PLAN FOR PARTIAL RELEASE OF SWA 10 REFUELING BELLOWS NON-DESTRUCTIVE EXAMINATION REVISION 1, OCTOBER 7, 1982 REVISION 2, JANUARY 10, 1983
]83 I
RECOMMENDED BY 554 mum 1
IP MECH. RECOVERY PLAN COORDINATOR
&fA7tGC W
/ /// D IP RKOV RY PLAN DIRECTOR / _
L
[/
n ()/)
APPROVED BY
~PpJECTMANfGER
[
I B
\\
ly (fil b3 IP' PROJECT MANAGER VeM h&T3 M A 'ANAGER Q&TP M
,b{ffy'j k i#
H/43 I
G5R QA ff 0 IP VICE PRESIDENT 8301240134 830114
~
PDR ADOCK 05000461 A
t,".
September 24, 1982 Rev. 1, October 7, 1982 Rev. 2, January 10, 1983 PLAN FOR PARTIAL LIFT SWA 10 FOR REFUELING BELLOWS In response to S&L's request per their letter SLS-I-3599 Attach-ment 1, dated August 26, 1982, we propose the following plan be implemented.
1.
To allow S&L to further technically evaluate the weld defects in the top & bottom horizontal flange plates and the bottom vertical skirt perform an ultrasonic inspection to determine location and size of defects.
See sketch Attachment 2.
2.
The ultrasonic testing will be performed by Southwest Research Institute under their existing QA program using their approved procedures which were used for IPC's pre-service inspection.
These procedures meet the specifications provided in S&L's letter.
(ASME Section XI and Section V).
3.
SWRI will prepare and submit to IPC and S&L a report which will provide the examination results plotted in the form of a weld map showing X,Y, and Z dimensions (size) of the indications and the X,Y &Z coordinates to the center (location) of the indications.
4.
To allow SWRI to properly perform the Ultrasonic examination, some welds will require minor grinding to achieve acceptable contours.
B.A. will be directed to do this work using appropriate Q/TS surveillance and paperwork.
IPQA will also perform random surveillance of the grinding & UT examination.
5.
Stop Work 10 will be amended to allow necessary work to perform UT examination.
6.
The plan for S&L and IPC evaluation and disposition of the results determined by the above non-destructive examination is found in Attachment 3.
This " flow chart" characterizes what step by step action will be followed after completion of the NDE.
l
~
y- %.
SARGENT & LUNDY ENGINE EM E as cAsv uowworsrncct-l e
e>
case 4oo, att.imons eosos taternonesis. zee.aoaa I
i l
t SLS-I-3599 August 26,. 1982.
Project No. 4536' File 1.1 & 5.34, K-28PJ Illinois Power Company' Clinton Power Station - Unit 1 Refueling Ballows - (Fr Mapping of Welds Mr. J, D, Geier Manager of Nuclear Stetice Engineering Illinois Power Company 500 South 27th Street Decatur, Illinois. 62525 Attention Mr. I R Combat 2:
Gentlemen We have. revious&_ Southwest Researsb J.natitutals. Ruminetio2r Procedura STriBI.-NDT.-60Cb-33, Rah 4 anr1 han no ernemant_ This procedure-is_to he used. foc s. UT. examination. of all the seam welds att the top and bottoia. horizontal, fIange plates. and. thet l
botton ve.r.+ Mal shot the. bellows _ asammhly. ife will need, the results of the==in= tion. alMM in. tha. fora oi a weld I
map showing 4 L and. 3. dimensions (size) of the-inef+eations-l and X, Y, and 2 coordinates to-tbs contar-(location) of ths bdications that aved SOA DAC This would, facilitata.
intarpretation at tha. awamination.resu:lts:and expedite car-evaluation.
Yours very truly,.
P. K. ACT.AWAL.
P. K. Agrawal.
Senior Structural.
PKA/dh Project mvrinaa" copies:
J. S Spencer i
E. M. Sroka R. C. Heider l
R. A. 14'itt D. K. Schopfer M. Zar
- s.
s -
Att'ch. ment 2 F
~
~
d r
h ' TOF MORir.. PLA
~
~
1 I
(
/
/
\\
I Ino.
Y l
1 BoITom HoRiz.. Ft. ATE r
~
BorroM VER.T WlR1 ~
(.
hivTE. :
TY FIcAt. WEw9 TD BE. E.X AMIMED E
p g
W 4
4 6
.e*
h a
a 6
6 8
p a
.e e
l i
I e
I
-es 1
1
.E e
M
,.. [. -
Sheet l'of 2 To:
D. E. Korneman, V-600 he/7[p3 From:
J. S. Spencer, V-750 Date:
January 7, 1983 Subj ect: Refueling Bellows Dispositioning Plan (Stop Work Order No. 010)
Attached for your use in the recovery effort is the plan for dispositioning the drywell refueling bellows. As you will note from the plan, the " completion" date is dependent on the results of S&L's analysis and, if required, IP PMD's l
decision to repair or replace. The estimated dates for activities outside of engineering's control are based on my discussions with you.
If you need any further assistance or information, please let me know.
JSS:ceb Attachment cc:
D. P. Hall, V-805 J. H. MacKinnon, V-650 J. D. Geier, F-33 R. C. Heider, S&L D. K. Schopfer, S&L, V-750
3 PLAN FOR DISPOSITIONING ReruttiNo %t 3, Shnnt 2 of 2 Attachm
'c'
. g ettows_
SWO 010 S W AI COMPLETE, U.T. OF SEAM WELOS (COMPLETE-ACT. 12 16 82
)
l I.P SUBMIT U.T. R ESULTS TO S 6L FOR EVALUATION (COMPLETE-ACT. IE 16 81 )
I IR SUBMIT PREVIOUS RADIOGRAPNS TO 5 E.L.
(COMPLETE-ACT. f1 8 82 )
I S L L PREPARE WELO M APS OF RT. 6 U.T. INDIC ATION S (COMPLETE - ACT 1% 5 83
)
l S 6L PERFORM FRACTURE MECHANICS / CRACK PROPAGATION ANALYSIS TO DETERMINE ACCEPTABILITY OF WELOS (COMPLETE-EST.1-12 83
)
S 6L REVISE DISDOSITION OF
,yg3 WELOS NC R 63 28 TO'USE AS-IS
)
l IP AUTHORIEE CB&I TO
'NO
- INSTALL REFUELING BELLOWS S Ca t. REVISE OtSPOSITION (COMPLETE - EST. 2 18 -83
)
OF ER OM M I
' REWORK OR REJECT" CB 6 I SUBMIT INSTALLATION (coupLETE - EST t - 2G -83
)
PROCEOURES FOR St.L APP!DYAL l
(coupttTe.- EST. 2 2 S -83
)
I.R TO M A K E D ECISIO N TO l
- REWORK OR R EJ LCT" S E.L APPROVE CB 61 (COMPLETE - EST. 2 4 - 83 )
PROCEOURES (coM pLETE - If ST 3 - it - 8 3
)
I C 6 6I NOBILIEE 6 INSTALL B ELLO W S (coM pte.TE - EST. 3 2f/4 tS 83 )
' REJECT' I
IP AUTHORIZE CB c. I IP AUTNORIZIL CB SI TO INSTAL L NEW BELLOWS (coM PLETE EST 2, 2S +83
)
(cc MPLET&
- EST 2 - f 8 - 83
)
(COMPLETE - EST Z - f 8 -83
)
I
~
l I
CS6I SUSMIT INSTALLATION CB E. I SUBMlf REPAIR de (COMPLETE - EST 2 2e 83 )
INSTALL ATIO N PROCEDURES PSDCEDURES FOR St.L APPROVAL FOR S E. L APPROVAL I
(coM PLETE - E ST 2 - 2 S -8 5 )
g 76L A0 prove c e, c. I receive NEW BELLOWS l
[,3 3
- SS' PROCEOuR ES S 6 L APPROVE CB C4 I pg,,
)
(COM PLE.Tr> - EST. 3 - fl - 8 3
)
PROCEDURES I
(COMPLETE - EST s -in -8s
)
C 6 6 I MOBf LtEE F. INSTALL I
NEW BELLOWS ASSEMBLY CB E I MOBILIEE AND (coupLETE-EST 7 f /8 1-83
)
REPAIR E. INSTALL REFUELING B E L LO WS (COMPLETE-EST S 2f/4-29-83)