Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML053120390 + (Revised Station Blackout Evaluation)
- ML20024J362 + (Revised Status Rept Flow Technology)
- ML20151G351 + (Revised Std Operating Procedure SOP-600, Lab Rules)
- ML20149M032 + (Revised Std Plant Review Program Plan)
- ML18031A429 + (Revised Std Practice Instruction TI-88, Procedure for Estimation of Extent of Core Damage Under Accident Conditions)
- ML20212B279 + (Revised Std Radiological Monitoring Program,Lasalle County Station)
- ML20214C898 + (Revised Std Version of Intervenors 860801 Emergency Planning Contentions Re 860213 Exercise.Certificate of Svc Encl)
- ML20126A338 + (Revised Stds for Protection Against Radiation,10CFR19 & 20, Making Minor Corrective & Conforming Amends of NRC Revised Stds for Protection Against Radiation)
- ML19093A567 + (Revised Steam Generator Repair Program)
- NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant + (Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant)
- ML050690200 + (Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant)
- L-2005-234, Revised Steam Generator Tube Inservice Inspection, Special Report for Refueling Outage SL1-19 & RAI Response + (Revised Steam Generator Tube Inservice Inspection, Special Report for Refueling Outage SL1-19 & RAI Response)
- ML092020269 + (Revised Steam Generator Tube Inspection Report)
- L-2023-023, Revised Steam Generator Tube Inspection Report + (Revised Steam Generator Tube Inspection Report)
- ML24005A022 + (Revised Steam Generator Tube Inspection Reports)
- ML24005A021 + (Revised Steam Generator Tube Inspection Reports)
- L-2024-090, Revised Steam Generator Tube Inspection Reports + (Revised Steam Generator Tube Inspection Reports)
- L-2024-044, Revised Steam Generator Tube Inspection Reports + (Revised Steam Generator Tube Inspection Reports)
- L-2025-081, Revised Steam Generator Tube Inspection Reports + (Revised Steam Generator Tube Inspection Reports)
- ML24005A023 + (Revised Steam Generator Tube Inspection Reports, Refueling Outage 25 CC1R25)
- ML24005A024 + (Revised Steam Generator Tube Inspection Reports, Refueling Outage 23 CC2R23)
- DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage + (Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage)
- ML071780216 + (Revised Steam Generator Tube Integrity Assessment from the 2006 Refueling Outage)
- DCL-03-017, Revised Steam Generator Voltage-Based Repair Criteria Probability of Detection Method for Diablo Canyon Unit 2 Cycle 12 + (Revised Steam Generator Voltage-Based Repair Criteria Probability of Detection Method for Diablo Canyon Unit 2 Cycle 12)
- ML19257C039 + (Revised Steam Generator Water Hammer Technical Evaluation)
- SBK-L-18072, Revised Structures Monitoring Aging Management Program + (Revised Structures Monitoring Aging Management Program)
- ML20134G961 + (Revised Stuck Open Relief Valve Base Case)
- ML021280141 + (Revised Submission of NEDC-33046 Report Technical Justification to Support Risk-Informed Primary Containment Isolation Valve AOT Extensions for BWR Plants for NRC Staff Review)
- NLS2011057, Revised Submittal Date for 10 CFR 50.48(c) License Amendment Request and Request for Extension of Enforcement Discretion + (Revised Submittal Date for 10 CFR 50.48(c) License Amendment Request and Request for Extension of Enforcement Discretion)
- ML20205L547 + (Revised Submittal Date for Responses to NRCs Request for Additional Information (RAI) for HI-STAR 100MB Transport Package License Amendment Request 9378-1)
- JAFP-08-0128, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay + (Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay)
- ML083460337 + (Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay)
- ML11152A168 + (Revised Submittal Schedule and Scope for Licensing Amendment Steam Generator Replacement Project)
- ML11249A047 + (Revised Submittal Schedule for License Amendment Request, Supporting the Steam Generator Replacement Project)
- ML12017A186 + (Revised Submittal Schedule for License Amendment Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition)
- ML11186A865 + (Revised Submittal Schedule for License Amendment Requests Supporting Steam Generator Replacement Project)
- ML11216A231 + (Revised Submittal Schedule for License Amendment Requests Supporting the Steam Generator Replacement Project)
- ML11276A149 + (Revised Submittal Schedule for Supplemental Report for License Event Report 327/2011-003, Unit I Reactor Trip as a Result of Turbine Control Card Failure)
- 05000327/LER-2011-004, Revised Submittal Schedule for Supplemental Report for License Event Report 327/2011-004, Reactor Trip as a Result of a Loss of a Preferred Inverter + (Revised Submittal Schedule for Supplemental Report for License Event Report 327/2011-004, Reactor Trip as a Result of a Loss of a Preferred Inverter)
- ML11356A240 + (Revised Submittal Schedule for Supplemental Report for License Event Report 50-259/2011-008-01, High Vibrations on High Pressure Coolant Injection Booster Pump Thrust Bearings)
- ML11321A256 + (Revised Submittal Schedule for Supplemental Report for License Event Report 50-259/2011-003, Loss of Safety Function (SDC) Resulting from Emergency Diesel Generator Output Breaker Trip)
- L-2025-088, Revised Submittal of NRC Regulatory Issue Summary 2025-03, Preparation and Scheduling of Operator Licensing Examination + (Revised Submittal of NRC Regulatory Issue Summary 2025-03, Preparation and Scheduling of Operator Licensing Examination)
- ML030140420 + (Revised Submittal of Quality Assurance Program for Station Operation)
- ML021270332 + (Revised Submittal of Quality Assurance Program for Station Operation)
- ML20234F085 + (Revised Summary Evaluation of Reactor Pressure Vessel/ Neutron Shield Tank Seismic Response & Amplified Response Spectra Generation)
- ML18304A216 + (Revised Summary Report for 656th Full Committee Meeting - September 6-8, 2018)
- ML20138Q381 + (Revised Summary Status Rept of TVA Compliance to 10CFR50.49 - Environ Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants)
- ML20045E487 + (Revised Summary of 396th ACRS Meeting on 930415-17 Re Proposed Implementation Guidance for Maint Rule 10CFR50.65. Recommends That Staff Implementation Guidance for SBO 10CFR50.63 Be Revised to Deal W/Issue)
- ML20045E458 + (Revised Summary of 397th Meeting of ACRS on 930513-15 Re Draft Commission Paper Concerning Staff Proposed Approach for Assessing Consistency of Present Regulations W/Respect to Commission Safety Goals)
- ML19211C860 + (Revised Summary of 791010 Open Discussion in Washington,Dc Re Petitions to Intervene in Hearing on Philippine Applications.Commission Denied Request for Oral Argument)
- ML19305B349 + (Revised Summary of 800208 Meeting W/Util in Bethesda,Md Re Changes in Position of Util Mgt Personnel & Summary of Plant Status.Planned Fuel Load for Unit 1 Is Oct 1983,w/commercial Operation in Spring 1984)