Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246H191 + (Revised Table of Contents to Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements)
- ML19296D087 + (Revised Tables 1 & 2 & Page 43B & D to Tech Specs Re LOCA Analysis)
- ML20091D578 + (Revised Tables 1A & 1B of Serr for Quarters 3 & 4 1990)
- ML20091D590 + (Revised Tables 1A & 1B of Serr for Quarters 3 & 4 1991)
- ML19347F412 + (Revised Tables 1A & 4 to, Radioactive Effluent Release Rept,Jul-Dec 1980)
- ML20148L266 + (Revised Tables 1C,2A & 2B of Semiannual Effluent Release Rept for Second Half 1987)
- ML20046C965 + (Revised Tables 3A & 3B of Ja FitzPatrick Nuclear Power Plant Effluent 7 Waste Disposal Semiannual Rept,Jan-June 1992)
- ML20046C967 + (Revised Tables 3A & 3B of Ja FitzPatrick Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1992)
- ML20091D586 + (Revised Tables 5,6 & 7 of Serr for 1990)
- ML20091D594 + (Revised Tables 5,6 & 7 of Serr for 1991)
- ML20072A549 + (Revised Tables RSD-E-03A & RSD-E-03D for 1982 Radiological Environ Monitoring Rept)
- ML20052C463 + (Revised Tables Re Util Plans for Compliance W/Reg Guide 1.97 Which Were Included in Response to Interrogatories on Shoreham Opponents Coalition Contention 3 & Suffolk County Contention 27)
- NL-11-059, Revised Tables from Entergy Letter NL-11-013 Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions + (Revised Tables from Entergy Letter NL-11-013 Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions)
- NL-11-013, Revised Tables from Responses to Requests for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions + (Revised Tables from Responses to Requests for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions)
- NL-11-0141, Revised Tables from Responses to Requests for Additional Information Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions + (Revised Tables from Responses to Requests for Additional Information Regarding Request for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions)
- ML20086T258 + (Revised Tables to Core Operating Limits Rept for Cycle 4 Operation, Consisting of Control Rod Bank Insertion Limits Vs Thermal Power four-loop Operation & three-loop Operation)
- ML20072B904 + (Revised Tables,Consisting of NPDES Data,Including Heavy Metal Analysis,Inadvertently Omitted from Annual Rept)
- ML20091D614 + (Revised Tabulation of Number of Station,Utility & Other Personnel Receiving Exposure Greater than 100 Mrem Per Yr 1989)
- ML20091D616 + (Revised Tabulation of Number of Station,Utility & Other Personnel Receiving Exposure Greater than 100 Mrem Per Yr 1990)
- ML19320D502 + (Revised Tech Spec 15.3.4 for Steam & Power Conversion Sys)
- ML20032E728 + (Revised Tech Spec 2.14 & Tables 2-1,2-3,2-5 & 3-2 Re ESF Sys Initiation Instrumentation Settings.List of Refs & Logic Diagrams Encl)
- ML20204A384 + (Revised Tech Spec 3.11.5,adding Five Manual Isolation Valves of post-accident Hydrogen Purge & Analysis Sys to List of Manual Containment Isolation Valves That May Be Repositioned W/O Implementing Compensatory Measures)
- ML19257C291 + (Revised Tech Spec 3.2 Re Main Steam Line Radiation Monitor)
- ML20030C874 + (Revised Tech Spec 3.6-1 Re Containment Sys)
- ML20077H072 + (Revised Tech Spec 3.8.15 Permitting Spent Fuel Cask to Be Handled by Auxiliary Bldg Crane for Period 911015 to 920131 for Shipment of Two Spent Fuel Rods Utilizing 17-ton Shipping Cask)
- ML20005F533 + (Revised Tech Spec 3/4 8-1 Re Electrical Power Sys)
- ML19257A569 + (Revised Tech Spec 3/4.7.1 for RHR Svc Water Sys)
- ML20085N032 + (Revised Tech Spec 3/4.7.13 Re Limiting Condition for Operation & Surveillance Requirements for Groundwater Level - Svc Water Reservoir)
- ML19341C201 + (Revised Tech Spec 4.2.4 Re Pool Water Sys)
- ML19325C851 + (Revised Tech Spec 6.0,Page 46 Re Administrative Organization for Operation)
- ML20010B996 + (Revised Tech Spec 6.1.2 Re High Encl Pressure Scram Setpoints)
- ML20069N233 + (Revised Tech Spec 6.2.3 Re Independent Safety Engineering Group Function,Composition,Responsibilities & Authority)
- ML20050C799 + (Revised Tech Spec 6.8 Re Administrative Controls)
- ML20010A223 + (Revised Tech Spec 6.9.2 Re Procedure for Reporting ROs to NRC)
- ML20078D639 + (Revised Tech Spec Bases Pages B-2-5,B 2-6 & B 2-7,addressing Overtemperature delta-T,overpower delta-T & Steam Generator Water Level,Respectively)
- ML20154L397 + (Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches)
- ML20042F247 + (Revised Tech Spec Change 89-27 to Licenses DPR-77 & DPR-79, Making Nominal Setpoints & Allowable Value Consistent W/ Issued Setpoint Methodology)
- ML20065A883 + (Revised Tech Spec Change Re Acoustic Emission Exam Methodology to Test Reactor Coolant Pump Flywheels)
- ML19338C557 + (Revised Tech Spec Change Request 91 (Submitted 800807) Consisting of Proposed New Mgt Organization)
- ML19338C558 + (Revised Tech Spec Change Request 91 (Submitted 800807) Consisting of Proposed New Mgt Organization)
- ML20054H651 + (Revised Tech Spec Changes Resolving Reactor Protection Sys/ ESF Actuation Sys Channel Independence Issue & Permitting Greater Operational Flexibility)
- ML20093M344 + (Revised Tech Spec Changes,Correcting Inadvertent Errors from 841002 Submittal)
- ML20132F573 + (Revised Tech Spec Figure 3.2-2a,correcting Coordinate Used to Define Acceptable Region for Core Power Distribution from Erroneously Specified Coordinates)
- ML20040C379 + (Revised Tech Spec Figures 5.2-1 & 6.2-1 Re Mgt Organization Charts)
- ML17292A890 + (Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages)
- ML20237H446 + (Revised Tech Spec Page 208,authorizing Plant Operation for Duration of Cycle 8 W/Msiv Closure Time of Greater than or Equal to 2 & Less than or Equal to 5 for One of Four Main Steam Lines)
- ML20210R535 + (Revised Tech Spec Page 218,incorporating Amend 95 Changes & Correcting Typo.Tech Spec Page 218 Replaces Page 221)
- ML20235S460 + (Revised Tech Spec Page 3-11,changing Gpm to Gallons & Page 3.31L,changing Table 3.2-1 to 3.17-1)
- ML20235J528 + (Revised Tech Spec Page 3-21,adding Paragraph 3.3.5)
- ML20009B183 + (Revised Tech Spec Page 3.1-16 to Amends 75 & 65 to Licenses DPR-21 & DPR-65,respectively)
- ML20151U604 + (Revised Tech Spec Page 3.1-9,correcting Typo)