Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212H344 + (Rev 1 to Comanche Peak Response Team Results Rept Isap I.b.4, Barrier Removal)
- ML20236P591 + (Rev 1 to Comanche Peak Response Team Results Rept Issue Specific Action Plans Ii.D, Seismic Design of Control Room Ceiling Elements)
- ML20206T553 + (Rev 1 to Comanche Peak Response Team Results Rept I.d.2, Guidelines for Administration of QC Inspector Test)
- ML20235S166 + (Rev 1 to Comanche Peak Response Team Results Rept:Issue Specific Action Plan Ii.E, Rebar in Fuel Handling Bldg)
- ML20212H386 + (Rev 1 to Comanche Peak Response Team Results Rept Isap V.D, Plug Welds)
- ML20202B159 + (Rev 1 to Comanche Peak Seismic Interaction Criteria. Related Info Encl)
- ML20211K341 + (Rev 1 to Comanche Peak Steam Electric Station Train C Conduit 2 Inch & Under Criteria Document,Reg Guide 1.29 Issue (Trt Issue 1.c))
- ML20105B833 + (Rev 1 to Comanche Peak Steam Electric Station,Glen Rose,Tx ASME Section XI Inservice Insp Program Plan,Unit 1, Commercial Operation:900813,First Interval)
- ML20135E465 + (Rev 1 to Comment & Response Document for Long-Term Surveillance Plan for Falls City Disposal Site,Falls City, Tx)
- ML20202F106 + (Rev 1 to Compliance Evaluation Rept for Renewal of Coc GDP-2, for Portsmouth Gaseous Diffusion Plant,Piketon,Oh)
- ML20202F099 + (Rev 1 to Compliance Evaluation Rept for Renewal of Coc GDP-1, for Paducah Gaseous Diffusion Plant,Paducah,Ky)
- ML20140D869 + (Rev 1 to Compliance Rept - Reg Guide 1.97 (Rev 3))
- ML20071A443 + (Rev 1 to Component Cooling Sys, Draft Chapter to PRA)
- ML20111C117 + (Rev 1 to Comprehensive Vibration Assessment Program for Palo Verde Nuclear Generating Station Unit 1 (Sys 80 Prototype),Evaluation of Predictions & Pre-Core Hot Functional Measurement & Insp Programs)
- ML20147H327 + (Rev 1 to Conceptual Decommissioning Plan for London Road Facility)
- ML20034C456 + (Rev 1 to Conceptual Decommissioning Plan & Cost Estimates. W/Two Oversize Encl)
- ML20155J292 + (Rev 1 to Conduct of Operations Procedure 2.0.3, Control Room Conduct & Manning)
- ML20136D658 + (Rev 1 to Confirmatory Reactor Bldg Basemat Analysis for Hope Creek Generating Station Pse&G)
- ML20246B815 + (Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept)
- ML20214R743 + (Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3)
- ML20148C044 + (Rev 1 to Conformance to Reg Guide 1.97 - Fitzpatrick)
- ML20214E343 + (Rev 1 to Conformance to Reg Guide 1.97,Nine Mile Point Nuclear Station,Unit 1)
- ML17308A242 + (Rev 1 to Conformance to Reg Guide 1.97,St Lucie Plant,Units 1 & 2)
- ML20204H538 + (Rev 1 to Conformed Spec SP-562-4549-00, Class 1E Diesel Generator Units)
- ML20207P092 + (Rev 1 to Consolidated Application for Certificate of Compliance 9019 for Model BU-7)
- ML20072J468 + (Rev 1 to Const Completion Program. Viewgraphs Encl)
- ML20217M709 + (Rev 1 to Const Environ,Safety & Health Mgt Plan ESH-1, Umtra Site Personnel Training & Notification Requirements)
- ML20217M715 + (Rev 1 to Const Environ,Safety & Health Mgt Plan ESH-3, Safe Conduct of Electrical Work)
- ML20137J682 + (Rev 1 to Const Procedure 35-1195-CCP-10, Concrete Batch Plant Operations)
- ML20202A685 + (Rev 1 to Const Procedure 35-1195-DCP-3, Reproduction)
- ML20211J540 + (Rev 1 to Const Procedure CP-CPM 7.1, Package Flow Control. Related Info Encl)
- ML20138P345 + (Rev 1 to Const Procedure CP-CPM 8.1, Receipt,Storage & Issuance of Items, Incorporating Document Change Notices 1-6)
- ML20072K621 + (Rev 1 to Const Project Evaluation of Consumers Power Co Midland Energy Ctr Project Units 1 & 2)
- ML20127C391 + (Rev 1 to Const Work Procedure W-WP-17, Housekeeping)
- ML20127C135 + (Rev 1 to Const Work Procedure W-WP-2, Clam Shell Filter Blanket Placement)
- ML20127C261 + (Rev 1 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
- ML20127C355 + (Rev 1 to Const Work Procedure W-WP-8, Handling & Installation of Waterstops)
- ML20203J186 + (Rev 1 to Containment Bldg Liner Plate Design Rept)
- ML20071A454 + (Rev 1 to Containment Fan Cooling (CF) Sys, Draft Chapter to PRA)
- ML20117D320 + (Rev 1 to Containment Integrity Analyses for Ice Weight Optimization Engineering Rept)
- ML20071D667 + (Rev 1 to Containment Isolation/Purge Valve Analysis: 48-Inch Ria Valve W/Bettis Actuator. W/One Oversize Drawing.Aperture Card Is Available in PDR)
- ML20071D704 + (Rev 1 to Containment Isolation/Purge Valve Analysis: 54-Inch Ria Valve W/Pratt 2 Plate Cylinder Operator. W/One Oversize Drawing.Aperture Card Is Available in PDR)
- ML20116H450 + (Rev 1 to Containment Recirculation Sump Evaporation)
- ML20071A438 + (Rev 1 to Containment Spray Sys, Draft Chapter to PRA)
- ML17335A545 + (Rev 1 to Containment Sump Level Design Condition & Failure Effects Analysis for Potential Draindown Scenarios)
- ML20083M597 + (Rev 1 to Control Room Design Review;Program Plan)
- ML20210U738 + (Rev 1 to Control Room Emergency Air Sys for Units 1 & 2)
- ML13323A464 + (Rev 1 to Control Room HVAC Sys Value Impact Assessment, SEP Topic II-1.C,Offsite Hazards,NUREG-0737,Item III.D.3.4, Control Room Habitability)
- ML17139B885 + (Rev 1 to Control Sys Power Supply & Sensor Malfunction Study)
- ML20099L053 + (Rev 1 to Control of Heavy Loads)
- ML20127D738 + (Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept)