Letter Sequence Approval |
---|
TAC:MD1171, (Approved, Closed) TAC:MD1172, (Approved, Closed) TAC:MD1173, (Approved, Closed) TAC:MD1174, (Approved, Closed) TAC:MD1175, (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 2024-09-09
[Table view] |
Text
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION April 19, 2006 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE UNITS 1 AND 2, TURKEY POINT UNITS 3 AND 4, AND SEABROOK STATION, UNIT NO. 1 - REVIEW OF SECURITY PLAN CHANGES (TAC NOS. MD1171, MD1172, MD1173, MD1174 AND MD1175)
Dear Mr. Stall:
This refers to your submittal dated June 30, 2005, in which you submitted an update to the security plans (physical security, training and qualification, and safeguards contingency plans) for St. Lucie Units No. 1 and 2, Turkey Point Units No. 3 and 4, and Seabrook Station Unit No. 1. We have reviewed your changes and find them acceptable in meeting the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(p). Enclosed is the Safeguards Evaluation.
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter without the enclosure will be available electronically for public inspection in the Nuclear Regulatory Commissions (NRCs) Public Document Room or from the publicly-accessible NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The enclosure to this letter is designated exempt from public disclosure under 10 CFR 2.390(d)(1).
The Enclosure to this letter contains Security-Related Information.
Upon separation from the Enclosure, this letter is decontrolled.
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION J. A. Stall If you have any questions regarding this matter, please contact me at (301) 415-2481.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335, 50-389, 50-250, 50-251 and 50-443
Enclosures:
Safeguards Evaluation of 10 CFR 50.54(p)
Changes to Security Plans cc w/o encl: See next page cc w/encl: Glenn Dentel, Seabrook SRI Ray Lorson, NRC Region I Thierry Ross, St. Lucie SRI Scott Stewart, Turkey Point SRI Brian Bonser, NRC Region II OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION J. A. Stall If you have any questions regarding this matter, please contact me at (301) 415-2481.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335, 50-389, 50-250, 50-251 and 50-443
Enclosures:
Safeguards Evaluation of 10 CFR 50.54(p)
Changes to Security Plans cc w/o encl: See next page cc w/encl: Glenn Dentel, Seabrook SRI Ray Lorson, NRC Region I Thierry Ross, St. Lucie SRI Scott Stewart, Turkey Point SRI Brian Bonser, NRC Region II DISTRIBUTION DRoberts RidsRgn1MailCenter RidsRgn2MailCenter PLee(NSIR)
PUBLIC RidsNrrPMGMiller KGrimes (NSIR) SMorris (NSIR)
LPL1-2 R/F RidsNrrLACRaynor Accession Number: ML060930085 OFFICE LPL1-2/PM NSIR/RSS NSIR/RSS LPL1-2/LA NSIR/RSS/BC LPL1-2/BC NAME GEMiller PLee KGrimes CRaynor SMorris DRoberts DATE 4/18/06 4/19/06 12/15/2005 4/17/06 4/19/06 4/19/06 Official Record Copy OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION
Florida Power and Light Company St. Lucie Plant, Unit Nos. 1 and 2 Turkey Point Plant, Unit Nos. 3 and 4 Seabrook Station, Unit No. 1 cc:
Mr. Michael Kiley, Station Director Douglas Anderson, County Administrator Seabrook Station St. Lucie County FPL Energy Seabrook, LLC 2300 Virginia Avenue P.O. Box 300 Ft. Pierce, Florida 34982 Seabrook, NH 03874 Mr. Christopher Costanzo James M. Peschel Acting Plant General Manager Regulatory Programs Manager St. Lucie Nuclear Plant Seabrook Station 6351 South Ocean Drive FPL Energy Seabrook, LLC Jensen Beach, Florida 34957 PO Box 300 Seabrook, NH 03874 Walter Parker, Licensing Manager Turkey Point Nuclear Plant Senior Resident Inspector 9760 SW. 344th Street St. Lucie Plant Florida City, FL 33035 U.S. Nuclear Regulatory Commission P.O. Box 6090 Mr. William A. Passetti, Chief Jensen Beach, Florida 34957 Department of Health Bureau of Radiation Control Craig Fugate, Director 2020 Capital Circle, SE, Bin # C21 Division of Emergency Preparedness Tallahassee, Florida 32399-1741 Department of Community Affairs 2740 Centerview Drive Mr. G. L. Johnston, Acting Vice President Tallahassee, Florida 32399-2100 St. Lucie Nuclear Plant 6351 South Ocean Drive M. S. Ross, Managing Attorney Jensen Beach, Florida 34957 Florida Power & Light Company P.O. Box 14000 Attorney General Juno Beach, FL 33408-0420 Department of Legal Affairs The Capitol Marjan Mashhadi, Senior Attorney Tallahassee, Florida 32304 Florida Power & Light Company 801 Pennsylvania Avenue, NW, # 220 Senior Resident Inspector Washington, DC 20004 Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission Terry O. Jones, Site Vice President 9762 SW. 344th Street Turkey Point Nuclear Plant Florida City, Florida 33035 Florida Power and Light Company 9760 SW. 344th Street Michael O. Pearce Florida City, FL 33035 Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035
County Manager Regional Administrator, Region I Miami-Dade County U.S. Nuclear Regulatory Commission 111 Northwest 1 Street, 29th Floor 475 Allendale Road Miami, Florida 33128 King of Prussia, PA 19406 Mr. Terry L. Patterson Office of the Attorney General Licensing Manager One Ashburton Place, 20th Floor St. Lucie Nuclear Plant Boston, MA 02108 6351 South Ocean Drive Jensen Beach, Florida 34957 Board of Selectmen Town of Amesbury Mark Warner, Vice President Town Hall Nuclear Operations Support Amesbury, MA 01913 Florida Power and Light Company P.O. Box 14000 Ms. Deborah Bell Juno Beach, FL 33408-0420 Federal Emergency Management Agency Region I Mr. Rajiv S. Kundalkar J. W. McCormack P.O. &
Vice President - Nuclear Engineering Courthouse Building, Room 401 Florida Power & Light Company Boston, MA 02109 P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Tom Crimmins Polestar Applied Technology Mr. J. Kammel One First Street, Suite 4 Radiological Emergency Los Altos, CA 94019 Planning Administrator Department of Public Safety Mr. Stephen McGrail, Director 6000 Southeast Tower Drive ATTN: James Muckerheide Stuart, Florida 34997 Massachusetts Emergency Management Agency Mr. Peter Brann 400 Worcester Road Assistant Attorney General Framingham, MA 01702-5399 State House, Station #6 Augusta, ME 04333 Philip T. McLaughlin, Attorney General Steven M. Houran, Deputy Attorney Gene St. Pierre, Site Vice President General Seabrook Station 33 Capitol Street FPL Energy Seabrook, LLC Concord, NH 03301 P.O. Box 300 Seabrook, NH 03874 Mr. Bruce Cheney, Director New Hampshire Office of Emergency Resident Inspector Management U.S. Nuclear Regulatory Commission State Office Park South Seabrook Nuclear Power Station 107 Pleasant Street P.O. Box 1149 Concord, NH 03301 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823