ML19347C240
| ML19347C240 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos File:GEH Hitachi icon.png |
| Issue date: | 06/10/1980 |
| From: | Advisory Committee on Reactor Safeguards |
| To: | Advisory Committee on Reactor Safeguards |
| References | |
| ACRS-MS-0598, ACRS-MS-598, NUDOCS 8010170080 | |
| Download: ML19347C240 (2) | |
Text
REVISED 6/10/80 o ?
- CPS SUS'CTC ;[E MEETING ON THE GENERAL ELECTRIC TEST REACTOR (GETR)
JUNE 16 & 17, 1980 SUN 3L, CA l
(VLS-O YI$
PoE 2/'3/8 TENTATIVE SCHEDULE JUNE 16, 1980 APPROXIMATE TIME SPEAKER 8:30 a.m. - 8:45 a.m.
Chairman's Opening Statement Kerr 8:45 a.m. -
s:00 a.m.
Introductory Statement NRC Staff 9:00 a.m. - 9.15 a.m.
Introductory Statement GE 9:15 a.m. - 10:15 a.m.
GETR Facility and Modifications Description, Required Safety System GE 10:15 a.m. - 10:30 a.m.
- BREAK ************
10:30 a.m. - 11:30 a.m.
Seismic Analyses (Structures & Equipment)
GE Methodology 11:30 a.m. - 1:00 p.m.
Result of Seismic Analyses (Structures &
GE Equipment) 1:00 a.m. - 2:00 p.m.
- LUTCH ************
2:00 p.m. - 3:30 p.m.
Status of NRC Evaluation of Plant Structures NRC Staff 3:30 p.m. - 4:15 p.m.
Landslide Stability Program GE 4:15 p.m. - 4:30 p.m.
- BREAK ************
4:30 p.m. - 5:30 p.m.
Public Comments
- 5:30 p.m.
End of Busitess Day NOTES:
- 1.
Request for oral statements:
(10 mins) a.
Dee Price; SMUD Ratepayers Asso. (10 mins.)
( 5 mins) b.
Helen Hubbard; Citizens for Total Energy (15 mins.)
( 5 mins)
Diane Hughes
( 5 mins)
Sue Hughes
( 5 mins)
Kaye Huhlman c.
Allow 30 mins, for late requests H. Lee Halteman, Congressman Dellum's Office s'010170070 9
_r e
s
/
0%:qg
~; -
f/0ft 6kD ACRS SUCC0!!.t!TTEE MEETING ON THE l
GENERAL ELECTRIC TEST REACTOR (GETR) ;
I JUNE 16 & 17, 1980 SUNOL, CA JUNE 17, 1983 I
SPEAKER APPROXIMATE TIE Kerr l
Chairman's Opening Statement 8:30 a.m.
l l
NRC PRESENTATION
~
GSB/HGES i
8:45 a.m. - 9:30 a.m.
Staff Review of Site Geology USGS 9:30 a.m. - 10:30 a.m.
Geology
- BREAK ****'*****
10:30 a.m. - 10:45 a.m.
I Review of Probabilistic Analysis by LLL/ TERA j
10:45 a.m. - 11:45 a.m.
NRC Consultants I
NRC Staf f 11:45 a.m. - 12:15 p.m.
Review of Probabilistic Analysis
- LUNCH 12:15 p.m. - 1:15 p.m.
i Slemmons i
Proababilistic Analysis input Assumptions 1:15 p.m. - 1:45 p.m.
GSB 1:45 p.m. - 2:15 p.m.
Geology (Conclusions)
NRC Staff (Hall) 2:15 p.m. - 3:15 p.m.
Seismic Design Basis
\\
- BREAK 3:15 p.m. - 3:30 p.m.
GE PRESENTATION _
GE 3:30 p.m. - 5:30 p.m.
Geology soil age interpretation of excavation photographs etc.
GE 5:30 p.m. -- 6:00 p.m.
Probability Analysis l
6:00 p.m. - 6:30 p.m.
Caucus and Adjournment l