ML20101A440
| ML20101A440 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/16/1992 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20101A438 | List: |
| References | |
| NUDOCS 9204220151 | |
| Download: ML20101A440 (3) | |
Text
-
FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 CYCLE 8 CORE OPERATING LIMITS REPORT REVISION 4 l
L l
l 9204220151 920416 DR ADOCK 0500 2
. ~. -
L.
CORE OPERATING LIMITS REPORT REVISION HISTORY Rev. 0 (5/21/90):
Original issue.
Est. I 16/6/90):
Editorial changes.
Rev. '2 (Jjtll3/91):
Tilt limits. at reduced powe.~.
- Rev.-3 f2/14/92):-
Mcderator temperature coefficient at E00.
Rgy.~4 i4/1/92):
APSR withdrawal - at 512 f.FPD, L
1 l
m L
e d
l
. ~,
.:4 i
Page 11'of 21
-c Crystal River 3, Cycle 8 AXIAL POWER SHAPING R0D INSERTION LIMITS Up to 512 EFPD,-the APSR's may be positioned as necesst.ry.
The APSR's shall be completely. withdrawn (100%) by 535 EfPD.
Between 512 and 535 EfPD, the APSR's raay be' withdt aw::.
Ilowever, once withdrawn during this period, tha APSR's shall not be ~ reinserted.
4 J
5 i
lhese limita are referred to by 1echnical Specification-3.1.3.9 m
-4 1
- Rev. 4-4
_m, i a w
s,-
, - - - - +-
r e
er v
--w-=