ML20101A440

From kanterella
Jump to navigation Jump to search
Rev 4 to Cycle 8 Core Operating Limits Rept
ML20101A440
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/16/1992
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20101A438 List:
References
NUDOCS 9204220151
Download: ML20101A440 (3)


Text

-

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 CYCLE 8 CORE OPERATING LIMITS REPORT REVISION 4 l

L l

l 9204220151 920416 DR ADOCK 0500 2

. ~. -

L.

CORE OPERATING LIMITS REPORT REVISION HISTORY Rev. 0 (5/21/90):

Original issue.

Est. I 16/6/90):

Editorial changes.

Rev. '2 (Jjtll3/91):

Tilt limits. at reduced powe.~.

- Rev.-3 f2/14/92):-

Mcderator temperature coefficient at E00.

Rgy.~4 i4/1/92):

APSR withdrawal - at 512 f.FPD, L

1 l

m L

e d

l

. ~,

.:4 i

Page 11'of 21

-c Crystal River 3, Cycle 8 AXIAL POWER SHAPING R0D INSERTION LIMITS Up to 512 EFPD,-the APSR's may be positioned as necesst.ry.

The APSR's shall be completely. withdrawn (100%) by 535 EfPD.

Between 512 and 535 EfPD, the APSR's raay be' withdt aw::.

Ilowever, once withdrawn during this period, tha APSR's shall not be ~ reinserted.

4 J

5 i

lhese limita are referred to by 1echnical Specification-3.1.3.9 m

-4 1

- Rev. 4-4

_m, i a w

s,-

, - - - - +-

r e

er v

--w-=