Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "SER Re Steam Generator Water Hammer". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20195D417  + (SER Re Pump & Valve Inservice Testing Program)
  • ML20154C720  + (SER Re QA Program for Operations Described in FSAR Through Amend 85 Plus)
  • ML20204K056  + (SER Re Recombiner Capability Requirements,Per Generic Ltr 84-09.Exemption Request Granted)
  • ML17199S850  + (SER Re Regulation of Expansion Gap Fire on 860120 at Facility)
  • ML20214E423  + (SER Re Reliability & Operability of Tdi Diesel Engines as Source for Emergency Power.Engines Will Continue to Provide Reliable Svc Until Next Refueling Outage)
  • ML20117E326  + (SER Re Reliability of Tdi Divs I & II Diesel Generators.Tdi Diesel Engines Will Provide Reliable Standby Source of Onsite Power Per GDC 17)
  • ML18065A900  + (SER Re Relief Requests for Third 120-month Internal Inservice Testing Program.One Request Denied,Three Requests Approved for Interim Period & Remaining Requests Approved)
  • ML18092B538  + (SER Re Repair of Svc Water Sys Piping.Weld Overlay Repairs Together W/Radiograph Insps & Supporting Engineering Analysis Constitute Acceptable Repair Method for Pitting Degradation in Svc Water Sys Fan Cooler Piping)
  • ML20236N333  + (SER Re Request for Interpretation of EDG TS 4.8.1.1.2.e for Farley Nuclear Plant,Units 1 & 2)
  • ML14191A416  + (SER Re Request for Relief from ASME Code Requirements. Relief Request 15 Granted & Relief Requests 16-18 Denied)
  • ML13331A417  + (SER Re Request for Relief from Inservice Testing Requirements)
  • ML20127P693  + (SER Re Review of 850417 & 0501 Applications for Amend to License SNM-1895,authorizing Installation of Neutron Detectors in Reactor Vessel & Performance of Preoperational Tests.Amend Issuance Recommended Subj to Listed Conditions)
  • ML20133B480  + (SER Re Review of Tech Spec 3/4.7.1, Standby Svc Water Sys. Recommends Action Paragraph Be Modified to Read as Listed. SALP Input Encl)
  • ML20248E323  + (SER Re Revised Radiological Contingency Plan Dtd 890524. Concludes That Effectiveness of Subj Plan Not Reduced by Revs)
  • ML20207T424  + (SER Re SPDS Based on Documentation & 850513-15 Audit.Spds Does Not Fully Meet Requirements of Suppl 1 to NUREG-0737. Five Listed Variables Should Be Added to Spds.Interim Implementation Acceptable)
  • ML20215B872  + (SER Re Safety & Relief Valve Testing,Per NUREG-0737,Item II.D.1 or Multi-Plant Action F-14.Info Demonstrates Ability of RCS Porvs,Porv Block Valves,Safety Valves & Associated Piping to Function Under Expected Operating Conditions)
  • ML20198S178  + (SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2)
  • ML16342C318  + (SER Re Second 10-year Interval Inservice Inspection Program Plan & Associated Requests for Relief for Diablo Canyon Power Plant,Units 1 & 2)
  • ML14192A579  + (SER Re Seismic Qualification of Auxiliary Feedwater Sys.Sys Seismically Qualified & Able to Provide safety-related Function Following SSE)
  • ML20236X537  + (SER Re Seismic Qualification of Plant Auxiliary Feedwater Sys.Nrr Request for Addl Info Encl)
  • ML20235G965  + (SER Re Setpoint Methodology for Rosemont Replacement Transmitters.Licensee Proposed Methodology Not Adequate to Allow Approval to Be Used in Application of Units)
  • ML20141J174  + (SER Re Spds.Sys Insufficiently Human Factored to Allow User to Rapidly & Reliably Evaluate All Critical Safety Functions Required by NRC)
  • ML17255A488  + (SER Re Stagnant Flow Scenarios & Pressurized Thermal Shock Based on Info Submitted w/821122 Ltr.Risk Associated W/Pressurized Thermal Shock Acceptable Based on Involvement W/Westinghouse Owners Group)
  • ML17058A835  + (SER Re Station Blackout Evaluation for Facility)
  • ML20062C444  + (SER Re Station Blackout.Plant Does Not Conform W/Station Blackout Rule)
  • ML20209H955  + (SER Re Tdi Diesel Generator Owners Group Findings & Recommendations for Operabilty/Reliabilty of Tdi Emergency Diesel Generators)
  • ML13322B054  + (SER Re Tdi Generator Crankshaft Cranking Problem at Plant. Licensee Must Demonstrate That Eddy Current Insp Procedure Is Capable of Detecting 10 Mil Deep Flaws)
  • ML17215A336  + (SER Re Thermal Shield Recovery Program)
  • ML17309A314  + (SER Re Thermal Sleeve Problems in Westinghouse Plants. Viewgraphs Encl)
  • ML20154Q973  + (SER Re Topical SAR for NAC-C28 Storage/Transport Cask Submitted by Nuclear Assurance Corp. Cask Design Acceptable Per 10CFR72 Requirements)
  • ML20198N951  + (SER Re Util 820715 & 830113 Responses to NRC 820104 Request for Addl Info Re Multi-Plant Action B-24.Licensee Will Be Required to Provide Formal Documentation of Mods & Schedule for Completing Design Changes)
  • ML20205T508  + (SER Re Util 820917,830701 & 0922 Applications for Amends to Licenses DPR-77 & DPR-79,changing Tech Specs to Permit Increase in Flow Rate of Air from Containment During Normal Operation.Changes Unacceptable)
  • ML20215G017  + (SER Re Util 830202,1216,840113 & 850528 Responses to Generic Ltr 82-33 Re Conformance to Reg Guide 1.97,Rev 2,as Applied to Emergency Response Facilities.Design Acceptable.Salp Input Encl)
  • ML20215G113  + (SER Re Util 830414,850315,0620,0906 & 860121 Responses to Reg Guide 1.97.Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 2,w/exception of Containment Sump Water Temp)
  • ML20155F994  + (SER Re Util 830415 & 860206 Responses to Generic Ltr 82-33 Concerning How Facility Meets Guidelines of Reg Guide 1.97 as Applied to Emergency Response Facilities.Applicant Conforms to Reg Guide Except for Listed Variables)
  • ML20209F324  + (SER Re Util 830418 Response to Generic Ltr 82-33 Re Conformance of post-accident Monitoring Instrumentation to Rev 2 of Reg Guide 1.97.Response Acceptable)
  • ML20196G908  + (SER Re Util 831104 & 850208 Responses to Generic Ltr 83-28, Item 2.2.1, Equipment Classification (Program for All Safety-Related Components. Responses Acceptable)
  • ML20127N313  + (SER Re Util 831104 Response to Generic Ltr 83-28,Item 1.2, Post-Trip Review (Data & Info Capability). Licensee post-trip Review Data & Info Capabilities Acceptable)
  • ML20133H732  + (SER Re Util 831104 Response to Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Concerning Reactor Trip Sys Reliability. Licensee Should Add Undervoltage Trip Attachment to Trending Program)
  • ML18142A129  + (SER Re Util 831104 Response to Generic Ltr 83-28,Item 4.3, Reactor Trip Breaker Automatic Shunt Trip. Mods Acceptable.Breaker Position Status Indication Should Be Provided on Main Control Board)
  • ML20129D545  + (SER Re Util 831104 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review Program & Procedures.Program & Procedures Acceptable Subj to Implementation of Listed Recommendations)
  • ML20203B155  + (SER Re Util 831104 Response to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification. Program Acceptable. Exemption of Turbine Trip Component from Listing Also Acceptable)
  • ML20212D727  + (SER Re Util 831104 Response to Generic Ltr 83-28,Item 2.1 (Part 2), Vendor Interface Programs for Reactor Trip Sys Components. Response Acceptable.Item 2.1 Closed)
  • ML20210C470  + (SER Re Util 831104 Response to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification & Vendor Interface. Response Acceptable)
  • ML20127N991  + (SER Re Util 831105 Response to Generic Ltr 83-28,Item 1.1., Post-Trip Review. Program & Procedures Inadequate)
  • ML20197H226  + (SER Re Util 831105,840229 & 860404 Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review Data & Info Capabilities. Responses Acceptable)
  • ML20128J993  + (SER Re Util 831107 & 840430 Responses to Generic Ltr 83-28, Item 1.1, Post-Trip Review. Program & Procedures Acceptable)
  • ML20215E012  + (SER Re Util 831118 & 860812 Responses to Generic Ltr 83-28, Items 3.1.3 & 3.2.3 Re post-maint Testing (Reactor Trip Sys Components,All Other safety-related Components).Responses Acceptable)
  • ML17277B779  + (SER Re Util 831118 Response to Generic Ltr 83-28,Item 1.1 on post-trip Review Program Description & Procedure.Program & Procedures Acceptable)
  • ML20215D832  + (SER Re Util 840229 & 860529 Responses to Generic Ltr 83-28, Items 3.2.1 & 3.2.2 Re post-maint Testing of safety-related components.Post-maint Testing Program Acceptable)