Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148N988 + (Rev 2 to PI-MP3-01, Independent Corrective Action Verification Program Communications Protocol)
- ML20141E472 + (Rev 2 to PI-MP3-02, Review of Sys Design for Compliance W/Design & Licensing Basis)
- ML20210U374 + (Rev 2 to PI-MP3-03, Review of Plant Mods Prepared After Receipt of Operating License for Technical Adequacy & for Configuration Control)
- ML20141E487 + (Rev 2 to PI-MP3-04, Programmatic Reviews)
- ML20210U392 + (Rev 2 to PI-MP3-06, Project Instruction PI-MP3-06)
- ML20203F675 + (Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems)
- ML20210U403 + (Rev 2 to PI-MP3-09, Preparation & Approval of Checklists)
- ML20141E492 + (Rev 2 to PI-MP3-11, Discrepancy Rept Submittal & Closure)
- ML20151X872 + (Rev 2 to PM-1010, RHR Pump Npsh)
- ML20151X881 + (Rev 2 to PM-1011, Core Spray Pump Npsh)
- ML17164A589 + (Rev 2 to PP&L SSES Odcm)
- ML20199L011 + (Rev 2 to PP-04, Regulatory Review Procedure)
- ML20105A900 + (Rev 2 to PRA North Anna Power Station Svc Water Preservation Project,Part One, Final Rept)
- ML13329A721 + (Rev 2 to PRA-1-91-016, Probabilistic Risk Assessment Evaluation of Proposed CCW Heat Exchanger Allowed Outage Time)
- ML20141D282 + (Rev 2 to PRA96NQA-01093-S3, MP3 Maint Performance Criteria)
- ML20238A181 + (Rev 2 to PRCP-A, Process Control Program for Dewatering Wet Radioactive Solid Waste)
- ML20112A664 + (Rev 2 to PSAR Chapter 17, Qa)
- ML17229B084 + (Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines)
- ML20217B628 + (Rev 2 to PSR-15, Vitrification Facility Non-Radiological Sys Monitoring Requirements. W/Index)
- ML20138D698 + (Rev 2 to PSR-17, Min Staffing Levels for Safe Facility Operation)
- ML17313A670 + (Rev 2 to PVNGS Unit 2 Colr)
- ML17312B600 + (Rev 2 to PVNGS Unit 2 Cycle 7 Colr)
- ML13310B081 + (Rev 2 to PWR Safety & Relief Valve Test Program,Porv Block Valve Adequacy Rept for Southern California Edison,San Onofre Unit 1)
- ML18065A538 + (Rev 2 to Palisades Plant Colr)
- ML20138K590 + (Rev 2 to Pc 23,Part 5, Charging Pump Preventative Maint)
- ML20056G009 + (Rev 2 to Pcp)
- ML20235Z180 + (Rev 2 to Pennsylvania Power & Light Co Approach to Risk Mgt & Risk Assessment)
- ML20056D601 + (Rev 2 to Performance Test Procedure 2-PT-24.6.4, SWS Hydraulic Performance Test for Bsep,Unit 2)
- ML20045D379 + (Rev 2 to Performance Testing Procedure PT-340, Acceptance Criteria)
- ML20215D892 + (Rev 2 to Performance of Preweld Insps)
- ML20138D183 + (Rev 2 to Perry Operations Manual,Inservice Exam Program)
- ML20094A592 + (Rev 2 to Pilgrim Nuclear Power Station Reactor Pressure Vessel Pressure Temp Limits)
- ML20095F969 + (Rev 2 to Pipe Rupture Analysis Criteria Outside Reactor Bldg,Crystal River Unit 3)
- ML20210F871 + (Rev 2 to Pipe Stress Calculations:Acceptance Criteria for Overlap Areas of Calculations)
- ML20212H051 + (Rev 2 to Pipe Stress Calculations:Widespread Deficiencies within Pipe Stress Calculations)
- ML20207S470 + (Rev 2 to Pipe/Fittings Re Const)
- ML20072A803 + (Rev 2 to Plan for Partial Release of Stop Work Action 10 Refueling Bellows Nde)
- ML20083A861 + (Rev 2 to Plant Administrative Procedure PAP-0806, Oil/ Chemical Release Contingency Plan)
- PM-92-108, Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements + (Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements)
- ML20034H344 + (Rev 2 to Plant Notice Procedure PN-30, Integrated Recovery Methodology)
- ML20042F051 + (Rev 2 to Plant Nuclear Div Improvement Plan)
- ML20096D472 + (Rev 2 to Plant Recovery Core Damage Assessment Methodology)
- ML19332D202 + (Rev 2 to Plant Unique Analysis Rept for Ei Hatch Nuclear Plant Unit 2,Mark I Containment Long-Term Program)
- ML20151D562 + (Rev 2 to Plant-Specific Technical Guideline 7, Emergency Depressurization)
- ML20151D593 + (Rev 2 to Plant-Specific Technical Guideline 10, Level/ Power Control)
- ML20082N549 + (Rev 2 to Plant-Unique Analysis Rept for Ei Hatch Nuclear Plant Unit 1,Mark 1 Containment Long-Term Program)
- ML20135F291 + (Rev 2 to Pnwl,Commercial LWR Tritium Target Qualification Project QA Plan)
- ML20085A987 + (Rev 2 to Policies & Procedures NPG-0504-13, Preparation of Site Support Documents)
- ML20199E586 + (Rev 2 to Population Description, Field Fabricated Tanks)
- ML20084K742 + (Rev 2 to Position Paper on Reg Guide 1.97)
- ML20217H464 + (Rev 2 to Post Shutdown Decommissioning Activities Rept (Psdar))