LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS PAGE u
SECTION 3/4 7-34 TABLE 3.7-3 FIRE HOSE STATIONS....................................
3/4 7-36 3/4.7.11 FIRE BARRIER PENETRATIONS................................
3/4 7-38 3/4.7.12 GROUNDWATER LEVEL........................................
3/4 7-40 3/4.7.13 STANDBY SHUTDOWN SYSTEM..................................
3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES 3/4 8-1
[
0perating................................................
3/4 8-9 a
TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE........................
3/4 8-10 TABLE 4.8-2 LOAD SEQUENCING TIMES.................................
3/4 8-11 Shutdown................................................
3/4.8.2 D.C. SOURCES 3/4 8-12 Operating................,................................
TABLE 4.8-3 BATTERY SURVEILLANCE REQUIREMENTS.....................
3/4 8-15 3/4 8-16 Shutdown..................................................
3/4.8.3 ONSITE POWER DISTRIBUTION 3/4 8-17 0perating................................................
3/4 8-18 Shutdown.................................................
3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES Containment Penetration Conductor Overcurrent 3/4 8-19 Protective Devices.................................
0:VIC:'s.. 9.C } AY.ed.CT0" CV:P,C'Z":,'T TAI::":::T P :::T"ATIO : 00 ;0" TABLE 3.8-1 000:
3/4 8-21 PP,0T: TIV:
1 3/4.9 REFUELING OPERATIONS 3/4 9-1 3/4.9.1 BORON CONCENTRATION......................................
3/4 9-2 3/4.9.2 INSTRUMENTATION.........................................
3/4 9-3 3/4.9.3 DECAY TIME...
3/4 9-4 L
3/4.9.4 CONTAINMENT BUILDING PENETRATIONS........................
3/4 9-7 3/4.9.5 COMMUNICATIONS.......
3/4 9-8 3/4.9.6 MANIPULATOR CRANE......
3/4 9-9 3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE POOL BUILDING......