Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151N769 + (Rev 0 to Comparison of Steam Generator Tube Plugging W/TMI-1 Design Basis)
- ML17146A495 + (Rev 0 to Component Listing & Inservice Insp 10 Yr Plan)
- ML20244B096 + (Rev 0 to Compressed Gas Sys Evaluation & Analysis for Palo Verde Units 1,2 & 3)
- ML20129E983 + (Rev 0 to Coms/Ltop Pressure Instrument Loop Accuracy Calculation)
- ML20148F025 + (Rev 0 to Condensate Storage Tank B)
- ML20148F008 + (Rev 0 to Condensate Storage Tank a)
- ML20236R983 + (Rev 0 to Conduit Supports Trains a & B & Train C Larger than 2 Inch Diameter, Project Status Rept)
- ML20080C121 + (Rev 0 to Confirmatory Soil-Structure Interaction Analyses for GESSAR-II)
- ML20246M640 + (Rev 0 to Connecticut Yankee Instrument & Controls Calculation:Dynamic Response of Low Pressurizer Pressure Scram Calculators)
- ML20153G408 + (Rev 0 to Conneticut Yankee Replace Nuclear Instrumentation Sys, Neo Project Description)
- ML20217M729 + (Rev 0 to Const Environ,Safety & Health Mgt Plan ESH-5, Environmental Safety & Health QA Records Procedure)
- ML20217M722 + (Rev 0 to Const Environ,Safety & Health Mgt Plan ESH-4, Environmental Permit Compliance Procedure)
- ML20199A645 + (Rev 0 to Const Field Procedure 35-1195-MEI-1, Special Engineering Instruction for Handling of Specific Safety- Related Equipment. Related Documentation Encl)
- ML20137J664 + (Rev 0 to Const Procedure 35-1195-CCP-10, Concrete Batch Plant Operations)
- ML20204A759 + (Rev 0 to Const Procedure 35-1195-DCP-3, Reproduction. Related Info Encl)
- ML20199A531 + (Rev 0 to Const Procedure 35-1195-WCP-6, Electronic Alignment,Performance Verification & Maint of Dimetrics Gold Track II Automatic Welding Sys)
- ML20211J822 + (Rev 0 to Const Procedure CP-CPM 9.18, Valve Disassembly/ Reassembly. Related Info Encl)
- ML20127C386 + (Rev 0 to Const Work Procedure W-WP-12, Backfilling & Compaction)
- ML20127C107 + (Rev 0 to Const Work Procedure W-WP-2, Clam Shell Filter Blanket Placement)
- ML20127C168 + (Rev 0 to Const Work Procedure W-WP-4, Handling,Storage, Installation & Mod of Rebar)
- ML20127C245 + (Rev 0 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
- ML20138F938 + (Rev 0 to Control Bldg `Delta-P Test Single Mode Failure (Postulated) of Dampers (AH-D-37,41A & 28) & Airflow Measurements)
- ML20140G802 + (Rev 0 to Control Room & Offsite Dispersion Factors)
- ML20136E802 + (Rev 0 to Control Room & Offsite Doses Due to Control Rod Drop Accident)
- ML20115E055 + (Rev 0 to Control Room Design Review Human Engineering Discrepancy Resolution Rept. Executive Summary,Addendum 1, Encl)
- ML20094A281 + (Rev 0 to Control Room Design Review Program Plan)
- ML20079R819 + (Rev 0 to Control Room Design Review Rept,San Onofre Nuclear Generating Station Units 2 & 3)
- ML20083M621 + (Rev 0 to Control Room Design Review;Annunciator Study Rept)
- ML20083M584 + (Rev 0 to Control Room Design Review;Control Room Survey Validation Rept)
- ML20083M547 + (Rev 0 to Control Room Design Review;Executive Summary)
- ML20083M518 + (Rev 0 to Control Room Design Review;Implementation Plan Rept)
- ML20083M601 + (Rev 0 to Control Room Design Review;Operating Experience Review Validation Rept)
- ML20083M610 + (Rev 0 to Control Room Design Review;Operating Experience Review Rept)
- ML20083M533 + (Rev 0 to Control Room Design Review;Special Studies Rept)
- ML20083M630 + (Rev 0 to Control Room Design Review;Sys Function & Task Analysis Rept)
- ML20083M528 + (Rev 0 to Control Room Design Review;Sys Function & Task Analysis Validation Rept)
- ML20210U758 + (Rev 0 to Control Room Ventilation Radiation Monitors)
- ML20236E325 + (Rev 0 to Control of Design Calculations:Calculation Records Retention, TVA Employee Concerns Special Program Element Rept)
- ML20151Q121 + (Rev 0 to Control of Hazard Barriers)
- ML17325B526 + (Rev 0 to Cook Nuclear Plant Restart Plan)
- ML20098A996 + (Rev 0 to Cooper Nuclear Station Performance Improvement Plans Phase 1:Startup Planning Process)
- ML20024D078 + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1981)
- ML20077F752 + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jan-June 1982)
- ML20024D093 + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jul-Dec 1982)
- ML20077F822 + (Rev 0 to Cooper Nuclear Station Semiannual Operating Rept - Radioactive Effluents,Jan-June 1981)
- ML20246J126 + (Rev 0 to Coordination of Load Ctr Circuit Breakers,EP-1)
- ML20127J356 + (Rev 0 to Core Damage Estimate Procedure CH-TI.22-011(Q), Estimation of Reactor Core Damage Under Accident Conditions)
- ML20042G243 + (Rev 0 to Core Operating Limits Rept)
- ML20034B893 + (Rev 0 to Core Operating Limits Rept (COLR) COLR 2-4, COLR for Diablo Canyon Unit 2 Cycle 4)
- ML17291A214 + (Rev 0 to Core Operating Limits Rept Cycle 10)
- ML20012D915 + (Rev 0 to Core Operating Limits Rept Unit 1 - Cycle 14)