Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CPSES-200502416, Revision to Technical Specification 5.6.6; Reactor Coolant System Pressure and Temperature Limits Report + (Revision to Technical Specification 5.6.6; Reactor Coolant System Pressure and Temperature Limits Report)
- GNRO-2014/00091, Revision to Technical Specification 5.6.5.b to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density + (Revision to Technical Specification 5.6.5.b to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density)
- ML022960549 + (Revision to Technical Specification Associated with Reduction of Decay Time for Core Offload for Seabrook Station)
- ML24249A057 + (Revision to Technical Specification Bases)
- ML17090A450 + (Revision to Technical Specification Bases - B 3.6.15)
- ML17118A075 + (Revision to Technical Specification Bases Manual)
- ML121850019 + (Revision to Technical Specification Bases Manual)
- ML12110A083 + (Revision to Technical Specification Bases Manual)
- ML090510152 + (Revision to Technical Specification Bases Manual)
- ML100810094 + (Revision to Technical Specification Bases Manual)
- ML12242A342 + (Revision to Technical Specification Bases Unit 1 Manual)
- ML060870407 + (Revision to Technical Specification Bases Unit 1 Manual)
- ML14321A410 + (Revision to Technical Specification Bases, Manual)
- ML18128A203 + (Revision to Technical Specification Bases, Manual)
- ML101130051 + (Revision to Technical Specification Bases, Manual)
- ML022130336 + (Revision to Technical Specification Chapter 5.0, Administrative Controls from Wolf Creek Nuclear Operating Company)
- NL-18-0601, Revision to Technical Specification End State for Residual Heat Removal Drywell Spray + (Revision to Technical Specification End State for Residual Heat Removal Drywell Spray)
- GO2-03-167, Revision to Technical Specification LCO 3.0.4 and SR 3.0.4 Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process (CLIIP) + (Revision to Technical Specification LCO 3.0.4 and SR 3.0.4 Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process (CLIIP))
- ULNRC-05463, Revision to Technical Specification Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (License Amendment Request OL-1287) + (Revision to Technical Specification Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (License Amendment Request OL-1287))
- ML020370395 + (Revision to Technical Specification SR 3.0.3, Missed Surveillances)
- ML023240337 + (Revision to Technical Specification Section 5.0 Administrative Controls (R.E. Cooper Nuclear Station))
- ET 02-0029, Revision to Technical Specification Surveillance Requirements 3.3.1.2 and 3.3.1.3 Re Reactor Trip System Instrumentation + (Revision to Technical Specification Surveillance Requirements 3.3.1.2 and 3.3.1.3 Re Reactor Trip System Instrumentation)
- PLA-6046, Revision to Technical Specification Surveillance Requirements 3.8.4.7 and SR 3.8.4.8 + (Revision to Technical Specification Surveillance Requirements 3.8.4.7 and SR 3.8.4.8)
- ML063180569 + (Revision to Technical Specification to Include Oscillation Power Range Monitor)
- CPSES-200600097, Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation, 3.3.2, ESFAS Instrumentation, 3.4.5, RCS Loops-Mode 3, 3.4.6, RCS Loops-Mode 4, and 3.4.7, RCS Loops-Mode 5, Loops Filled + (Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation, 3.3.2, ESFAS Instrumentation, 3.4.5, RCS Loops-Mode 3, 3.4.6, RCS Loops-Mode 4, and 3.4.7, RCS Loops-Mode 5, Loops Filled)
- WO 11-0008, Revision to Technical Specifications 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power Systems + (Revision to Technical Specifications 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power Systems)
- CP-201900368, Revision to Technical Specifications 3.8.1, AC Sources - Operating + (Revision to Technical Specifications 3.8.1, AC Sources - Operating)
- EPID:L-2020-LLA-0059 + (Revision to Technical Specifications 3.8.1, AC Sources - Operating)
- ET 09-0016, Revision to Technical Specifications 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criterion + (Revision to Technical Specifications 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criterion)
- ML17164A177 + (Revision to Technical Specifications Bases Manual)
- ML14321A409 + (Revision to Technical Specifications Bases Manual)
- ML14063A429 + (Revision to Technical Specifications Bases Manual)
- ML14063A428 + (Revision to Technical Specifications Bases Manual)
- ML13157A248 + (Revision to Technical Specifications Bases Manual)
- ML18128A202 + (Revision to Technical Specifications Bases Manual)
- ML100250287 + (Revision to Technical Specifications Bases Manual)
- ML052450154 + (Revision to Technical Specifications Bases Manual)
- ML042590202 + (Revision to Technical Specifications Bases Unit 2 Manual)
- ML13072A619 + (Revision to Technical Specifications Bases, Manual)
- ML12101A101 + (Revision to Technical Specifications Bases, Manual)
- ML101130049 + (Revision to Technical Specifications Bases, Manual)
- RS-02-159, Revision to Technical Specifications Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training + (Revision to Technical Specifications Change Request - Clarification of Requirements for Licensed Operator Qualifications & Training)
- NL-09-1380, Revision to Technical Specifications LCO 3.1.2, Reactivity Anomalies + (Revision to Technical Specifications LCO 3.1.2, Reactivity Anomalies)
- NL-17-1026, Revision to Technical Specifications Pages for Limiting Condition for Operation 3.7.14 + (Revision to Technical Specifications Pages for Limiting Condition for Operation 3.7.14)
- WO 02-0004, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions + (Revision to Technical Specifications Re Suspension of Positive Reactivity Additions)
- WO 03-0057, Revision to Technical Specifications Regarding Extensions of AC Electrical Power Distribution Completion Time + (Revision to Technical Specifications Regarding Extensions of AC Electrical Power Distribution Completion Time)
- ET 16-0001, Revision to Technical Specifications and 10 CFR 50.12 Exemption Request to Allow Use of Optimized ZIRLO + (Revision to Technical Specifications and 10 CFR 50.12 Exemption Request to Allow Use of Optimized ZIRLO)
- DCL-17-076, Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01) + (Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01))
- ML19347C240 + (Revision to Tentative Schedule for ACRS Subcommittee 800616-17 Meeting in Sunol,Ca to Discuss Getr)
- ML21005A015 + (Revision to Terrapower, LLC - Quality Assurance Topical Report)
- ML083220131 + (Revision to Third Ten-Year Inservice Inspection (ISI) Interval Requests ISI-3-27 and ISI-3-28, Use of Structural Weld Overlay and Associated Alternative Repair Techniques)
- ML13191A177 + (Revision to Tornado Mitigation Strategy Regulatory Commitments 11T, 12T, 13T, and 16T)