPRA Review Checklist)
- ML19122A256 + (SPRA Revised PRA Question 3)
- ML17004A058 + (SPRA for 5069 -Basis for Change)
- ML19016A505 + (SPS SLR Scoping Dominion)
- ML19016A506 + (SPS SLR Scoping Franklin-Southampton Area CoC Board)
- ML19016A507 + (SPS SLR Scoping Hampton Roads Chamber)
- ML19016A508 + (SPS SLR Scoping Hampton Roads Economic Dev Alliance)
- ML19016A509 + (SPS SLR Scoping Hrmffa)
- ML18151A286 + (SPS Unit 2 ISI Summary Rept for 1997 Refueling Outage)
- ML18151A398 + (SPS Unit 2 ISI Summary Rept for 1999 Refueling Outage)
- ML20053D237 + (SPTH3:Subroutine for Finding Shortest Sabotage Paths)
- ML102430446 + (SQN 2 SG ISI Report Clarification)
- ML13298A034 + (SQN Air Quality Permit, Expire on 7-17-2017, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.A.II.3)
- ML13298A029 + (SQN Annual Air Inspection Report 2007, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.ii.4)
- ML13289A199 + (SQN Annual Water Withdrawal Updates for January 2011)
- ML13289A201 + (SQN Annual Water Withdrawal Updates for January 2012)
- ML13289A198 + (SQN Annual Water Withdrawal Updates for July 2010)
- ML13289A200 + (SQN Annual Water Withdrawal Updates for July 2011)
- ML15103A585 + (SQN Continued Storage Note to File - OGC Comments)
- ML13298A031 + (SQN Femp Energy and Ghg Reporting Tool: Results Summary Fy 2008 - Fy 2012 Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.9 (7 Pages))
- ML13298A030 + (SQN List of Potential Sources of Ghg Emissions Due to Refrigerant Leaks Submitted on Cd Attached to Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.3)
- ML20080G858 + (SQN NIS-1 Owners Data Rept Unit 2,Cycle 6, Vols 1 & 2)
- ML15104A689 + (SQN Record of Decision)