Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Revised Tech Spec 3/4 8-1 Re Electrical Power Sys". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20005F533  + (Revised Tech Spec 3/4 8-1 Re Electrical Power Sys)
  • ML19257A569  + (Revised Tech Spec 3/4.7.1 for RHR Svc Water Sys)
  • ML20085N032  + (Revised Tech Spec 3/4.7.13 Re Limiting Condition for Operation & Surveillance Requirements for Groundwater Level - Svc Water Reservoir)
  • ML19341C201  + (Revised Tech Spec 4.2.4 Re Pool Water Sys)
  • ML19325C851  + (Revised Tech Spec 6.0,Page 46 Re Administrative Organization for Operation)
  • ML20010B996  + (Revised Tech Spec 6.1.2 Re High Encl Pressure Scram Setpoints)
  • ML20069N233  + (Revised Tech Spec 6.2.3 Re Independent Safety Engineering Group Function,Composition,Responsibilities & Authority)
  • ML20050C799  + (Revised Tech Spec 6.8 Re Administrative Controls)
  • ML20010A223  + (Revised Tech Spec 6.9.2 Re Procedure for Reporting ROs to NRC)
  • ML20078D639  + (Revised Tech Spec Bases Pages B-2-5,B 2-6 & B 2-7,addressing Overtemperature delta-T,overpower delta-T & Steam Generator Water Level,Respectively)
  • ML20154L397  + (Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches)
  • ML20042F247  + (Revised Tech Spec Change 89-27 to Licenses DPR-77 & DPR-79, Making Nominal Setpoints & Allowable Value Consistent W/ Issued Setpoint Methodology)
  • ML20065A883  + (Revised Tech Spec Change Re Acoustic Emission Exam Methodology to Test Reactor Coolant Pump Flywheels)
  • ML19338C557  + (Revised Tech Spec Change Request 91 (Submitted 800807) Consisting of Proposed New Mgt Organization)
  • ML19338C558  + (Revised Tech Spec Change Request 91 (Submitted 800807) Consisting of Proposed New Mgt Organization)
  • ML20054H651  + (Revised Tech Spec Changes Resolving Reactor Protection Sys/ ESF Actuation Sys Channel Independence Issue & Permitting Greater Operational Flexibility)
  • ML20093M344  + (Revised Tech Spec Changes,Correcting Inadvertent Errors from 841002 Submittal)
  • ML20132F573  + (Revised Tech Spec Figure 3.2-2a,correcting Coordinate Used to Define Acceptable Region for Core Power Distribution from Erroneously Specified Coordinates)
  • ML20040C379  + (Revised Tech Spec Figures 5.2-1 & 6.2-1 Re Mgt Organization Charts)
  • ML17292A890  + (Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages)
  • ML20237H446  + (Revised Tech Spec Page 208,authorizing Plant Operation for Duration of Cycle 8 W/Msiv Closure Time of Greater than or Equal to 2 & Less than or Equal to 5 for One of Four Main Steam Lines)
  • ML20210R535  + (Revised Tech Spec Page 218,incorporating Amend 95 Changes & Correcting Typo.Tech Spec Page 218 Replaces Page 221)
  • ML20235S460  + (Revised Tech Spec Page 3-11,changing Gpm to Gallons & Page 3.31L,changing Table 3.2-1 to 3.17-1)
  • ML20235J528  + (Revised Tech Spec Page 3-21,adding Paragraph 3.3.5)
  • ML20009B183  + (Revised Tech Spec Page 3.1-16 to Amends 75 & 65 to Licenses DPR-21 & DPR-65,respectively)
  • ML20151U604  + (Revised Tech Spec Page 3.1-9,correcting Typo)