Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342A714 + (SER Approving Util 851226 & 860820 Requests for Relief from ASME Code Inservice Testing Requirements)
- ML17324A767 + (SER Approving Util 860203 Requests for Relief from Inservice Pressure Test Insp Requirements of ASME Boiler & Pressure Vessel Code Section Xi,Subsections IWB-5000 & IWC-5000)
- ML20036A231 + (SER Approving Util 930115 Request Re Onsite Disposal of Contaminated Radioactive Const Soil,Per 10CFR20.302(a))
- ML20236W427 + (SER Approving WCAP-14333P (Proprietary) & WCAP-14334NP (non-proprietary), Probabilistic Risk Analysis of RPS & ESFAS Test Times & Completion Times)
- ML17332A835 + (SER Authorizing Alternative for Hydrostatic Testing Contained in Licensee Proposal Per 10CFR50.55a(3)(ii) for Class 1,2 & 3 Sys as Compliance W/Specified Hydrostatic Testing Requirements Would Result in Hardship)
- ML20024J208 + (SER Authorizing Alternatives Contained in Request for Relief 3-26,per 10CFR50.55(a)(3)(i).Ack Withdrawal of Request for Relief 3-19)
- ML17158A581 + (SER Authorizing Licensee Proposed Alternative to Use Code Case N-416-1 Per 10CFR50.55(a)(3)(ii))
- ML18016A994 + (SER Authorizing Licensee Relief Request 2RG-008,pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year Interval of Shearon Harris Nuclear Power Plant ISI Program)
- ML20217D205 + (SER Authorizing Licensee to Use Code Case N-524 Until Such Time as Code Case Included in Future Rev of RG 1.147)
- ML20216J666 + (SER Authorizing Organizational Changes.Approval of Amend Application Recommended)
- ML17158A235 + (SER Authorizing Per 10CFR50.55(a)(3)(ii),proposed Alternative to Code Hydrostatic Test Requirements for Replacement of Two Reactor Recirculation Sys Valves)
- ML17263A453 + (SER Authorizing Per 10CFR50.55a(a)(3)(ii) Proposed Code Alternative to Code Requirements Based on Determination That Compliance W/Specified Requirements Results in Hardship W/O Compensating Increases in Quality & Safety)
- ML20045G673 + (SER Authorizing Proposed Alternative Tests Per 10CFR50.55a(a)(3)(i).Concludes That Acceptable Level of Quality & Safety Will Be Maintained Using Proposed Alternative Tests Instead of Required Hspt)
- ML20195H176 + (SER Authorizing Proposed Alternative in Relief Requests RV-06,RV-07,RV-09,RV-11,RV-12 & RV-15 Pursuant to 10CFR50.55a(a)(3)(ii).RV-08 Granted Pursuant to 10CFR50.55a(f)(6)(i) & RV-13 Acceptable Under OM-10)
- ML20196G702 + (SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles)
- ML17263A822 + (SER Authorizing Proposed Alternatives Contained in Extension to RR 25 to Support Welded Repair or Replacement Activities for Svc Water Sys Components Through 1995 Refueling Outage)
- ML20206C848 + (SER Authorizing Pse&G Proposed Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B Pursuant to 10CFR50.55a(a)(3)(i))
- ML20151T052 + (SER Authorizing Storage of U Enriched Up to 5.0 Weight % in U-235 Isotope)
- ML18011B069 + (SER Authorizing Use of Code Case N-416-1,per 10CFR50.55a(a)(3)(ii) in Conjuction W/Provision That Addl Surface Exams Performed on Root Pass Layer of Butt & Socket Weld on Pressure Retaining Boundary of Class 3 Components)
- ML20217K915 + (SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i))
- ML20128F992 + (SER Based on Util 831104 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review Program Description & Procedures. Program & Procedures Acceptable)
- ML20128M939 + (SER Based on Util 831105 Response to Generic Ltr 83-28, Item 1.1 Re post-trip Review Program Description & Procedure)
- ML20126L496 + (SER Based on Util 831107 Response to Generic Ltr 83-28,Item 1.1, Post-Trip Review. Addl Info Requested to Correct Listed Deficiencies)
- ML022590490 + (SER Chapter 1 with Open Items Related License Renewal)
- ML022590498 + (SER Chapter 2, 2 Structures)
- ML022590503 + (SER Chapter 3 Aging Management)
- ML022590519 + (SER Chapter 4 Time-Limited Aging Analyses)
- ML022590527 + (SER Chapters 5 & 6 and Others)
- ML071550131 + (SER Compliance with WCAP-16260-P-A the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement)
- ML071280340 + (SER Compliance with WCAP-16260-P-A the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement, (Non-Proprietary Version))
- ML081090192 + (SER Compliance with WCAP-16260-P-A, Rev. 1, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement)
- ML081090191 + (SER Compliance with WCAP-16260-P-A, Rev. 1, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement)
- ML11119A237 + (SER Compliance with WCAP-16260-P-A, Revision 1, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement)
- ML20198E978 + (SER Concluding Applicant Demonstrated That Structural Integrity of Sacrificial Shield Wall Will Meet Design Requirements W/Known & Postulated Flaws)
- ML20205T227 + (SER Concluding No Requirement for Licensee to Operate in Conformance w/RM-50-2 Exists)
- ML20212F564 + (SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits)
- ML20011E140 + (SER Concluding That Auxiliary Feedwater Actuation Circuit Design Conforms to Requirements of 10CFR50.62 (ATWS Rule) & Acceptable,Subj to Review & Acceptance of Common Mode Failure Analysis)
- ML20042H039 + (SER Concluding That Diverse Emergency Feedwater Actuation Sys Designs Acceptable & Meet Requirements of ATWS Rule (10CFR50.62))
- ML20149D267 + (SER Concluding That Exemption from Listed Fire Areas Should Be Granted & Exemption from Fire Area FH-FZ-5 Should Be Denied)
- ML17329A121 + (SER Concluding That Facilities Meet Intent of Review Criteria for Generic Ltr 83-28,Item 1.2 Re post-trip Review - Data & Info Capability)
- ML17261A441 + (SER Concluding That Facility Designed to Permit on-line Functional Testing of Reactor Trip Sys,Including Independent Testing of Diverse Trip Features of Reactor Trip Breakers. Util Meets Staff Position of Generic Ltr 83-28,Item 4.5.2)
- ML20210B502 + (SER Concluding That Fuel Transfer Tube Expansion Joints Subj to Type B Testing When Part of Containment Pressure Boundary)
- ML20129K314 + (SER Concluding That Ga Atomics Hot Cell Facility Decommissioning Plan Should Be Approved)
- ML20202B409 + (SER Concluding That Ga Request to Reduce Licensed Activities Meets Regulatory Requirements)
- ML18058A361 + (SER Concluding That Licensee Adequately Demonstrated That Plant High Thermal Performance Fuel Assemblies Will Maintain Structural Integrity & Functionality When Subjected to Safety Shutdown Earthquake)
- ML17056B398 + (SER Concluding That Licensee Corrective Actions,Based on Root Cause Analysis,Appropriate for Restart of Plant)
- ML14178A711 + (SER Concluding That Licensee Documentation Does Not Demonstrate Qualification for Submergence)
- ML20207G025 + (SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05)
- ML20204H495 + (SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05)
- ML16342A509 + (SER Concluding That Licensee Has Provided Adequate Justification for Deviations from & Exception to RG 1.97, Rev 3 for Instrumentation That Monitors RCS Hot & Cold Leg Temp)
- ML17310A577 + (SER Concluding That Licensee Has Provided Reasonable Assurance That Adequate Shoulder Gap Clearance Being Maintained & Commitment to Perform Shoulder Measurements No Longer Necessary)