Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Revise the Frequency of SR 3. 7.5.5, Afw/Efw Flow Path Verification". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • TSTF-268  + (Revise the Frequency of SR 3. 7.5.5, Afw/Efw Flow Path Verification)
  • TSTF-565  + (Revise the LCO 3.0.2 and LCO 3.0.3 Bases)
  • TSTF-165  + (Revise the LCO 3.0.5 Bases to Refer to Testing and Not SRS)
  • ML18023A691  + (Revise the Pilgrim Emergency Plan to Address the Permanently Defueled Condition)
  • TSTF-600  + (Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
  • ML13240A320  + (Revise the Reactor Pressure Vessel Material Surveillance Capsule Withdrawal Schedule Due to License Renewal Amendment)
  • ML17317A608  + (Revise the Reactor Pressure Vessel Material Surveillance Capsule Withdrawal Sechedule (CAC No. MF9075; EPID L-2016-LLL-0001))
  • TSTF-008  + (Revise the SR 3.0.1 Bases to Allow Credit for Unplanned Events to Meet Any Surveillance)
  • ML17137A159  + (Revise the Technical Specifications (Tss), Appendix a)
  • ML19099A367  + (Revise the Technical Specifications for Permanent Extension of Types a and C Leak Rate Test Frequencies and Permanently Extend the Drywell Bypass Leakage Test Frequency)
  • TSTF-042  + (Revise the Wording of SR 3.0.2 to Be Consistent with the Other Nuregs)
  • ML19290C369  + (Revised & Augmented List of Earthquake Intensities for Ks, 1867-1977)
  • ML041180500  + (Revised (Revision 5) Davis-Besse IMC 0350 Oversight Panel Charter)
  • ML050600423  + (Revised - 03/03/05 Notice of Meeting with Constellation Generation Group to Discuss NRCs Team Inspection Covering the Scoping and Aging Management Portions of Nine Mile Point Nuclear Stations Application for a Renewed License)
  • IR 05000313/2023003  + (Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001)
  • ML19182A188  + (Revised - Agenda 665th ACRS Full Committee Meeting, July 10-12, 2019)
  • ML023310334  + (Revised - Braidwood Meeting Notice Letter to Licensee. Meeting to Start at 10:30 A.M. at Fossil Ridge Public Library)
  • ML110480888  + (Revised - Browns Ferry Nuclear Power Plant - Operator Licensing Written Examination Approval 05000259/2011301, 05000260/2011301 and 05000296/2011301)
  • ML063330486  + (Revised - Final Environmental Impact Statement Related to Construction of Shearon Harris Nuclear Power Plant Units 1, 2, 3, and 4 - March 1974)
  • ML19218A073  + (Revised - NEIs Proposed Guidance for Section 1.8 of BTP 7-19)
  • ML12073A162  + (Revised - Palisades Meeting Notice for End-of-Cycle Meeting)
  • ML050750003  + (Revised - Pilgrim Annual Assessment Meeting Notice W/Nrc Slides)
  • ML092720143  + (Revised - Political Activities)
  • Information Notice 1997-41, Revised - Potentially Undersized Emergency Diesel Generator (EDG) Oil Coolers  + (Revised - Potentially Undersized Emergency Diesel Generator (EDG) Oil Coolers)
  • ML030640770  + (Revised 03/18/2003 Notice of Meeting with Entergy Nuclear Generation Company Re NRCs Annual Assessment of the Safety Performance at the Vermont Yankee Station)
  • ML20199L143  + (Revised 1-OM-Index, Unit 1 Operations Dept OM Index)