Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Rev 0 to Control Room Design Review Program Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20151N769  + (Rev 0 to Comparison of Steam Generator Tube Plugging W/TMI-1 Design Basis)
  • ML17146A495  + (Rev 0 to Component Listing & Inservice Insp 10 Yr Plan)
  • ML20244B096  + (Rev 0 to Compressed Gas Sys Evaluation & Analysis for Palo Verde Units 1,2 & 3)
  • ML20129E983  + (Rev 0 to Coms/Ltop Pressure Instrument Loop Accuracy Calculation)
  • ML20148F025  + (Rev 0 to Condensate Storage Tank B)
  • ML20148F008  + (Rev 0 to Condensate Storage Tank a)
  • ML20236R983  + (Rev 0 to Conduit Supports Trains a & B & Train C Larger than 2 Inch Diameter, Project Status Rept)
  • ML20080C121  + (Rev 0 to Confirmatory Soil-Structure Interaction Analyses for GESSAR-II)
  • ML20246M640  + (Rev 0 to Connecticut Yankee Instrument & Controls Calculation:Dynamic Response of Low Pressurizer Pressure Scram Calculators)
  • ML20153G408  + (Rev 0 to Conneticut Yankee Replace Nuclear Instrumentation Sys, Neo Project Description)
  • ML20217M729  + (Rev 0 to Const Environ,Safety & Health Mgt Plan ESH-5, Environmental Safety & Health QA Records Procedure)
  • ML20217M722  + (Rev 0 to Const Environ,Safety & Health Mgt Plan ESH-4, Environmental Permit Compliance Procedure)
  • ML20199A645  + (Rev 0 to Const Field Procedure 35-1195-MEI-1, Special Engineering Instruction for Handling of Specific Safety- Related Equipment. Related Documentation Encl)
  • ML20137J664  + (Rev 0 to Const Procedure 35-1195-CCP-10, Concrete Batch Plant Operations)
  • ML20204A759  + (Rev 0 to Const Procedure 35-1195-DCP-3, Reproduction. Related Info Encl)
  • ML20199A531  + (Rev 0 to Const Procedure 35-1195-WCP-6, Electronic Alignment,Performance Verification & Maint of Dimetrics Gold Track II Automatic Welding Sys)
  • ML20211J822  + (Rev 0 to Const Procedure CP-CPM 9.18, Valve Disassembly/ Reassembly. Related Info Encl)
  • ML20127C386  + (Rev 0 to Const Work Procedure W-WP-12, Backfilling & Compaction)
  • ML20127C107  + (Rev 0 to Const Work Procedure W-WP-2, Clam Shell Filter Blanket Placement)
  • ML20127C168  + (Rev 0 to Const Work Procedure W-WP-4, Handling,Storage, Installation & Mod of Rebar)
  • ML20127C245  + (Rev 0 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
  • ML20138F938  + (Rev 0 to Control Bldg `Delta-P Test Single Mode Failure (Postulated) of Dampers (AH-D-37,41A & 28) & Airflow Measurements)
  • ML20140G802  + (Rev 0 to Control Room & Offsite Dispersion Factors)
  • ML20136E802  + (Rev 0 to Control Room & Offsite Doses Due to Control Rod Drop Accident)
  • ML20115E055  + (Rev 0 to Control Room Design Review Human Engineering Discrepancy Resolution Rept. Executive Summary,Addendum 1, Encl)
  • ML20094A281  + (Rev 0 to Control Room Design Review Program Plan)
  • ML20079R819  + (Rev 0 to Control Room Design Review Rept,San Onofre Nuclear Generating Station Units 2 & 3)
  • ML20083M621  + (Rev 0 to Control Room Design Review;Annunciator Study Rept)
  • ML20083M584  + (Rev 0 to Control Room Design Review;Control Room Survey Validation Rept)
  • ML20083M547  + (Rev 0 to Control Room Design Review;Executive Summary)
  • ML20083M518  + (Rev 0 to Control Room Design Review;Implementation Plan Rept)
  • ML20083M601  + (Rev 0 to Control Room Design Review;Operating Experience Review Validation Rept)
  • ML20083M610  + (Rev 0 to Control Room Design Review;Operating Experience Review Rept)
  • ML20083M533  + (Rev 0 to Control Room Design Review;Special Studies Rept)
  • ML20083M630  + (Rev 0 to Control Room Design Review;Sys Function & Task Analysis Rept)
  • ML20083M528  + (Rev 0 to Control Room Design Review;Sys Function & Task Analysis Validation Rept)
  • ML20210U758  + (Rev 0 to Control Room Ventilation Radiation Monitors)
  • ML20236E325  + (Rev 0 to Control of Design Calculations:Calculation Records Retention, TVA Employee Concerns Special Program Element Rept)
  • ML20151Q121  + (Rev 0 to Control of Hazard Barriers)
  • ML17325B526  + (Rev 0 to Cook Nuclear Plant Restart Plan)
  • ML20098A996  + (Rev 0 to Cooper Nuclear Station Performance Improvement Plans Phase 1:Startup Planning Process)
  • ML20024D078  + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1981)
  • ML20077F752  + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jan-June 1982)
  • ML20024D093  + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1982)
  • ML20077F822  + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jan-June 1981)
  • ML20246J126  + (Rev 0 to Coordination of Load Ctr Circuit Breakers,EP-1)
  • ML20127J356  + (Rev 0 to Core Damage Estimate Procedure CH-TI.22-011(Q), Estimation of Reactor Core Damage Under Accident Conditions)
  • ML20042G243  + (Rev 0 to Core Operating Limits Rept)
  • ML20034B893  + (Rev 0 to Core Operating Limits Rept (COLR) COLR 2-4, COLR for Diablo Canyon Unit 2 Cycle 4)
  • ML17291A214  + (Rev 0 to Core Operating Limits Rept Cycle 10)
  • ML20012D915  + (Rev 0 to Core Operating Limits Rept Unit 1 - Cycle 14)