Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127C310 + (Rev 4 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
- ML20127C366 + (Rev 4 to Const Work Procedure W-WP-8, Handling, Installation & Field Repair of Waterstops)
- ML20126H826 + (Rev 4 to Containment Air Control Envelope)
- ML20080A921 + (Rev 4 to Control Rod Sequence Package)
- ML17335A407 + (Rev 4 to Cook Nuclear Plant Restart Plan)
- ML17325B443 + (Rev 4 to Cook Nuclear Plant Restart Plan. with)
- ML20116G691 + (Rev 4 to Core Operating Limits Rept)
- ML20116C020 + (Rev 4 to Core Operating Limits Rept for Limerick Generating Station,Unit2,Cycle 2)
- ML20091H046 + (Rev 4 to Core Operating Limits Rept,Consisting of Revised Section 2.1 Re Moderator Temp Coefficient)
- ML20140E788 + (Rev 4 to Corporate Operations Manual Part IV - Functional Manuals,Section I,Nuclear QA Manual)
- ML18054B060 + (Rev 4 to Cpco Full Core Pidal Sys Software Description)
- ML20045B471 + (Rev 4 to Criticality Safety Engineering Rept)
- ML20137X719 + (Rev 4 to Cycle 5 Colr)
- ML20101A440 + (Rev 4 to Cycle 8 Core Operating Limits Rept)
- ML20141G883 + (Rev 4 to D.2 Scheduling,Conducting & Reporting Onsite Reviews of Agreement State Regulatory Programs)
- ML17332A945 + (Rev 4 to DC Cook Nuclear Plant Unit 1,Cycle 15,COLR)
- ML17333A439 + (Rev 4 to DC Cook Nuclear Plant Unit 2 Cycle 11 Colr)
- ML20148H943 + (Rev 4 to DOE/AL/62350-129, Completion Rept for Umtra Project Vitro Processing Site,Salt Lake City,Ut)
- ML20096C167 + (Rev 4 to Decommissioning Fire Protection Plan)
- ML20151A427 + (Rev 4 to Dept QA Procedure E&C 24-10-16, Development, Review,Approval & Release of SCE Design Change Package (DCP) & Assembly W/Proposed Facility Changes (Pfc) San Onofre...1, 2 & 3. Proposed Change Notice 1 Encl)
- ML20151A661 + (Rev 4 to Dept QA Procedure E&C 40-9-21, Nuclear Safety Group Review,Evaluation & Audit Responsibilities for San Onofre Nuclear Generating Station. Proposed Change Notices 1 & 2 Encl)
- ML20236P033 + (Rev 4 to Design Adequacy Procedure DAP-10, Development & Use of DAP Procedures & Discipline Instructions)
- ML20215J830 + (Rev 4 to Design Adequacy Procedure DAP-2, Documentation & Tracking of Issues & Discrepancies)
- ML20215J818 + (Rev 4 to Design Adequacy Procedure DAP-4, Preparation of Checklists)
- ML20150E377 + (Rev 4 to Design Baseline & Verification Program)
- ML20044C619 + (Rev 4 to Design Guide DG-II.20, Civil/Structural Operability Reviews)
- ML20153C723 + (Rev 4 to Design,Verification & Validation Plan for South Texas Project Qualified Display Processing Sys)
- ML16341D837 + (Rev 4 to Diablo Canyon Unit 1 Inservice Insp & Testing Program Plan)
- ML20203N176 + (Rev 4 to Div Sys Description for Auxiliary Bldg Emergency Liquid Cleanup Sys (Epicor II))
- ML20137B572 + (Rev 4 to Div Sys Description for Submerged Demineralizer Sys)
- ML20126D477 + (Rev 4 to Document W3-5, Insp)
- ML17250B101 + (Rev 4 to E-2, Faulted Steam Generator Isolation)
- ML17250B105 + (Rev 4 to ECA-0.1, Loss of All AC Power Recovery W/O SI Required)
- ML20236T917 + (Rev 4 to EMIP-105, Personnel Protection Alarm Response)
- ML17262A889 + (Rev 4 to EOP ES-0.2, Natural Circulation Cooldown)
- ML17263A618 + (Rev 4 to EOP FR-S.2, Response to Loss of Core Shutdown)
- ML20199E402 + (Rev 4 to EOP-02, Vital Sys Status Verification)
- ML20199E426 + (Rev 4 to EOP-04, Inadequate Heat Transfer)
- ML20249C153 + (Rev 4 to EOP-14, Emergency Operating Procedure Enclosures)
- ML20136H345 + (Rev 4 to ERC/CP-001, Mgt Program Plan for Qa/Qc Review Team)
- ML17250B120 + (Rev 4 to ES-3.2, Post-SGTR Cooldown Using Blowdown)
- ML17250B121 + (Rev 4 to ES-3.3, Post-SGTR Cooldown Using Steam Dump)
- ML20237E977 + (Rev 4 to EWI-09.04.01, Inservice Testing Program)
- ML20234D056 + (Rev 4 to Effects of High Enercy Piping Sys Breaks Outside Reactor Bldg)
- ML20212H570 + (Rev 4 to Effluent & Waste Disposal Semiannual Rept,Gaseous Effluents-Summation of All Releases,Jul-Dec 1986)
- ML20150B427 + (Rev 4 to Effluent & Waste Disposal Semiannual Rept Jul-Dec 1987)
- ML20212A477 + (Rev 4 to Element Final Rept C011306-SQN, Testing of Anchors)
- ML20209E150 + (Rev 4 to Element Rept, Engineering Document Quality)
- ML20245C333 + (Rev 4 to Emergency Operating Procedure 1POP05-EO-ES02, Natural Circulation Cooldown)
- ML20245C639 + (Rev 4 to Emergency Operating Procedure 1POP05-EO-FRH1, Response to Loss of Secondary Heat Sink)
- ML20245C194 + (Rev 4 to Emergency Operating Procedure 1POP05-EO-EC33, SGTR W/O Pressurizer Pressure Control)