MONTHYEARML20217C7961999-10-0606 October 1999 Marked-up & Type Written Proposed TS Pages,Revising TSs 1.0, 3.6,Bases 3.0,Bases 3.6 & 5.5,to Adopt Implementation Requirements of 10CFR50,App J,Option B for Performance of Type A,B & C Containment Leakage Rate Testing ML20209A7351999-06-23023 June 1999 Proposed Tech Specs Pages 3.3-4 & 3.3-6,replacing Page 3.3-6 Re Recirculation Loop Flow Transmitters & Applicable SRs Associated with Function 2.b ML20196B4741999-06-17017 June 1999 Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610 ML20195E9101999-06-0808 June 1999 Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested ML20207A0761999-05-14014 May 1999 Rev 3 to CNS Strategy for Achieving Engineering Excellence ML20206J2661999-04-22022 April 1999 CNS Offsite Dose Assessment Manual (Odam) ML20205H2891999-03-31031 March 1999 Proposed Tech Specs Modifying ACs for Unit Staff Qualifications for Shift Supervisor,Senior Operator,Licensed Operator,Shift Technical Advisor & Radiation Manager Positions ML20151Q0621998-07-28028 July 1998 Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS ML20236W1141998-07-28028 July 1998 Proposed Tech Specs Re Implementation of BWR Thermal Hydraulic Stability Solution ML20236R9821998-07-16016 July 1998 Proposed Tech Specs Section 6.5.1,re Implementation of BWR Thermal Hydraulic Stability Solution ML20236Q0641998-07-13013 July 1998 Proposed Tech Specs Re Rev B to Conversion to Improved STS ML20206P9051998-07-0707 July 1998 Rev 2, Strategy for Achieving Engineering Excellence, for Cooper Nuclear Station ML20216H0571998-04-15015 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20216H0801998-04-15015 April 1998 Proposed Tech Specs Sections 2.1.A.1.d & 3.2.C,deleting Max Rated Power for APRM Rod Block Trip Setting ML20216D8971998-04-0808 April 1998 Rev 1 to Strategy for Achieving Engineering Excellence ML20216B4481998-04-0202 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20203G4271998-02-24024 February 1998 Rev 0 to First Ten-Year Interval Containment Insp Program for Cns ML20202H5311998-02-11011 February 1998 Strategy for Achieving Engineering Excellence ML20216G1571997-09-0505 September 1997 Rev 2.1 to Third 10-Yr Interval Inservice Insp Program ML20210H5641997-08-0707 August 1997 Rev 2 to NPPD CNS Third Interval Inservice Testing Program ML20148G3481997-05-30030 May 1997 Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating Cycle ML20148G8531997-05-0909 May 1997 Nebraska Public Power District Nuclear Power Group Phase 3 Performance Improvement Plan, Closure Rept ML20138J0751997-05-0505 May 1997 Proposed Tech Specs,Relocating Control of Standby Liquid Control Relief Valve Setpoint in TS 4.4.A.2.a & Associated Bases ML20148B0041997-05-0202 May 1997 Proposed Tech Specs,Deleting SLC Relief Valve Testing Described in TS Section 4.4.A.2.a & Associated Bases in Bases Section 3.4.A Since Testing Is Already Performed Under ISI Program ML20138H3861997-04-29029 April 1997 Rev 1.2 to CNS Third Interval IST Program ML20134K3771997-02-10010 February 1997 Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions.. ML20134E1091996-10-25025 October 1996 NPPD Cooper Nuclear Station Third Interval IST Program, Rev 1 ML20117K3291996-06-0606 June 1996 Proposed Tech Specs Revising Safety Limit MCPR from 1.06 to 1.07 for Dual Recirculation Loop Operation & from 1.07 to 1.08 for Single Recirculation Loop Operation ML20100R4431996-03-0505 March 1996 Proposed Tech Specs,Consisting of Change Request 142, Revising TS, DG Enhancements ML20101L8381995-12-31031 December 1995 Reactor Containment Bldg Integrated Leak Rate Test. W/ ML20113B0531995-12-29029 December 1995 Rev 4.1 to NPPD CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20093L1901995-10-18018 October 1995 Rev 0 to Third Ten-Yr Interval ISI Program for Cns ML20086K4421995-07-14014 July 1995 Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs ML20086H7341995-07-14014 July 1995 Rev 7 to CNS Second Ten Yr Interval IST Program ML20086H7601995-06-30030 June 1995 Rev 4 to CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20086B7061995-06-28028 June 1995 Proposed Tech Specs Re Increasing Required RPV Boron Concentration & Modifying Surveillance Frequency for SLC Pump Operability Testing ML20085J2631995-06-15015 June 1995 Proposed Tech Specs Re Extension of Surveillance Intervals for Logic Sys Functional Testing for ECCS ML20083A7241995-05-0505 May 1995 Proposed Tech Specs Reflecting Changes to TSs & Associated Bases for License DPR-46 ML20083A1341995-05-0202 May 1995 Proposed Tech Specs Re Temporary Rev to SR to Extend Two Year LLRT Interval Requirement ML20083M0401995-01-20020 January 1995 Rev 1 to Restart Readiness Program ML20083M0901995-01-13013 January 1995 Rev 2 to Startup & Power Ascension Plan ML20149H8821994-12-27027 December 1994 Proposed Tech Specs Re Control Room Emergency Filter Sys ML20078S5711994-12-22022 December 1994 Proposed Tech Specs Re Definition of Lco,Per GL 87-09 ML20083M0141994-11-0909 November 1994 Rev 3 to Phase 1 Plan, ML20083M0321994-11-0808 November 1994 Rev 0 to Restart Readiness Program ML20073J2371994-09-26026 September 1994 Proposed TS LCOs 3.5.C.1 & 3.5.C.4,increasing Min Pressure at Which HPCI Sys Required to Be Operable from Greater than 113 Psig to Greater than 150 Psig ML20149F9921994-09-15015 September 1994 Rev 1 to CNS Startup Plan ML20071K9311994-07-27027 July 1994 Diagnostic Self Assessment (DSA) Implementation Plan ML20071K1541994-07-26026 July 1994 Proposed Tech Specs to Increase Flow Capacity of Control Room Emergency Filter System ML20070M6671994-04-26026 April 1994 Proposed Tech Specs Re Intermittent Operation of Hydrogen/ Oxygen Analyzers 1999-06-08
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20207A0761999-05-14014 May 1999 Rev 3 to CNS Strategy for Achieving Engineering Excellence ML20206J2661999-04-22022 April 1999 CNS Offsite Dose Assessment Manual (Odam) ML20206P9051998-07-0707 July 1998 Rev 2, Strategy for Achieving Engineering Excellence, for Cooper Nuclear Station ML20216D8971998-04-0808 April 1998 Rev 1 to Strategy for Achieving Engineering Excellence ML20203G4271998-02-24024 February 1998 Rev 0 to First Ten-Year Interval Containment Insp Program for Cns ML20202H5311998-02-11011 February 1998 Strategy for Achieving Engineering Excellence ML20216G1571997-09-0505 September 1997 Rev 2.1 to Third 10-Yr Interval Inservice Insp Program ML20210H5641997-08-0707 August 1997 Rev 2 to NPPD CNS Third Interval Inservice Testing Program ML20148G8531997-05-0909 May 1997 Nebraska Public Power District Nuclear Power Group Phase 3 Performance Improvement Plan, Closure Rept ML20138H3861997-04-29029 April 1997 Rev 1.2 to CNS Third Interval IST Program ML20134E1091996-10-25025 October 1996 NPPD Cooper Nuclear Station Third Interval IST Program, Rev 1 ML20113B0531995-12-29029 December 1995 Rev 4.1 to NPPD CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20093L1901995-10-18018 October 1995 Rev 0 to Third Ten-Yr Interval ISI Program for Cns ML20086H7341995-07-14014 July 1995 Rev 7 to CNS Second Ten Yr Interval IST Program ML20086H7601995-06-30030 June 1995 Rev 4 to CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20083M0401995-01-20020 January 1995 Rev 1 to Restart Readiness Program ML20083M0901995-01-13013 January 1995 Rev 2 to Startup & Power Ascension Plan ML20083M0141994-11-0909 November 1994 Rev 3 to Phase 1 Plan, ML20083M0321994-11-0808 November 1994 Rev 0 to Restart Readiness Program ML20149F9921994-09-15015 September 1994 Rev 1 to CNS Startup Plan ML20071K9311994-07-27027 July 1994 Diagnostic Self Assessment (DSA) Implementation Plan ML20065H7481994-03-31031 March 1994 Near Term Integrated Enhancement Program, 940331 ML20063L2391994-01-31031 January 1994 Jan 1994 Addenda Cooper Nuclear Station IST Program for ASME Class 1,2 & 3 Components, Rev 6 ML20058C3331993-11-17017 November 1993 Rev 1 to Procedure MIUB-W812, Ultrasonic Insp of Pressure Retaining Bolting Two Inches or Greater in Diameter ML20058C3501993-11-15015 November 1993 Rev 0 to Procedure GE-UT-307, Procedure for Ultrasonic Exam of Reactor Pressure Vessel Closure Studs ML20128P0451992-12-21021 December 1992 Dec 1992 Addenda to Rev 6 to Cooper Nuclear Station Inservice Testing Program for ASME Class 1,2 & 3 Components ML20118A6151992-07-31031 July 1992 Jul 1992 Addenda to Rev 6 to Inservice Testing Program for ASME Class 1,2, & 3 Components ML20091K1831991-12-17017 December 1991 Dec 1991 Addenda to Rev 3 to Cooper Nuclear Station Inservice Insp Program for ASME Class 1,2 & 3 Components ML20086E6161991-11-0808 November 1991 Revised Pages to Cooper Nuclear Station Inservice Insp Program ML20085G1841991-08-31031 August 1991 Aug 1991 Addenda to Cooper Nuclear Station Inservice Testing Program for ASME Class 1,2 & 3 Components (Rev 6) ML20082H6371991-08-0101 August 1991 Aug 1991 Addenda to Rev 3 to Cooper Nuclear Station, Inservice Insp Program for ASME Class 1,2 & 3 Components ML20043C7951990-05-25025 May 1990 Rev 6 to Inservice Testing Program for ASME Class 1,2 & 3 Components. ML19332C8181989-10-31031 October 1989 October 1989 Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components. ML20246J4271989-07-31031 July 1989 Jul 1989 Addenda to Inservice Insp Program for ASME Class 1,2 & 3 Components, Rev 3 ML20247K7591989-02-28028 February 1989 Addenda to Rev 3 to, Inservice Insp Program for ASME Class 1,2 & 3 Components ML20151U1551988-08-12012 August 1988 Long-Term Plan for Code Qualification of Seismic Class 1S Pipe Supports Cooper Nuclear Station ML20235U4221987-09-21021 September 1987 Reportability Analysis for 10CFR50.50 to Rev 5 to Engineering Procedure 3.3, Station Safety Evaluations. Related Info Encl ML20235U4091987-09-21021 September 1987 Temporary Mod Sheet to Rev 2 to Conduct of Operations Procedure 2.0.7, Plant Temporary Mod Control ML20235T2711987-08-20020 August 1987 1987 Annual Emergency Preparedness Exercise ML20153F0491987-06-0101 June 1987 Addenda to Rev 3 to Inservice Insp Program for ASME Class 1 2 & 3 Components ML20212D6301986-12-18018 December 1986 Fitness for Duty Policy ML20064A6961986-12-0202 December 1986 App I to PEI-TR-870200-01 Test Procedure for Steam Accident Test of Limitorque Control & Power Wiring & Okonite Tape Splices ML20211B4971986-09-30030 September 1986 Rev 5 to Offsite Emergency Plan Prompt Alert & Notification Sys Addendum for Cooper Nuclear Station ML20211B4891986-09-30030 September 1986 Rev 4 to Offsite Emergency Plan Prompt Alert & Notification Sys Addendum for Cooper Nuclear Station ML20214W0111986-08-22022 August 1986 Rev 2 to Procedures Generation Package ML20211B4851986-07-31031 July 1986 Draft Rev 3 to Offsite Emergency Plan Prompt Alert & Notification Sys Addendum for Cooper Nuclear Station ML20212B9141986-07-31031 July 1986 Vols I & II of Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program ML20211B4751986-06-30030 June 1986 Rev 2 to Offsite Emergency Plan Prompt Alert & Notification Sys Addendum for Cooper Nuclear Station ML20206T6551986-06-12012 June 1986 Rev 13 to Surveillance Procedure 6.3.2.1, Automatic Depressurization Sys Manual Valve Actuation ML20206T6791986-06-12012 June 1986 Rev 23 to Surveillance Procedure 6.3.3.1, HPCI Test Mode Surveillance Operation 1999-05-14
[Table view] |
Text
--
---......oo-n.. o . o . .v.. v , mm . v..., .m..o m.
C0tWiGY OF OPERATIONS PROCEDURE 2.0.3 CONTROL ROOM CONDUCT AND MANNING I. PURPOSE A. The purpose of this procedure is to provide guidance for proper conduct ~
in the Control Room and for the proper manning of the Control Room.
II. PROCEDURE A. Control Room Area.
- 1. The Control Room is defined as the area within the security wall.
The area outside the security wall is defined as the Control Room observation area.
- 2. Within the Control Room security wall is the Shift Supervisor's office. Generally most business with the Shift Supervisor will be conducted at the window located in the security wall.
B. Authorization For Entry.
- 1. No personnel, except those assigned a job requiring access, opera- -
tions personnel, and members of SORC are to enter the Control Room unless specifically authorized by the Division Manager of Nuclear Operations, Operations Manager, or Operations Supervisor.
- 2. When. entering the Control Room, each individual will ensure his '
presence and purpose is known by the Control Room Operators. He will take care not to interfere with the requirements of the '
operations personnel in maintaining continued safe station opera-tions.
- 3. The Shift Supervisor, and in his absence the Control Room Operator, has the responsibility to ensure all functions in the Control Room are carried out in a professional and safe manner, and prevent unnecessary personnel from loitering in the area.
- 4. The Shift Supervisor, and in his absence the Control Room Operator, has the authority to control access to the Control Room of station or visiting personnel. During abnormal operating conditions station supuort personnel will be directed to the Technical Support Center by the Shift Supervisor or Control Room Operator.
C. Visitors.
- 1. In_ general, all visitors will be confined to the Observation Area outside the Control Room. Authorized visitors to the Control Room will be required to inform the Shif t Supervisor or Control Room Operator of their presence and will remain clear of the Control Room panels.
8605230084 860519 PDR ADOCK 05000298 .
g emggpq f**P ""
O PDR ; -
k- !! <.-
' (
>. ,: 4 -
R: vised By/ Data n -
g u t Reviewed)lyW5mthe u Ais Appr&Id By/Dare -
- Rev Procedure Page 1 Of Si Frazier 11/13/85 R. Brungardt 12/23/85 J1v[zk66 p 1 2.0.3 3 Pages s
a pa p a n il Ft- oi i /
h $Nh5 NY N i N === &
D. Conduct Of Personnel In Control Room.
- 1. Operating and all other personnel shall adhere to rules and regu-lations pertaining to good conduct in and about the Control Room.
Good conduct shall mean holding noise levels to a minimum, main-taining a conscientious work attitude, following instructions closely, and demonstrating the ability to cooperate with super-visors and subordinates.
- 2. Operating personnel shall refrain from taking food or drink to control consoles.
- 3. Personnel shall leave the Control Room area when directed by the Shif t Supervisor or Control Room Operator.
4 All personnel will contribute to the implementation and maintenance of good housekeeping activities in the Control Room. The Control Room shall be kept in a clean and orderly condition.
E. Manipulation Of Controls.
- 1. Only'a licensed Reactor Operator shall manipulate reactor controls or direct another to manipulate these controls.
- 2. Any time any control is placed in an out of normal position due to -
a malfunction or maintenance and is not under an Equipment Clearance Order, it shall be designated by a small magnetic base red arrow on a white background. Additionally, annunciators and other indicators which may be out of service or require particular attention may be indicated by a red arrow. Nuisance alarms may also be marked with a red arrow as outlined in Alatu Procedure 2.3.1, General Alarm Procedure.
- 3. All Operators are responsible to believe and respond to instrument indications until they are showa to be incorrect.
F. Manning Of Control Room And Control Room tJatch Requirements.
- 1. Station manning requirements are detailed in Technical Specifica-tions and as the NRC updates the Technical Specifications to be in conformance with the most recently published NRC guidelines.
- 2. There shall be nine people on shif t subj ect to several minimum staffing criteria below:
- a. Shift manning as described in Technical Specifications.
AND
- b. Normal operating crew makeup.
- 1) Shift Supervisor (SRO).
.- ENj ONI f' 9 %I Illin D E *N 8iOne ku. .
rcctdure Number 2.0.3 Date a.m.g5 Revision 1 _Page 2 Of 3 Pages
-,, -- na - . -
~
F' , Q R sig gg p a wh o
- 2) Control Room Supervisor (SRO) .
- 3) Two Ros (Balance of Plant Operator and Reactor Operator).
- 4) Three Station Operators Licensed Station Operators may be assigned as Station Operators.
- 5) One Chemistry / Health Physics Technician.
- 6) One STA.
- c. One SRO must be in the Control Room at all times during power operation, startup, or hot shutdown.
- d. Two licensed persons must be in the Control Room at all times during power operation, startup, or hot shutdown.
- e. One RO or SRO must be in view of the front Control Room panels at all times. .
- f. Two people must be in the Control Room at all times per our Security Plan.
- g. The STA function is not normally manned during cold shutdown conditions except during testing as directed by the Division Manager of Nuclear Operations as he deams necessary.
- h. The Communications Technician function is assigned to one of the Station Operators. The assigned Communications Technician must report to the Control Room to make required notification ,
within 10 minutes of notification of a problem requiring the Communications Technician function is manned.
III. REFERENCES A. CNS Technical Specifications.
IV. ATTACHMENTS --.
A. None.
l l
l n a u m m e d' L-.
Prcesdure Number 2.0.3 Date /c0.W26,.5Di Revision 1 Page 3 Of 3 Page_s