Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128E077 + (Review of Seabrook PRA, Monthly Mgt Ltr 2 for June 1984)
- ML20211C641 + (Review of Seabrook PRA, Monthly Mgt Ltr 3 for Jul 1984)
- ML20211C792 + (Review of Seabrook PRA, Monthly Mgt Ltr 4 for Aug 1984)
- ML20209D479 + (Review of Seabrook PRA, Monthly Mgt Ltr 5 for Sept 1984)
- ML20211C904 + (Review of Seabrook PRA, Monthly Mgt Ltr 6 for Oct 1984)
- ML20211D068 + (Review of Seabrook PRA, Monthly Mgt Ltr 7 for Nov 1984)
- ML20211D092 + (Review of Seabrook PRA, Monthly Mgt Ltr 8 for Dec 1984)
- ML20211D129 + (Review of Seabrook PRA, Monthly Mgt Ltr 9 for Jan 1985)
- ML20140E047 + (Review of Seabrook Station Probabilistic Safety Assessment: Containment Failure Modes & Radiological Source Terms)
- ML20080M435 + (Review of Seabrook Units 1 and 2 Auxiliary Feedwater System Reliability Analysis)
- ML060930085 + (Review of Security Plan Changes)
- ML17054C831 + (Review of Security Plan, Revision 8)
- ML19321A044 + (Review of Seismic Adequacy of Piping & Equipment,Getr)
- ML20133M737 + (Review of Seismic Analysis & Design for Maine Yankee Power Station)
- ML20081E977 + (Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept)
- ML20151L707 + (Review of Seismic Analysis of Hatch Units 1 & 2: In-Structure Response Spectra)
- ML19331B205 + (Review of Seismic Design Criteria)
- ML20133M162 + (Review of Seismic Design Criteria for Beaver Valley Power Station)
- ML19329C467 + (Review of Seismic Design Criteria for Davis-Besse)
- ML19338C023 + (Review of Seismic Design Criteria for Facility)
- ML19309H505 + (Review of Seismic Design Criteria for Site, Prepared for GE)
- ML20212L979 + (Review of Seismic Evaluation for Postulated 7.5M Hosgri Earthquake,Units 1 & 2,Diablo Canyon Site)
- ML20234E565 + (Review of Seismic Factors Pertaining to Bodega Bay Atomic Power Unit 1 Based Upon Listed Info from Preliminary Hazard Summary Rept by Pg&E. W/Addendum)
- ML19292B771 + (Review of Seismic Hazard & Fragility in Limerick Generating Station Severe Accident Risk Assessment)
- ML13308A811 + (Review of Seismic Re-evaluation of Reactor Bldg & Balance of Plant Structures of San Onofre Nuclear Generating Station,Unit 1)
- ML20199K546 + (Review of Selected Areas of Yankee Rowe Probabilistic Safety Study)
- ML20024B553 + (Review of Sequence of Events Leading to Incident at TMI-2 on 790328)
- ML20127B641 + (Review of Sequences Following Release of Excessive Water in Elevation 8 of Reactor Bldg in Shoreham Nuclear Power Station, Ltr Rept)
- ML082800319 + (Review of Sequoyah Nuclear Plant, Unit 1, Steam Generator Tube Inspection Reports for the Fall 2007 (UC15) Outage)
- ML080810232 + (Review of Sequoyah Nuclear Plant, Units 1 and 2 - Technical Specifications Change 07-03 Revision of Channel Functional Test Surveillance Frequency for Reactor Trip System Turbine Trip)
- ML20147D520 + (Review of Severe Weather Meteorology at Gen Elec Co Vallecitos,Ca. Provides Calculations & Info for Determining Characteristics of design-basis Storm)
- ML19312D387 + (Review of Severe Weather Meteorology at Bmi)
- ML19322E564 + (Review of Severe Weather Meteorology at Bmi,Columbus,Oh)
- ML17031A439 + (Review of Shine SGI Protection Program Procedures (E-mail))
- ML20065T942 + (Review of Shoreham Water Level Measurement Sys)
- ML071070368 + (Review of Site Specific Decommissioning Cost Estimates)
- ML20236U132 + (Review of Smud Emergency Operating Procedures)
- ML20009D749 + (Review of Soil-Structure Interaction & Seismic Analysis of Category I Structures,South Tx Project Units 1 & 2)
- ML20009D908 + (Review of Soil-Structure Interaction & Seismic Analysis of Category I Structures,South Tx Project)
- ML20149A652 + (Review of Solid Radwaste Practices in Light Water Cooled Nuclear Reactor Power Plants, Revision 1 of ORNL-4924)
- 05000324/LER-1982-094-03, Review of Source Range Monitor Sys Channel Functional Test PT-01.2.1 Revealed That Weekly Surveillance During Fuel Handling Did Not Reflect Mode 5 Testing Frequency.Caused by Oversight + (Review of Source Range Monitor Sys Channel Functional Test PT-01.2.1 Revealed That Weekly Surveillance During Fuel Handling Did Not Reflect Mode 5 Testing Frequency.Caused by Oversight)
- ML20214R379 + (Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept)
- ML20095K456 + (Review of Southeastern Ma Health Study)
- ML19122A199 + (Review of Spent Fuel Management Plan)
- ML12262A245 + (Review of Spent Fuel Management Program and the Preliminary Decommissioning Cost)
- ML041900348 + (Review of Spring 2002 Cycle 11, Refueling Outage Steam Generator Inspection Reports)
- ML080990790 + (Review of Spring 2007 Steam Generator Tube Inservice Inspection Reports)
- ML091180132 + (Review of Spring 2008 Steam Generator Tube Inservice Inspection)
- ML092240032 + (Review of Spring 2008 Steam Generator Tube Inservice Inspection Report)
- ML101050241 + (Review of Spring 2009 Steam Generator Tube Inservice Inspection Report)
- ML111050499 + (Review of Spring 2010 Steam Generator Tube Inservice Inspection Report)