{{#Wiki_filter:- . R EV: 0 MARCH 28,1983 Gontm!R< rom =&esign-Revtew Implementation

  • Plan Report A

'I il l 'I The SouthTexas Project I HOUSTON LIGHTING & POWER COMPANY I I y p T 8aaa m pa .

     $          HOUSTON                                                                             CONTROL ROOM l              LIGHTING                                                                             gggggy ggyjgy
   !  ?!!9!ESI POWER CO.

CRDR IMPLEMENTATION PLAN , TABLE OF CONTENTS Section Title Page TABLE OF CONTEN'IS i LIST OF TABLES il LIST OF FIGURES iii APPENDICES iv ACRONYMS AND ABBREVIATIONS v l PREFACE

SUMMARY

viii xii 1.0 INTRODUCTIO N 1-1 I 1.1 OBJECTIVE l-1 1 2.0 IMPLEMENTATION 2-1

2.1 BACKGROUND

2-1 2.2 IMPACT ON MAIN CONTROL PANELS 2-4 2.3 ANNUNCIATORS AND PLANT COMPUTER 2-11 2.4 OPERATOR'S/ SUPERVISOR'S CONSOLE 2-14 2.5 ADDITIONAL STUDIES 2-14 I 2.6 SCHEDULE 2-14 3.0 CRDR

SUMMARY

3-1 3.1 PROGRAM PLAN 3-1 l 3.2 MOCK-UP 3-4 3.3 CRITERIA REPORT 3-6 l 3.4 CONTROL ROOM INVENTORY 3-7 3.5 OPERATING EXPERIENCE REVIEW 3-7 3.6 SYSTEM FUNCTION AND TASK ANALYSIS 3-9 3.7 CONTROL ROOM SURVEY 3-11 l j i l 3.1/03163 9730P/0787P l . . . . . . . . . . . . . , , .. .

pp houston CONTROL ROOM g LIGHTING l DESIGN REVIEW l

     .   !?9!ESI POWER CD.

I CRDR IMPLEMENTATION PLAN TABLE OF CONTENTS Section Title Page 3.8 ANNUNCIATOR STUDY 3-13 3.9 CRDR OBSERVATIONS 3-14 4.0 ENGINEERING DESIGN CIIANGES 4-1 4.1 REGULATORY GUIDE 1.97 CIIANGES 4-1 4.2 DESIGN EVOLUTION 4-1 4.3 OTHER PANEL CHANGES 4-10 5.0 IMPLEMENTATION STUDIES 5-1 5.1 ALTERNATIVE 1: RE-LAYOUT ALL PANEIE 5-2 5.2 ALTERNATIVE 2: USE OF PRESENT LAYOUT 5-21 5.3 ALTERNATIVE 3: RE-LAYOUT ALL 10 CONTROL 5 .18 BOARDS USING SMALLER liARDWARE 5.4 ALTERNATIVE 4: RE-LAYOUT PANELS 1-6 5-30 5.5 ALTERNATIVE 5: REDESIGN ALL PANELS USING 5-34 MODULAR CONCEPT AND NEW FOOTPRINT LIST OF TABLES Table Title Page 2.1-1

SUMMARY

OF ALTERNATIVE EVALUATION 2-3 4.1-1 KNOWN DESIGN CliANGES 4-8 5.1-1 AREA AND CLEARANCE ALLOWANCE FOR 5-12 VARIOUS PANEL DEVICES 5.1-2 PANEL CIIANGES TO CONFORM TO SWITCII 5-13 g FUNCTION E il 3.1/03163 9730P/0787P

HOUSTON CONTROL ROOM UGHTING

            &                                                       DESIGN REVIEW

( ._ __E POWER CD. - [ CRDR IMPLEMENTATION PLAN TABLE OF CONTENTS LIST OF TABLES (cont'd) Table Title Page (, 5.1-3 EVOLUTION OF PANEL AREA REQUIREMENTS 5-14 5.1-4 COMPARISON OF REQUIRED VS USABLE PANEL 5-16 AREA { [- LET OF FIGURES Figure No. Title Page l { 2.2-1 STP CRDR - MAJOR REPORTS FUNCTIONAL ALLOCATION xi 2-8 (PROPOSED LAYOUT FOR ESF) 1 2.2-2 FUNCTIONAL ALLOCATION 2-9 l (PROPOSED LAYOUT FOR CP004-006) [ 2.2-3 FUNCTIONAL ALLOCATION 2-10 (PROPOSED LAYOUT FOR CP007-010) { 2.4-1 FUNCTIONAL ALLOCATION 2-13 (SUPERVISOR AND OPERATOR CONSOLES) r 2.6-1 CONTROL ROOM DESIGN REVIEW AND CONTROL 2-16 PANEL MILESTONES 3.1-1 OVERVIEW OF CR$R PROCESSES 3-3 L 3.2-1 STP CONTROL ROOM MOCK-UP 3-5 3.2-2 STP SIM ULATOR 3-6 p 111 L 3.1/03163 9730P/0787P

                                                                       ..-.4i. _., .

NI

f houston CONTROL ROOM LIGHTING g g ggg y g g ygg y

 ..        E  ,

OWER CO. CRDR IMPLEMENTATION PLAN TABLE OF CONTENE LIST OF FIGURES (cont'd) Figure No. Title Page 3.2-3 STP COMPUTER 3-7 5.1-1 REVEED LAYOUT FOR ALTERNATIVE 1 5-17 5.1-2 SCHEDULE FOR ALTERNATIVE 1 - METIlOD I 5-18 5.1-3 SCHEDULE FOR ALTERN ATIVE 1 - METHOD II 5-19 5.1-4 SCHEDULE FOR ALTERNATIVE 1 - METilOD III 5-20 5.4-1 SCIIEDULE FOR ALTERNATIVE 4 5-33 APPENDICES Appendix Title Page A PRELIMINARY ASSESSMENT OF CONTROL ROOM A-1 INSTRUMENTS TO MEET REGULATORY GUIDE 1.97 B PANEL DIAGRAMS SIIOWING THE B-1 KNOWN DEVICE ADDITIONS I I I I

                                                                                     ~

iv 3.1/03163 9730P/0787P mim e n

i~ HOUSTON CONTROL ROOM t.lGHTING - ,... a Oggggy ggyggy  !

          *Cl POWER CD.

" . ACRONYMS AND ABBREVIATIONS ( AO Auxiliary Operator ASSOC Associated ASST Assistant L Aux Auxiiiery CAT Category , ( CLO Checklist Observation CONT Control CR Control Room CRDR Control Room Design Review CRT Cathode RayTube CVCS Chemical Volume Control System EES Emergency Event Sequences [ EOF EPRI Emergency Operating Facility Electric Power Research Institute ESF Engineered Safety Feature (s) EST Estimate (d) EXPER Experience FW Feedwater l IIE Human Engineering h HED Human Engineering Discrepancy IIL&P Ilouston Lighting and Power Company { llPSI I&C High Pressure Safety Injection Instruments and Controls INPO Institute of Nuclear Power Operat6rs 7 L INSTR Instrument LDR Leader L LOCA Loss of Coolant Accident L'PSI Low Pressure Safety Injection ~ M/M Man / Machine MCP Main Control Panel 7 MON Monitor L, r y L 3.i/03ica 9730P/0787P

HOUSTON CONTROL ROOM LIGHTING DESIGN REVIEW

  !?051 POWER CD.

I ACRONYMS AND ABBREVIATIONS (Cont.) MW(e) Megawatts (electric) I NOS Numbers NRC Nuclear Regulatory Commission OERT Operating Experience ReviewTask Group OSC Operational Support Center PORV Power Operated Relief Valve PRT Project Review Team PSAR Preliminary Safety Analysis Report RAS Recirculation Actuation Signal PZR Pressurizer RCB Reactor Containment Building RCP Reactor Coolant Pump RCS Reactor Coolant System RECIRC Recirculating REQ'D Required RO Reactor Operator RWSr Refueling Water Storage Tank RX Reactor SBCS Standby Cooling System SG Steam Generator SIS Safety Injection System SOE Selected Operational Event (s) SPDS Safety Parameter Display System SRO Senior Reactor Operator SS Subsystem STAT SystemsTask AnalysisTeam SUPVR Supervisor g SW Switch a SYS System - TMI Three-Mile Island

                                                                                       ~

TSC Technical Support Center

                                                                                       ~

vi

                                                                                        ~

3.1/03163 9730P/0787P -

^ HOUSTON

  '$                                                                             CONTROL ROOM gggggy ggyggy
    % _POWER 1_,N    LIGHTING CD.

s 'E ACRONYMS AND ABBREVIATIONS (Cont.) ' L M W(e) Megawatts (electric) NOS Numbers I~ NRC Nuclear Regulatory Commission OERT Operating Experience Review Task Group r- OSC Operational Support Center PORV Power Operated Relief Valve PRT Project Review Team l PSAR Preliminary Safety Analysis Report RAS Recirculation Actuation Signal [ PZR RCB Pressurizer Reactor Containment Building ~ RCP Reactor Coolant Pump RCS Reactor Coolaat System RECIRC Recirculating REQ' D Required RO Reactor Operator RWST Refueling Water Storage Tank RX Reactor SBCS Standby Cooling System SG Steam Generator SS Safety Injection System SOE Selected Operational Event (s) SPDS Safety Parameter Display System { ( SRO Senior Reactor Operator SS Subsystem { bTAT SUPVR Systems Task Analysis Team Supervisor p SW Switch SYS System I l TMI Threc-Mile Island I TSC Technical Support Center vii l l 3.1/03163 g 9730e/o787e

f HOUSTON LIGHTING CONTROL ROOM DESIGN REVIEW

 .M!9Mf! POWER CO.

PREFACE I

                                                                              ~

The control room design review (CRDR) of the South Texas Project (STP) Nuclear I Generating Station was started in September 1982. This review is being performed by g Torrey Pines Technology for Houston Lighting & Power Company (HL&P) with Bechtel 3 Energy Corporation (Bechtel) acting as agent. Prior to completion of the CRDR, a decision was made by HL&P to redesign six of the ten main control panels. This redesign effort is required to accommodate design changes resulting from plant design evolution and Reg. Guide 1.97 requirements. Iluman engineering discrepancies determined in the CRDR for the six panels will be corrected in the redesign effort. The CRDR is described in the Program Plan document. It contains a detailed description of the tasks to be performed and the reports documenting the overall results. Due to the control room redesign effort, a modified approach is required to complete and document the CRDR program. The following changes have been made in the CRDR: A. The documentation program described in the Program Plan was changed to allow reporting of results on the individual CRDR tasks. I B. An implementation Plan Report, was written to describe the background and reasons for the redesign effort, it outlines the approach to be used for implementing panel layout changes. C. The tasks described in the Program Plan will be completed for the original design. The SFTA and the control room survey will be updated to validate any design revisions. g i J vill

                                                                                                ~

3.1/03163 9730P/0787P

? V HOUSTON CONTROL ROOM LIGHTING

                &                                                              DESIGN REVIEW

( .. .._ POWER CO. { This report is one of several documents (See Figure 1) that describe the CRDR and the associated redesign effort on the STP control panels. The following is a description of these documents: A. Program Plan - Defines the plan for performing the CRDR. B. Criteria Report - Provides the basis for the CRDR and describes the ( interface between the control room and plant systems. C. Operating Experience Review Report - Describes the review process results, conclusions and recommendations of the operating experience review (OER) task defined in the Program Plan. D. System Function and Task Analysis Report - Describes the methodology, ( results, conclusions and recommendations for the SFTA effort defined in the Program Plan. E. Control Room Survey Report - Describes the review process, results, conclusions and recommendations of the control room survey task defined

 ,                     in the Program Plan. This report also includes the final results and dispositions for the human factor observations obtained from the OER and

( the SFTA. { F. Annunciator Report - Describes the review process, results, conclusions and recommendation of the annunciator review task defined in the Program Plan. G. Special Studies Report - Describes details of any miscellaneous studies performed as part of the CRDR. This will include the anthropometric study, the hierarchial labeling study and the domarcation study. [ 3.1/03163 lx 0730P/0787P r .

HOUSTON CONTROL ROOM LIGHTING DESIGN REVIEW . .._.E POWEll CO. H. Implementation Plan Report - Summarizes the C' nR, the control room design changes, and the proposed methods of implementing the design changes.

1. Executive Summary - Summarizes the CRDR, results, conclusions and recommendations. Technical details are in the Operating Experience Review Report, the System Function and Task Analysis Report, the Control Room Survey Report, the Speelal Studies Report, and the Annunciator Report.

1 I I I l l I I I I

                                                                                     ~

3.1/03163 9730P/0787P e

I pp HOUSTON CONTROL ROOM i* y LIGHTING

      . PAC)N POWER CO.
  • DESIGN REVIEW l

l l l PROGRAM PLAN REPORT l CRITERIA REPORT OPERATING SYSTEM FUNCTION & EXPERIENCE REVIEW TASK ANALYSIS REPORT REPORT I CONTROL ROOM SURVEY REPORT ANNUNCIATOR STUDY SPECIAL STUDIES REPORT REPORT I I IMPLEMENTATION PLAN REPORT I i , EXECUTIVE

SUMMARY

REPORT I h STP - MAJOR REPORTS 3.1/03103 Fig m 1 xi

f HCUSTON LIGHTING CONTROL RQOM

     %                                                                                                                                                                               DESIGN REVIEW

_ NE POWER CD. SUA151ARY

 'Ihis report details the implementation measures planned for the South Texas Project I

control room, the status and results of the control room design review (CRDR) through February 1983, and reviews the activities associated with the management team decision to make major panel design changes. The CR DR process has progressed principally in conformance with the Generic Iatter No. 82-33, " Supplement 1 to NUREG-0737- Requirements for Emergency Response Capability" and the Program Plan submitted to the NRC October' 20,1982. Thmugh the control room review process, it became apparent that the status of engineering for the process systems, annunciator, and computer were undergoing revisions with a significant impact on the contml panels. The human factors checklist observations, operator interviews, and system function and task analysis were also finding a number of observations that would have a significant impact on the contml panels. Because of these factors the management team directed the DRT to review five alternatives as follow: Alternative 1: Re-layout all panels with existing devices to meet all Tall, engineering, and human factors requirements. Alternative 2: Imave everything 'hs-is" and use existing free space for the addition of new devices required by T51I and engineering requirements. Alternative 3: Re-layout all panels with new miniature devices to provide space for other devices required to meet Tall and engineering requiremedts. Alternative 41 Re-layout of the. safety-related panels CP001 through CP006 with existing devices, modify the remaining panels CP007 through CP010, to resolve ' human engineering discrepancies and accomodate design evolution impacts. l 3.1/03163

       ~

xii 9730P/0787P 1 .4 4 s-h'- _ _ _ _ - - _ _ _ . _ - - _ _ . - _ . _ - _ _ _ _ _ _ _ _ _ . _ _ _ _ - . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ - _ - _ - _ _ _ - _ _w

L F G HOUSTON CONTROL ROOM LIGHTING gggggy ggyjgy e ,. & - [ . ._. EE POWER CO. Alternative 5: Re-design all panels on a modular concept using miniature devices.and using a new and smaller foot-print. , Alternative 4 was selected on the basis of schedule. Bechtel placed a hold on the control boards ordered to the original panel layout and ordered new control boards based on a new layout to be completed by July 1983, with panel deliveries starting in January 1984. { The following outlines the status and work remaining in the major program elements covered in the following reports: A. Criteria Report

                                                                                                                                                                            )

This report includes all the NUREG-0700, Section 6 guidelines that have direct applicability to this plant. In addition, it includes definitive requirements for related subjects such as the Safety Parameter Display System (SPDS) and the annunciator system. This report is completed, reviewed by the Project Review Team (PRT), and approved by the Management Team (MT). An additional revision is planned for the final program stage to make minor corrections and additions. B. Operating Experience Review Report This report covers the results of the operations personnel responses to questionnaires and interviews. The results provided excellent correlation with the observations noted in the control room survey, the annunciator review, and the system function and task analysis (SFTA). L 1 [ xiii H E - L 3.1/03163 9730P/0787P e l _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ __ __ L

k HOUSTON LIGHTING CONTROL ROOM

        %                                                                     gggggy ggyggy
       .NE POWEFI CD.

The report is completed, reviewed by the PRT and approved by the MT. One more revision will be made du' ring the final program.to incorporate operations reaction to the implementation activities covered herein. I C. System Function and 'Ihsk Analysis Report: This report covers the SFTA of six plant events. The guidelines of NUREG 0700 were closely followed. The analysis of six events provided graphic evidence of the need to revise panellayouts; particularly those panels, for Fagineered Safety Features (ESF). This activity constituted a major portion of the design review effort and promises to be a very useful tool in the redesign effort. The report is completed, reviewed by the PRT and approved by the MT. An addendum to this report is planned to cover the pertinent implementation activities. D. Control Room Survey Report This report will include the results of the checklist observations, those processed into HEDs, and corrective actions planned with a schedule for such actions. It will contain a complete set of observations as processed through the PRTand MT. I I I 3.1/03163 9730P/0787P XIV h

m v ~ HOUSTON CONTROL ROOM l LIGHTING

              .&                                                                                                      DESIGN REVIEW                                   1 l

. .. 51 POWER CO. - l l J l _ All checklist forms have been completed for the original layouts of panels CP001 through CP010 and are in the review cycle. J l It will be necessary to recheck several criteria for the revised panels. This work will proceed as each panel layout is developed. E. Annunciator Study Report This report willinclude the review results of the annunciator study. This will also include the plant computer alarm functions and the ESF Bypass I and Inoperable Status. l To date, the study results indicate a need for finalization of the annunciator and I/O input definition. Rearrangement, size and location of L window boxes and tiles will be done when the control panel arrangements m are firmed-up. A preliminary annunciator review report, covering the current status, is being reviewed by the PRT. The following work will be completed after the input / output (I/0) lists are updated and the new panel layouts are available: prioritization of alarms, recheck of appropriate checklist items, rearrangement of tiles and window boxes, and final allocation of alarms between the computer and main annunciator. E [ xv E 3.1/03163 { 9730P/0787P ____________._______._________i____.____-.__._.___________.____..____. __ __ _ _ _ . _ . _ _ _ _ _ . _ . ___J

1 f$ HOUSTON CONTROL ROOM l LIGHTING gggggy ggyjgy g .= NE POWER CO. I F. Special Studies Report This report will cover expanded human factors studies as needed such as i anthropometry, labeling, demarcation, and console-desk design. The anthropometry study is completed. The ground rules for the labeling and demarcation are completed and the console conceptual design is completed. These .will be completed concurrent with the planned main panel layout changes. G. Executive Summary Report This report represents the principal document for reporting the results of the CRDR. It includes an introduction, methodology, summary of the review tasks and evaluation results, and tabulations of the disposition of observations and corrective actions tied to plant schedule. The outline for this report is completed. This report is in an early stage of preparation and is scheduled for completion by September 1983. I I I l I 3.1/03163 - 9730P/0787P xvi -

                                                                ~.

I HOUSTON CONTROL RO'OM l$ si i N$ { POWER CO. DESIGN REVIEW I 1.0 INT RODUCI' ION I A considerable number of design changes were required on the SI'P control panels as' a result of Reg. Guide 1.97 requirements, engineering design requirements and the CRDR. I This Implegtentation Plan Report describes the plans for implementing these design changes. The following details are presented: I A. A comprehensive discussion of the control room design changes. B B. A summary of the CRDR work completed to date. C. A discussion of the CRDR observations D. A description of the engineering design changes. I E. A discussion of five implementation alternatives that were evaluated for presentation to the management review team. 1.1 OBJECI'IVE In September 1982, the CRDR of the South Texas Project (SI'P) Nuclear Generating Station was started. This review was intended to accomplish the following: I A. Determine whether the control room provides the system status information, control capabilities, feedback, and analytical aids necessary for control room operators to accomplish their functions effectively. I i I l-1 3.1/03163 9752P/0787P

t 1 I fp houston CONTROL ROOM GHMG g g ggg y g g ygg y l y h EEE lOWER CO. P I B. Identify characteristics of the existing control room instrumentation, controls, physical arrangements, and other equipment that may impact optimum operator performance. C. Analyze and evaluate potential problems that could arise from this review. D. Define and put into effect a plan of action that applies human fcetors principles to enhance operator effectiveness. Particular emphasis is to be placed on improvements affecting control room design and operator performance under abnormal or emergency conditions. E. Integrate the CRDR review with other areas of human factors inquiries identified in the NRCTask Action Plan. I The CRDR was performed acc.ording to NUREG-0700 guidelines and in compliance with the NRC letter, " Supplement I to NUREG 0737 - Requirements for Emergency Response Capability (Generic Letter No. 82-33)." I I I I

I I

I 3.1/03163 9752P/0787P

      ?

b

$.L- i     4            - _ _ _                      _ _ _ ____ _ _ _ _ _ _ _ ___ _ ___ _ __ ___ _ __ _ _________

HOUSTON CONTROL ROOM

 ![K.h 1.lGHTlNG                _

g g gg g y g 5 y y__ y . ~

 . $$ ' POWER CD.

~ 2.0 IM PLEMENT ATION l

2.1 BACKGROUND

Approximately two months into the CRDR it was determined that a significant number of L control panel changes would be required to resolve the HEDs. Also, Bechtel Engineering indicated that many other devices' must be added to the panels. These additions were a f result of normal design evolution and the changes required to satisfy Reg. Guide 1.97 requirements. In November 1982, a MT meeting was held to review the changes required for the control panels. At this meeting, a decision was made to evaluate five possible alternatives for I incorporating the required design changes. These alternatives are discussed in detail in Section 5.0. F Evaluation of the five alternatives were presented to the MT December 20,1982. The MT decision was to proceed with Alternative 4, which consisted of a complete redesign of panels CP001 through CP006 and retention of panels CP007 through CP010 to the extent practicable. This decision was based on an evaluation of the feasibility, scheduling and licensing factors influencing each alternative. { Alternative 2, adding the new devices in spare spaces created by removing HVAC, etc., did not create enough space on panels CP005 and CP006, and was discarded. The use of new r devices, as proposed in Alternatives 3 and 5 could not reliably meet scheduling l requirements. Alternatives 1 and 4 ranked equally in most respects, however, Alternative g 4 preserves the panels that have been constructed, and was judged the more desirable. A L summary of the fectors considered versus the reietive impact of eech is presented in Teble 2.1-1. The effect of a proposed change to the overall plant construction schedule was considered F to be of primary importance by the MT. Bechtel engineering was directed to implement 2-1 3.1/03103 l 9753P/0787P l .

f HOUSTON CONTROL ROOM LIGHTING DESIGN REVIEW m ,- _ f39?.9 POWER CO. Alternative 4. The CRDR, which was interrupted in order for the alternative studies to be performed, was resumed. At th'e time of this decision, major sections of the' CRDR were not complete. Completion of these studies will assure that the revised layout satisfies the criteria established for the control panels by providing a means for checking the changes. I h I I I I I I I I 1 b M 2-2 9753P/0787P

L ' f $ HOUSTON IGHING CONTROL ROOM gggggy ggyyyy PyJE9 POWER CO. F lI - E C I X 00ES f'OT gh

  • gaccb o

hs W y MEET og s to me> geo CRITERIA $2 }C o$

                                               $       $go    m y lii I                                                          a 1         2    3         4     5 RACEWAY I             DESIGN X     X PANEL DELIVERY                     X ELEC DESIGN (LOGlCS, EWO'S)                    A               X I             CABLE PULL                         X               X SAME PROFILE       X               X               X I             SAME FOOTPRINT                                     X               ,

I CONSISTENT WITH CROR PLAN EXPANSION X X X LICENSABILITY/ X H FE'S AVAILABILITY /HFE X X l

SUMMARY

OF ALTERNATIVE EVALUATION I Table 2.1-1 23

I f HOUSTON CONTROL ROOM LlGHTING DESIGN REVIEW

     ?!!9Kl POWER CO.

2.2 IMPACT ON MAIN CONTROL PANELS Alternative 4 provides the basis for implementing the changes identified by the CRDR and other requirements. The results and recommendations from the following sources are to be incorporated into the new design: A. Design Evolution B. Post T MI Changes C. SFTA Results D. Control Room Survey (HEDs) E. Operating Experience Reviews F. Annunciator Study Changes in the plant design have required additional controls and displays. There are about 125 devices to be changed, affecting all control panels. Section 4.0 lists these devices by panel and by system. Post-TMI regulatory changes (Reg. Guide 1.97) involve the addition of about 100 devices, primarily for safety-related systems. These changes are also presented in Section 4.0. Significant changes to the control panels would be required to accommodate the Reg. Guide 1.97 and the engineering design changes. It was determined that panels 005 and 006 did not have sufficient available free space to mount the new devices. On the other panels, the addition of new devices involved either moving existing devices to make a g logical arrangement, or adding the new devices in existing space without regard to functional grouping. Relocation of the IIVAC controls and the recorders to two new panels outside the primary control would result in enough gained area to accommodate the new identified devices, with adequate spare space. The most significant observation obtained from the SFTA was excessive operator movement resulting from the train-oriented layout of panels 001, 002, and 003. Other u observations included the charging and letdown system devices not arranged by function on l CP004; the pressurizer and reactor devices not arranded by function on CP005; the 2-4 ~ 3.1/03163 . 9753P/0787P -

6 a l l l HOUSTON LIGHTING CONTROL ROOM

     %                                                                     DESIGN REVIEW N$ POWER CO.

auxiliary feedwater control from CP006 and the ESF panels not grouped by task; and the PORV controls from panels 006 and 007 not grouped by task. Other SFTA observations l related to the functional grouping of specific subsystems to conform with the sequences of actions the plant operators perform at each work station. The results of the control room survey, the operating experience review, and the annunciator study have been detailed in separate reports. The discrepancies noted in those reports, in the form of checklists, are being resolved by the methodology described in the Program Plan and the resulting changes will be incorporated into the control board during the redesign effort. The implementation of the recommendations of the above described studies requires a functional allocation of the available space, to properly orient the major segments of the plant controls in relation to function and frequency-of-use. The following paragraphs describe the proposed panel changes to accommodate the observations from all sources as described above. 2.2.1 ESF Panels - Proposed Changes I The original train-oriented layout of the ESF panels can be revised to a system-oriented layout as illustrated in Figure 2.2-1. Each of the areas identified in the figure has space allocated for the controls of the three ESF trains of that system. The electrical auxiliaries section on CP003 is part of the additions required by design evolution. Auxiliary feedwater controls are to be relocated to CP006 as indicated by operations and by the SFTA results. The indicators on CP002 used for post accident monitoring are located too high on the panel section for accurate operator viewing and were poorly I located for use during an event. These can be integrated into the systems so that safety grade instrumentation is available at a work station when needed. I I 3.1/03163 9753P/0787P

                                                        -                                                  u

r . I

  $           HOUSTON LIGHTING CONTROL ROOM         l DESIGN REVIEW        n P!!9!KI POWER CO.

I The location of ESF systems can be arranged, on the proposed allocation, as suggested by the SFTA, and modified by comments provided by HL&P operational staff. 2.2.2 Primary Coolant, Reactor and S/G Controls (CP004 through 006) - Proposed Changes The proposed layout for panels CP004, 005, and 006 is illustrated in Figure 2.2-2. The . controls for radiation monitoring are to be relocated to the operator's console and the recorder panel. The CRT and associated keyboard that were dedicated to radiation monitoring functions will be removed. The remaining devices will be shifted to the left, with no major revision in arrangement between systems. Changes within systems, to improve the functional grouping, will be made to satisfy the observations from the SFT A, the control room survey, and the operators. Also, the pressurizer functions will be moved to CP004 to provide added space on CP005. The auxiliary feedwater controls will be moved from CP001, 002 and 003 to CP006, and the PORV and MSIV controls will be relocated from CP007 to CP006 to provide the operator with the necessary controls in a functional arrangement better suited for control under stressful conditions. Post accident monitoring instruments will be integrated into the system layouts for more convenient usage. 2.2.3 Secondary Plant and Electrical Distribution (CP007 through 010) - Proposed Changes The proposed systems layout for panels CP007 through CP010 is illustrated in Figure 2.2-3. These panels have been completely constructed at the panel fabrication shop. E 2-6 [& 3.1/03163 u 9753P/0787P ~ a _ ._ _.

L l

   &        HOUSTON CONTROL ROOM
    %       f *""*                .                                                                                                 DESIGN REVIEW '
    $$ POWER CO.

The objective of Alternate 4 is to make minimum changes to them. The HVAC controls on CP009 will be relocated to a new panel out of the primary control area, as will the three multi point recorders. The PORV and MSIV controls will be grouped with the steam generator controls on CP-006, and generator breaker controls added, as indicated by the SFTA results and the operators. This. change eases operation during placing the turbine on-line. A full-flow deaerator will be added to CP008 as part of the identified design evolution changes. C [ ~ , L 1 I L r u a 1 I i 3.1/03163 l 9753P/0787P ( .. _ _ - _ _ _ _ _ _ _ - - _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ - _ - _

     ),l1jl[
             =o&Hoz                                                                                              OO2:             >
                                                                                                                                  =0Ot coz zo J)L     a a
     ! agm3 no, OmM% 2"        m5mE N     ?.

O l_ TI A LO NA A PLA Cs L ELM. __. s L LN Iy _' OO RIT a. W  % TC = .

                                              /\

o1gt i T6s a NN Ii n ' OU g8oAm CF =- i A i g gsA ge ,T Es AE E,LA i y w e - >

                                                                     =

T gre. sat w o o o Mu s o m s t a n c a 01 rs g m C. A e a a EC m a 0 g RA m n o "" o y r-g o u o P c,** e u w r C .'

                        .         s se                                       c                                          m'       s.

n m ""

                                                    \                                                                  a        o-m u

m- e. s^~ & 2\- u-a N x/ - a' s f ss a M Y A E P S gm

                    -                                                                        /                                     ..

L A w r, R

  • S d a aET

_ " n= E R ideL6 r EoPa t s - g U RftL a T w^ .

                            ~ N"                                    M                           Aa
  • A Ls# *4*
                                                                        =y T           T A           E 0 A g

Y m E D5F Ma6T I GL a A to 1 F TT ua oC . 6 N WTW . EENEAT C TW E L A a g r N Y T E F TirME4E Ne4 s sec Em.mcAAE AAAs Awtu mfTTiGs8u9M A aooo?mwuNtuw3

                                              / {

TtCCP t uEC 4 yx Oe e S 7 Js p . Q s 4 O a o C Y g v p D O- C g P _.  % E" g }g E n t e R C _ m N" ,e. g E _ 4 1 Ae T u E - m c N h'-

  • C C c

Nk, o/ M E n o T r. u e M e u e- _ b o . x t e u s m

                            %;e%/T a                         0                                    u t

c o. sa a 1 A g g u A A s s t%a o rt u ge . M 4 Lu e mg s nE1 5aAE6 wE . wos Et 6 t a1

  • u E E L E

gg at%D 0s s y# 7 r^1 oG TlmA4

                                               -a (.          S
                                                                          /

t 3 A4AaC4 9. o6 dn E w . 0 a . u 0 ELYT s . n u A m- O_ C P W A RC E G4T EE R1 E L TA L e a

                            -,/ .\

T C Eu Ld A/

                                                    /
                                                           'T.%

4 s. A v

                                                           'a A, 1

C EA tM sA/ 3 0 EE C P WCSE 0 ncLE 4 eM 4 CC . M i M - 9 MC2Oq O2)p DIgQpH82 3..g gpy3 W l g M s l {t I

um%r. ff HOUSTON

                    'G" 'NG CONTROL ROOM
         %,gg                                                                                             DESIGN REVIEW

~

         $lk POWER CO.
+

i o a l ?8!si 3 . 15 l Miq # 11

                                                                     ?!31113                                     4 1 1                                                                    s                                           sa    a 4!!!gn!'                   m!!!!et!m!       !! i!I
                                        ,i db+
                                   .                        3
s l ./
                                        <=

s 8

                                                            .        12                ml                        !

o i e e li y I T "\ F !i e 11 ji N/ UN I, ll l  : ns a e

                            -          /s\ 6D
  • s  ! i l \/ \/ u Qs . a iill  :
                            /\       /N6/\ .i                        lu,w.gil                                            !'

I VM

                                      /.~N 6. C,s i
                                                                   .lild!

s s

                                                                     '                                                    i l                          _

7v/h 'iD i ,

                            /*\               0/3\          J                                                             r I                                           V,\           !                                                             !
                               ./

3 W e

                                                     >      "2 t<
                                                                           =1 i
                                                                                                         <4 s
                                      /" \                           i$4                                 Il $

l /\ / n /\

                                           ~\1i/\ !9     "*

k by.5 i ;('! i

                                                                                                                    +4
                                                                                                                    +)

1 5 l \</ NxV /\= v w  :<! s

                                                                     !!I 9 es                              !!d!' [ip!
                            /\ f'N /'/'s                    j      njjilE!;agd3dal?,

B 5 l i Figure 2.2-2 FUNCTIONAL ALLOCATION 2-9

     .im   as s-m a  si       .i                                         _ _ _ _ . _ _ _ _ _ _ _ _

l houston CONTROL ROOM LIGHTING

     %                                                                                                                   DESIGN REVIEW hE51 POWER CD.

4 g .g;e 5 .: d3iIg z< s s

                                                                                                                                   $' f 85 50 d

Si 1} in-s 5! 3ll

                                                                            /              i lh!                                   !I !!
                                                                  ,              .          e       mi                             ii 9         -

I st  ! iv E !5$ I at I 5'  ! 5'  !$ li!)5 E~$ i

                                                                             }'

8 6 a

                                                                                                 ,6
                                                                                                                                            *   ]

d l- + h/ o \ 8 AA M['s i H 3!Td!$ '! K i

                                                                   @sb./
                                                                    -     w                                                                 l'  ).
                                                               !   97f(/'\                  i
                                                                      'f}J\                  f 3      si C

4 :O 3w  : e

                                                                          /    /                                              3              !
                                                                 /'g \/N/
                                                                   +                     t M    !!'                         7                 "

h' /\ 25 s  !! 1 l1

  • u 2 ;i d - 4, {dp 3 1
                                                                                                                              *5 u s

y S me-e I $c$ 0 U a.d la . s .:s __ i

                                                                                                ! f           h$              {fI b     f$       *
                                                                                           ,              3ns:       ,

l 2 [jl

                                                                                              $sen!$[5Hj!!                   kj!!!$lg si 8

ft 5 u e a 5 b 5 i 1 - Y L Figure 2.2 3 FUNCTIONAL ALLOCATION

                                                                                                                                                  ~

2-10 w

I l I $ HOUSTON lGHMG CONTROL ROOM g gggg y gg ygg y L M5 POWERCD. I l 2.3 ANNUNCIATORS AND PLANT COMPUTER I j The Annunciator Report identified 17 recommendations for upgrading the usability of the annunciator and computer alarm systems. These are detailed in Section 3.9. The l annunciator study is incomplete. Work is scheduled to resume after the control board layout is firmed up. The tasks remaining are: A. Prioritize the alarms in the annunciator and computer systems B. Complete the remaining checklist items that relate to hardware evaluation and final-layout 1 C. . Rearrange the individual alarm tiles. l I 2.4 OPERATOR'S/ SUPERVISOR'S CONSOLES E These consoles were not a part of the mock-up; however, a conceptual arrangement is presented on sheet 5 of SK-STP-JS006 (Figure 2.4-1). As envisioned, there should be two consoles, one for each of the two operators. The back of one of them will have adequate work space for the supervisor. Plant operations normally consist of steady state conditions with the unit at base load and all control systems in automatic. The operator should be seated at a desk supervising operations. Yet he must have direct access to the controls to take immediate action in case of an unexpected transient. The supervisory console is a means of combining computer interface and communications fimetions that are the nucleus of total plant supervision. The video functions on the supervisory console must coordinate the SPDS, Regulatory Guide 1.97 requirements, and the plant computer. About 20 parameters should be continuously displayed. These are: E A. Average Core Power Level B. Auctioneered Hot Leg Temperature C. Average Primary Coolant Temperature I 2-11 3.1/03163 9753P/0787P 5

r - 1 i pp houston CONTROL ROOM 4 LlGHTING g g ggg y gg ygg y _  ?!!9ESI POWER CO. D. Auctioneered Cold Leg Temperature E. Pressurizer Pressure and Level F. Steam Generator Steam Flow (4 each) G. Steam Generator Steam Water Level ( 4 each) H. Steam Generator Feedwater Flow (4 each) I. Turbine-Generator Megawatts The communications center for the plant should be the supervisory console, with a telephone to the dispatcher, en intercom to health physics, radwaste, emergency shutdown, support facilities, and guard stations. A sound powered phone system serves as s' backup. Alarms should be presented in a usable form, with prioritization to eliminate confusion. Fire detection, alarm, and system status should also be present here. I B I E B I I B I II 2-12 3.1/03163 5 5 9753P/0787P I.

l, ' li y 2 Do q%opgOOt Aar~OCNo (g o mgd=O Dm ===0E gT F I 5ME

  • y
             ! iOI$ O' t

L N ., c M%E OI I s pC T a a A s nEK C

                                \      \
                                                                                     }l
                                                                                      ./ '                                                 E
                                                                                                                                           )

nT LL O,osos

                                                                                               /
                                                                                                                 /

oA g m EL a. 8 PV E s NA 9 L 4( A L

                                                        ,                                                                                  E efE        %asao           PL.

1 s T a A. = s LNAEw ot n - LN- s

                                                           /
  • dA C (b nP J +ui T

oa c - OO, I g E E a RT-- TC. T u NN-LEr>mda2 a Et .

                                                    -
  • J i w
   .
  • S A
                                                                                                                                           .T Fc I15+9 a

7 CFge OU

                                                                                                                                                                                             -     w E
                                                                                           'J,.                              )

D - a . a a ' t us os s O m-j m ,

                                                 -'                                         4                                r T
                                                                                                                             < A                                         a ""

c i a a s -. a E v"" s' n i 9 m*" a 1V i 0 n 4 a =

                                                                                       \                                                                                m                          =
                                                                                                   ~
                                                                                     /

1 A ,'- _ s e . I I 1: . _T

                                                                                              \

b\  ;

                                                                                   }'

{'V 1 __~

                                           .            s,                           -                    3        ,
                                                -
  • s N ' .-
                                                                                             /                                                                                   ' _..
                                                                                                                                                                    . ~-

n *

                                                                       *T                                                       A                                   _ " -_ '-..  -

S A 1 E . T o D . i n m jE A s l i T u S . v. g _ v E d od a d pe a o 's e f  ! ( si A _ ie v J ma s a E ge t e

                                                                                                   ,                                                                           . o u.

d i g -, O . g ' eag mve s-l alg gs yo a _ . gc ;

                                           , .          3
                                                                                                          ,h_      3 l
                                                                                                                                                                                                 }

e N*gL nC O4

                                                           -               -   Z       > f"r h > 4 O 2           -

a a r, l iI :! i\ \ \. , l\  ;\\l l i 1  !

                                                                                                                        ,,                       j!l1         '         iI               llI               l ll l

I

$                         HOUSTON                                         CONTROL ROOM
 ?!!EEE! POWER CD.

LIGHTING DESIGN REVIEW l 2.5 ADDITION AL STUDIES I The MT authorized two additional special studies, hierarchial labeling and demarcation. The relationships between labels for individual components, sub-systems, systems, and groups of systems are stated in NUREG-0700 in terms of viewing distance and ratios 4, between classes of labels. A set of standard abbreviations for use on STP is given in the Criteria Report. The size of each class of label needs to be chosen, and character size, stroke width, separation, etc. determined. This study can'be performed-in parallel with control board layout, and is not a limiting factor in the panel delivery schedule. The present panel design uses demarcation on the ESF panels and on CP006 and uses mimics only on the electrical distribution panel. The Criteria Report identifies demarcation as a technique used to set apart groups of controls. Parameters such as size, color and quantity need to be selected and incorporated into the new design. 3 The functional allocation of control board space determines the relation between work stations. The location of systems within each work station, and of devices within each system is an ongoing effort. This design effort must integrate the functional requirements of a system, within the constraints of panel configuration (i.e. reach restraints of the vertical sections), and must incorporate the results of all the CRDR studies. These include both the SFTA results and the HEDs approved by the PRT. 1 26 SCHEDULE A project schedule for completion of the CRDR, panel design, fabrication, test, and delivery that is consistent with the STP construction schedule was developed as illustrated l J in Hgure 2.6-1. Construction requires approximately six months to complete, and is scheduled to start mid-July 1983, with main-frame design and construction preceding 1 J 9 2-14 3.1/03163 9753P/0787P J m

~ HOUSTON CONTROL ROOM

      \           UGHTING

~ m,- & DESIGN REVIEW y _  ?!!9El POWER CD. this date. The detailed layout revision has started and will finish in mid-June. The final layout will be assessed by the CRDR team to verify compliance with criteria, and to assure that no new problems have been introduced into the design. "'his evaluation, with the annunciator / computer tasks described in Section 3.8, the special studies described in Section 2.5, and a validation walk-through 'vith operations personnel, will complete the CRDR. The Executive Summary will document the results and summarize the overall I program, and will be issued in October 1983. I I I I I I I I I I I 2-15 3.1/03163 9753P/0787P

ll1

   )d cNC2
          @@C$dZc u $G$ no-h c

r a

                   )

OO yO&m0oE Dm O%:Dm5mM UL S E N A O M MP "W c 464 b e "EN Y / 7 S R Sn 4 F E L 8 I;E2, V N 9 L 1 E A n D P a J c 1:04 7m Si c e L D E N A P v o N 3 3 8 8 t / / c 0 0 O 3

                                                              /

is e 3

                                                                                                   /

9 r 9 e wC e tp e N-3 S O1 is o g T P N u R O O 4 I A P 4 T A E ^ is R a C I 3 P 3 R L 8 y lu A N TO/ N 0 2 3 8 1 2 O%5 8

                                                                                                                      /

B A s 01 F 3 8 J I F E M

                                                                       /

7 8

                                                                                        /

I

                                                                                                 ^7s      /

7 0/ 17 lN i o l1/6 9 1 e n Ci R 0 l G I S l s a Ml P u Nu P S A w S J OA T:lL 3iR

                                       &                          W                N e        T U

O S L y 5 N H C3O 3D V I A a

                              /

1 O /N 3 8 A T 3 8 2 T 0 L E M 1, 1

                                                              /WI 3        /

1 S D  %/ 0 2

                              /

4 3 5

                                       /

5 C/5 T u, L A G C085 6/

                        /              5                                           O     lNl                  N d

8 2 V 4 E I 1 / 1 f R R ( _ s 3 A p C 1s A I A R L W W N N Y 5 3 5 D E e NllR / R lD I h s O O A 0 1 A V l d I I N 1 1 a 3 c e T T / H O v I r A l 7 3 R o,' a t n ne C A C yh aC E N P r p , c/1 M e O O t P I lp ,, 1

                                                                                                                                    /

b p L E F 3 u e Lll R E 3 L s Pi , b e S E

                                /

4 R A L L A 3 5

                                                                                 /

2 P 0 3 3 8

                                                                                                                  /

2 &O L

                                /                                         L                                       /

F T O2 A A

                                                                                 /

2 H. E L P N 0 1 NO O 2 g C 0 3 I 3 3 3 M T T s CO/ 8 n 8 8 b"

                                                                                                                           +

O C / / / J a C

  • M u/

5 1 N 4

                                                                                 /

2

                                                                                         /

2 n 2 U 1 l f 1 F C de S o is T s y la < W E A n I V k s E a R T N e d c n G I n e a S E s ir on r e pit y D o t m c d u R E M c E nu t D O n a S N O l a F ngF r o G R R P n a a i e t m n t I S O o ia E L m a e wumrpe ts y it c n E S O r e a D A rg u R T o r e t r a ieH O s. v - - d i l a n n L E H C N P C R V A N R O A U C P P e e e nO2jOr oO m O2 U" A<5g >2O m nO%* h D g rEbmOh gmM n

                                                     -   3 y 9"
                                                         @*G                                                                                    m
                                                                            ,                                                   l         >   o

~

   $         HOUSTON lGHTING CONTROL ROOM
     %                                                                                                                        DESIGN REVIEW

, P!!5NE POWER CO. y 3.0 CRDR SUMM ARY 3.1 PROGRAM PLAN , i The CRDR effort started with the development and documentation of a Program Plan. This plan was presented to the NRC at Bechtel, Houston on October 5,1982 and the document was submitted to the NRC on October 20,1982. I The Program Plan presented a brief description of the objectives of the CRDR, a plant description, a definition of the control room, and a description of the control room design / fabrication status. Also, the plan presented a detailed list of the tasks that were to be completed in the CRDR. These were as follows: A. Preparation of control room design and review criteria which were to be 1 included in the Criteria Report. B. An operating experience review that includes a review ,of pertinent operating experience documents and an interview with control room operations personnel. l C. A systems function and task analysis (SFT A) of the control room complex during selected operational events. D. An inventory of controls, instrumentation, displays and other equipment on the control room man / machine interfaces. I E. A control room survey of the full scale mock-up (located in the Bechtel-Houston engineering offices) with regard to the human factors criteria presented in the Criteria Report (and in NUREG-0700). I I 3-1 3.1/03163 9754P/0787P

l HOUSTON CONTROL ROOM LIGHTING gggggy ggyggy _ _ _$ OWER CO. F. A verification of the availability of instruments and equipment needed to ] implement the tasks identified in the SFT A. " G. A validation of whether the control room operating crew can perform allocated functions within defined procedures using walk-through/ talk-through techniques on the mock-up. II. A design review of the alarms of the main plant annunciator, plant computer and ESF bypass and inoperable status system.

                                                                                                                                ]

An overview of the relationship of the above tasks (from NUREG-0700) is shown in Figure 3.1-1.

                                                                                                                                 ]
                                                                                                                                 ]
                                                                                                                                  ]
                                                                                                                                  ]
                                                                                                                                  ]
                                                                                                                                  ]

J

                                                                                                                                  )

3.1/03163 0754P/0787P ,

L D5 HOUSTON CONTROL ROOM Q LIGHTING DESIGN REVIEW

  -  o,m.,
       .m   &
    .PMJE9 POWER CD.

I i !s-It ' i jjii [ e!! si [i! !!il !II3 l t  : .3  :

:=!

i:  !;: ij Ein  !- ij j *!j.I- -!!

                                        !s:=il I                                  .

4 m

                                                                              .-    it.-- !

4 I .n n t Es 1 ii-sis l..  !! g-

                                                                                                                                              !!!i!
                                                                     ! gi                        ,g                           .i              ::::: .[:a I!:I
                                                                                                 !!l         l                                         1 I                                                                      s t                      a-
                                                                                                       $.3ll 8

I!*,

                                                                                                                                                     ,E Ik!

lci ii u_ i!!!  !!!! I ., .

sin f i
                                 -y 1                                          I i         i                                                             i ja                                        I   .!

1  :

                                     . ::                                        . .i l
                                                                                      -            . i.    .

a =  !;

                                                                                                                                                  !! II!
                                                                                                 ![!!N i                                                                               3 i ! !:
                                 ;i li!

ass a , I i I I I. Is sr I1I i 1 at "i 3 I

5. :

31,i 3 y .

                                                                                                       =                                          sa.:

I i E! E!g s!I f 6 I 8 l B  !! si,s l

                           *lI                                       ill l               I
                  !3, -

g-i!! :I!r' 5: 15,1

1 i I
                             !si III
                           .a s .,

OVERVIEW OF CRDR PROCESSES Figure 3.1 1 3-3

HOUSTDN CONTROL. ROOM lfhgl f *""* DESIGN REVIEW

       ?!!O!N POWER CD.

3.2 MOCK-U P To aid in the CRDR, a full scale mock-up of the SI'P control room was fabricated in the Bechtel-Ilouston engineering offices. Figure 3.2-1 is a photo of the mock-up. It consists of fullscale models of control panels 001 through 010. All the panel controls and displays are shown on the panel faces using reproductions of the equipment. All devices are shown in their proppr locations and nameplates, labels, lines of demarcation, mimies, etc. are represented. The mcek-up was used in nearly all phases of the CRDR. In the control room survey most of the observations relating to visual displays, labels and location aids, panel layout, and control-display integration were obtained from a review of the mock-up. In the SFT A the functional and task related grouping of devices was evaluated on the mock-up. And in the operator experience review the interviews and questionnaires were based on walk-throughs of the startup Selected Operating Event (SOE) performed on the mock-up. 1 Certain human factors criteria could not be evaluated on the mock-up, such as communications, process computers and some of the control room workspace items. liardware related criteria could not be evaluated on the mock-up. Most of these criteria were reviewed at the simulator (Figure 3.2-2) or computer facilities (Figure 3.2-3). A small number of criteria, such as sound level and control room illumination, will be reviewed at the plant when the control room is completed. The mock-up will be used extensively in the panel redesign effort. All the control device reproductions on the mock-up are mounted on 1/8-inch acrylle backing plates to allow easy removal and relocation. Preliminary layouts of the control panels will be performed on the mock-up by rearranging the mock-up devices. As the redesign effort progresses the device layout on the mock-up Jan be easily revised to reflect the latest design. Eventually the equipment arrangement on the mock-up will be completely updated to show the final layout of all ten control panels. This version of the mock-up will then be used for the final CRDR. I 3-4 3.1/03163 0754P/0787P

U r.1

                                                                                                                   ~
                                                                                                                                                               .ssvr                                                                          ,

1

                                                                                                                                                                                                                                                             } I (i                                 4 j ae > s

- .s. j b '?. 4 Ej ii

                                                                                                                                                                                                                                                             !.l '. [                            N

= . . , y w. + w

                                                                                                                                                     .                  ,w
                                                                                                                                                                                 > ,. , ,.             , ; ,. -                                                                                 \

i- - . , *.c. , ,. 1 4.,

  • Ti '

3)*' [.$ [ ',

                                                                                                                  *~
                                                                                                            ; f-                                          '$(                 "ag,
 ]                                                 ' [                    -/ f , :',fb                             .

C m ,m' 9** 3, "y

                                                                                                                                                                                                                                                                           ,M*
                                                                                                                                                                                                         'i'[Q                                                  f i, (                                                  ;

c r l\[, j Q}ym h Q

                                                  ,                   y                 uot                                           ,
                                                                                                                                                           ;, y:
                                                                                                                                                                              .*~,y, ijl                hfj                  'qjM y
                                                             ;        f r                  hd[4 y                                                                     M' '
pa-
                                                                                                                                                                                                                                                               ;~

7

                                                                                                                                                                                                 ,;          Dn                                                                                                         =

i a , ,

                                         .s            , :\ /                                  Qr                      i

t . itI , Q* 'ef , :i c - p 5

                                        ._f r.                                        I
                                                                                                <[                                                           aM. . E ' i,d 8,, * ?_e.

b, j ,

                                                                          'y                                                                                 .           .

y [ c

                                           ,~ N
                                                                                   .           ,j gf q zxgy p ,

a,i \a ' , 8 3 g, [ q s I t [ j[ g-; ,s , ;3 co

                                                  ,         3< a *                                                          -    -
s. .. .

[q, / $

                                                         ,[ 8                                       3I                     .

xxx; s ,sf g - h([ ' ' f-.'*g( 1p , q' -

                                                                                                                                                               %y
                                                                - 2                                                                                                                                                                                4 m           3 .                                                                                             -

(v w;.<f::  ;;, .u c

                                                            ,:                          na p.
                                                                                                                                                                    -nQmO4s                                                       )3         .
                                                                                                                                                                                                                                                                                                            \ u m

kffQp;. ~-mA vi f.. , '-

                                                                                                                                                                  - O ,., ,.                        w                                                                                                            8,
                                                    .                                    ~

p[. fl - d'!j hp h ' [,, 3 .-

-                          =_                                                                                                                                   .. r.n8       a- ;                                                     -                                                                         on
                          ,s                                                                                                                                   .:                                   ,                                 ,,.                                                                   i on mg y .                                                         . , . . .
                                                                                                                                                                                                                                                                                                            +

cc e b^i ,,f ' ^ h***7E "'O T: C C C c = g ;_ m '5 w~~~ _.

                                                                                                                                                                                               '_[
                                                                                                                                                                                                                      ,~7
                                                                                                                                                                                                                  --~-----...-~7..'-                                                                             -I O  ,(.

j

                                                                                                                                                                                                                                                              ~

g..

                                                                                                     ,                                                        . . . ,               ---                        -.         .           l.

3 2

.% {!
                                                                                                                                                                                                                                                                                                            ;    o g.y M                                                                                                 a.
                                                                                                                                                                                                                                                                                          . e '. .'l Nu          ,a_.
                        , . - 4":                                                          ,                    .

l ". ? s"- [- . I h . i

                                                                                                                                                                    ""'""'*Q                    JPg                  vr                                                    3        J y                                                                     J.                                i;                                     s                          2 2                                                                               >

a, -

                                                                                                                                                                                        , It..   ;,g . ,                                                             # ,

k [J ' I i 4

                                                                                                                                                                            .'E
                      ; ' "2                                                                      .                                            ,

z.4, , ,t

                                                                                                                                                                                                                                                                                                         -j
                                                                                                                                                                                                                                                                        +                             5 Q                                                 f
                                                                                             ; .i . , .
                                                                                        } } ;, >                                                                                 lg.*,*pi; l.

vju a i I i  ; t . a c..

                                                                     , . . f . -L U g                                          ,

c* " k D> 6:S$,fi -

                                              ?!                     ey; < c.j              .' , .

J (5, g'-,Aj!

                                                                                                                                                                                      .. . . s
                                                                                                                                                                                                                                    .                            . ;',           '- g. ,           ,
 ;                                                                $ " ,;                       -' v -                                              I            'nm                                                                                                   +

f; . hs t- ' D$n

                                                                                        ~'1,:                                                                       gZK3,.                                                                                 ,

p; $s D}; [.[l . . h . . ',h g

 =

y  ; y t ll ~ CE3 t; r _q , {i. s .: h-r }

                                                                                                                                                                                                                                                       , , 7 i'                                         ')
                           ' w + . ', a 4

z ,,

                                                                                                                        <.)
                                                                 ;                                           u                                                                                e._ 4 <                                                                  V Q. -

f '[. = 'i ; ,,.

                   ,. .                 }                            - ::                                                                                      3I                                                              .
                                                                                                                      ,t g g7 y                   6,1 ,                                                                                                                                                         .
  =                        ',                                        :)                              ,
                                                                                                                       .+)1                                       -

_ I, ! y

                                                                               ;                                                                                                    ^
                                                                                                                                                                                               >      .1 1                                                               .

f

                                                                                   ,                                   ,:.                          ~                                          ;                          -

m -

                      . .y x .?. ; ~j
- .L k .:Ls 3-5 E
  =                                                                                                                                                                                                                          .

F

                                                                                                                                                                                                                                                                                                                                                                          =

W '.#'""*" S A T ~- '-'~

                                                                                                                                                                                                            '$                                                                                                                                                                        #~

Q .Q A .

                                                                                                                                                                            ,                                     }                                                                                     r                                                                 5 o           .

N 4 [, k s. 5

                                                                                                                                                            ,.                                                                                      a              ,
                               .+
                                    -\-                                         _ . .
                                                                                -                     ,                                                                                                                .                                                                            (                                                                     d
                                                                                                                                                          ,k vi
                                                                                                                                             ~

Q. I ' v ,'- J  % om

                                                                                                                                                                                                                                                                                                    =

xh g )g Qm, ' c t 1. e  ;-: _y-7 [ =

                                                                                                                                                                 -                                                                                                    ..                                                                     t
, i m* -

_f~ q- ., t- - A: _ , , %g g e ,s'*n + 0

.w                                                     -;                                                                              ;;-                          f5                   -

r

  %y
  • _ 'h  % .%
                                                                                                                                                                                                                                                                      .[ ~                                                                                                  M

[

                                                         ' ,g

_ g# -. N - E 8"% 4 [ #"% .g ,

                                              ..                  (-',                                           .

M ._., 1 ,

                                                                                                                                                                                                                         ~

y s. : I

               ...                                                k                             >%E pg
                                                                                                                                                                                                                                 -h'eg                     .r
                                                                                  ,'               m l

s -y s

                                                                                                 , .s .                                                 # .
                                                                                                                                                                            . .f . s.    . .;,
                                                                                                                                                                                                  . l4                                                                                                                                                                     R.
                                   ,m e
                                                                   -b   4%                                .                              ' ag-                   -
                                                                                                                                                                           .--m 1            .,   -

i m , . . . t - No .cvs 4 -d' "'$Y 3SM.' -'p-i k. b

                                                                                                                                                                                                                                                                                                                                   \                                        E Tlt i . _,
                                                                                                                              ?.,                              -

qip;. ;Qll f. a J x

                                     #".'               , afy          'dr { i { ' .,
                                                                       \% : 1, .

g

                                                                                                                                            ',            y.N4['              ..
q%;4. "

(g.,,... j, f I I

                                                                                                                                                                                                                                                           -,5'N'                         ' . 
                                                                                                                                                                                                                                                                                            ~*--                             ,'

g\\g e - y y :r - ,, q C, **mic ;r -..x l.L v;g . 3 *W S W%s W _y' = g p, . w ~.e.g y ;;N,,3 3 , y: , f, ;

                                                                                                                                                                        . 7M l ,.2
                                                                                                                                                                                                                                                           .. W ; > ,                          ~
                                                                                                                                                                                                                                                                                                                        .::\
y. .
                             .'ess     .
                                                    .- %                                                                                                              .;.9            -we                                                                 v p. n :; ,                                                        .    ,

I-

                                                                                                                                                                         .k > \                                                                                                    h                                                              \                E g{'[ sg

[ p , ;, . -2  :& Q., . >,j A

                                                                                                                                                                                                                                     ' g#.;                                    -w:;pg                                 sp                            '

g es, = (m o -

                                      **                  -O                                                                                                                                                                                                                                                                                                       -J frj
                                                                                                                                                                                                                                                                                                                                               \
M
                                                                                                                                                                                                                                                   - k.

p %q .. s q w.O. .

y. xm A
                                                                                                                                                                                                    .o gy y

0 llE g g{ ** .' 71 ;d -* mjag'

                                                                                                                                                                                                                                                                                           ' Y             J                                                       5 .T m                                                                                                                                                                                                                                                                                                                                             4 sm                                                                                                                                                                                       y-                                                          e f A Yg l                                           .
                                                                                                                                                                                                                                                                                        \            ;                                       ~$
q. & men as 5
m. _ # q' s.
                                                                                                ; [, , , ,. ;

{.- Y

       *'                                                                                '4  '
                                                                                                                                             .[                                                                                                                                                                h                  '.-
        -r Vi,[j_7-
                                                                                     . -o j; :. k 9:                                                                                                                                                                                                        1 _

i' \ _-- J. .e , %_ ! _

                                                                                    . ';f:y';l (:'*.-/Qi; _ik&yk;~y"                                                                                                       kin 3.

M N'

                                                                            ~ 6 f: 46 y

[ -

{ * .

f .

                                                              .w    fW AJM~C:::QW
                                                                                                                                                                     ' . & S 6, , -

m ..

~ :: . 4. ,y - m,*n. ..-~
                                                                     ; 3+.1 Q -f,; . .,(S r. ;
                                                                                                                                                                                                                                                                             ^
                                                                          ;            %.       , '                                                                                                                                                          ~'
                                                                                                                                                                                                                                                                            - Q ~' .                       r ,                               . "                             -
                                                                                                                                                                                                                                                                                          ?. ., 9 ' f$kh,
                                                                         ; ;;;a ' .,                                                                                                                            >          r;:.                                , -K '

Q. y ^:Ya: qa-d o. y, - il$h%.  % . _ ;;- Y & ~  ! :l '

                                                                                                                                                                                                                                                                                                                                                                            ~

e n AlL i % r_rk m= *4 rew% h;% 'u. $ *-4 y . # ,6 . , s 7m w . 2-m . ,

                                                                                                                                                                                                                                                                       * -1                                                                 -M         y e.A.
                                                                                                                                                                                                                                                                                                                                                            '~

r,b; .$ %Q &'A.16'-'. - g( I~ 4; C! * .* A J/ ,O %d lc 1 Dhht g j

                                                                                                                                                                                                                                                                      -h                ,     .     [       q m@F:                                     h ,by2 M 7[h ,W n                                                                          n.: nn-                           .

I[di%ans ~ ' RRn.m[ ,x; x&;.~Q; w w . m y k.v$ [?m m::x

                                                                                                                                                                                                                                                                                .       ,,c
                                                                                                                                                                                                                                                                                                        , , z :.

v . ,: r en

                                                                                                                                                                                                                                                                                                     )Qc,.%lg.q                                   .j;{V[7Q w                           s             ,

m w amna e w A. . .*-

n $d h{f} r : -h[u T1YU2'M i
\                                                                                                 -
                                                                                                                                                                                                                                                                                                  ~           c      : .

b d ge* h; yM

                                                                                                                                                                                                                                                                                                            ,s A                        .

w y'., {. .v/ % ll - .N .

g. y ., ,
           ..p -                                                                                         >-
..                                 a                                >

3-6

p!! B i  : 1 j- ;y 7

                                                                                              ~ " '~ WL .):g;, _                                          .                    -.
                                                                                                                          ,                             ~ _. c                                          v; 3 I-~    .
                                                                                .                      u 2
                                               ~,
                                                                             -G                                                                                                                       ,

L e

                                                                                                                                                                                                                 #n m.m n                                          nm
:s .
                                                                                           +                                                                      '; i.'               l 0 .2
                                                                                                                                                                              ,- ; .                             y
                                                                                                                                                                                                                 =

m g . . - m

     - sy.u.a-
                                                                                                                                                        ~

r

                                                                                                                                                                                                , , ;.w g                                     .       p Jg..

_ .=- . g5. . , , ---- , s

   -= -s.a g
                                                                           .         ..   .,                                                                                                 c.               >
l. .. '~

gg? .' ~

                                                                                                                             ~
                                                                                                                                                       ; i , ..,,                            .

a 44 , ,

   ...,.:                ,       :                .               :\
                                                                                     ',,~i9.::.~2 **D3~* C . ~ ~ qD'-
                                                                                                                                    .,              e y   ._

cL 4

                                                                                                                     ~ '               '
  • _ i f
                                                                                                                 ~r*-                                            19ev
                                                                                                                                                                   ~
     ,' -          , , .                                                                              i          ,  ^~.         ,                                          r ' **
    $               h                                                         {.

ddf) 11h\ _ Y-: 3-7

  ,          HOUSTON                                                                                 CONTROL ROOM l

{ ( LIGHTING NN POWER CD. DESIGN REVIEW 3.3 CRITERIA REPORT The Criteria Report was established to accomplish the following: A. Provide the CRDR team with a basis for reviewing the control room. The i criteria include the human factors guidelines specified in NUREG 0700, with minor modifications to account for plant specific features applicable to the STP. B. Provide project personnel with a document that would integrate the plant systems and promote a unified and coordinated design with regard to the control room interface. The Criteria Report is divided into two major parts. The first part, or the main body, contains criteria relevant to the control room design. The second part contains the human factors guidelines relevant to the various design criteria as well as appendices. The main body describes the functions of the control room, the systems controlled from g the control room, and the control room layout features. In addition, it defines design E criteria for the following topics: A. Main control panels I B. Human factors C. Communications D. Control room annunciation E. Post-accident monitoring F. Bypassed and inoperable status G. Safety parameter display H. Plant computer The appendices describe the human factors guidelines appropriate to the topics covered in E the main body of the document. l 3.1/03163 9754P/0787P g W

HOUSTON -

 *f      .

LIGHTING CONTROL ROOM gggggy ggyjgy { !. NE POWER CO. The initial draft of the report was prepared and submitted to the PRT early in the CRDR program. The document was reviewed by the PRT and comments were resolved. The document was submitted to the MRT January 20, 1983. The MRT comments were { incorporated, and Rev. O of the document was formally issued February 4,1983. 3.4 CONTROL ROOM INVENTORY An inventory of the controls, instruments, displays, and other equipment on the control room panels was performed. The results served as a reference data base to verify that all the devices were properly represented on the control room mockup. In addition, the [ inventory provided a means to verify that all of the devices required by the SFTA (for those emergency e~ vents analyzed) were available in the control room. m L The inventory consists of a computer listing that identifies all the devices on the control panels. The listing contains a unique component identification code, the panel number u where installed, the nameplate engraving, and certain characteristics appropriate for the component. The inventory must be updated because several additions are required to meet the post-accident monitoring requirements defined in Reg. Guide 1.97. In addition, a l number of additions have been identified by Bechtel engineering design disciplines. These inventory changes are undergoing a design review. - 3.5 OPERATING EXPERIENCE REVIEW u The main purpose of the operating experience review (OER) was to identify human factors i related concerns of the control room operations personnel. A second purpose was to identify problems associated with systems operability on those systems controlled from the control room. The latter information has been included with the SFT A and the control room survey as part of an overall and comprehensive CRDR effort. F k b r 3-9 l 3.1/03163 9754 P/0787P

I I

 &        HOUSTON                .                                       CONTROL ROOM LIGHTING DESIGN REVIEW P!!9KI POWER CO.
  • Questionnaires and interview sheets were prepared considering the special knowledge and experience level of the operations personnel interviewed. The questionnaires were structured to secure basic information and to help prepare the operations personnel for interviews with the human factors consultants. Eleven operations personnel participated in the questionnaires and interviews; five were classified as senior reactor operators and six as reactor operators. One of the eleven participants was classified as the Reactor Operations Superintendent.

Applicable guidelines contained in NUREG 0700 were used to structure the questionnaire and interviews. The content of the questionnaire fellinto seven areas as follows: I. A. Workspace B. Controls C. Displays D. Annunciators E. Labels / Location Aids F. Process Computers G. Panet Layout / Integration The questionnaires were prepared and reviewed by T17I' prior to the interviews. The interviews were held at the STP control room mock-up following a period of mock-up familiarization. The OER results were evaluated and a report was submitted to the PRT January 14, 1983. This report is included in the transmittal covering this phase of the CRDR. g g 3-10 1 1 3.1/03163 9754 P/0787P R

    &       HOUSTON                                                        CONTROL ROOM LIGHTING g gggg y gg yjg y
     ?1059 POWER CD.

I In the OER the control room operators expressed considerable concern over the human factors aspects of the control room layout. Concerns were expressed in all seven on the I content areas noted above (workspace, controls, displays, etc.). The operator's concerns are discussed in the OER report. These concerns were reviewed to confirm that they were covered by the control room survey. Thus, the CRDR observations discussed in Section 3.9 are reinforced by the OER results. 3.6 SYSTEM FUNCTION ANDTASK ANALYSIS The system function and task analysis (SFrA) represented a major effort within the overall CRDR program. The method of analysis and results of the analysis are described fully in the SFTA report. A summary of this work is presented below. I The SFTA was performed using the methodology described in NUREG 0700. The main elements of the analysis are: A. Develop system background information according to the following:

1. Participate in a series of informal discussions in which the function and operation of the major systems and subsystems were described.

Participants were the SFT A team members, Bechtel engineers from the various disciplines, and a Westinghouse representative. I

2. Review STP plant documents such as the FSAR and the Westinghouse
                        " Plant Information Package."

l

3. Prepare system background data sheets which include system l descriptions and schematic process flow diagrams.

S l l 3-11 3.1/03163 9754P/0787P 1 - - _ - -

I pp HOUSTON CONTROL ROOM LIGHTING gggggy ggyjgy MEl POWER CD. B. Select the operating events to be analyzed. This was accomplished by reviewing the emergency events given in the FSAR and selecting a number g of events that encompass a broad use of the controls and operator task u sequences. Six events were selected: '

1. Normal startup from cold shutdown
  • I
2. Small break LOC A
3. Steamline break inside containment (loss of secondary coolant) ,
4. Steam generator tube rupture
5. Loss of all AC power
6. Turbine load rejection I

C. Perform a SFTA for each selected operating event (SOE). This was accomplbhed by using the Westinghouse Owners Group " Emergency Response Guidelines" (ERGS) to the extent of their applicability to the SI'P plant. The basic analysis consisted of the following:

1. Prepare a functional sequence response for the event.
2. Expand the functional sequence into a list of specific operator tasks.
3. Prepare an operator decision - action diagram.
4. Summarize the results of the operator tasks in the form of illustrations which show the control room traffic from panel to panel and the operator activity sequence on each panel.
5. Evaluate the results from the viewpoint of the CRDR criteria document.

l 3-12 3.1/03163 9754P/0787P

                                                                                      ~

c.

  .$        HOUSTON t.lGHTING CONTROL ROOM
    %                                                                     DESIGN REVIEW
    $$ POWER CO.

l { The SFTA was completed and the report was submitted to the PRT February 8,1983. This report is part of the CRDR package transmitted to the NRC in preparation for an April 1983 NRC Review. Numerous observations were made as a result of the SFTA. Those are discussed in Section ( 3.9. j { 3.7 CONTROL ROOM SURVEY The control room survey represents the first level identification of potential human engineering discrepancies (HEDs). The human factors criteria presented in the Criteria Report were applied in the preparation of specific checklists, one set of checklists b corresponding to each topic listed below, and a single checklist item for each human factors criterion. The checklist topics are: b A. Control room workspace B. Communications C. Annunciator warning system D. Controls L E. Visual displays F. Labels and location aids G. Process computers II. Panel layout ~ I. Control-display integration i The control room survey consists of a review of each control panel for compliance with each checklist criterion. The review was performed using the full size mock-up of the STP control room at the Bechtel engineering office, the computer located at the Westinghouse offices in Pittsbugh and the simulator located at the Gould plant in Long Island. 3-13 l 3.1/03163 9754P/0787P

1 f$ HOUSTON CONTROL ROOM l UGHTING DESIGN REVIEW n

  ?!O!K! POWER CO.

Each criterion was reviewed. If compliance was not met, an " observation" was noted and all the devices not in compliance were listed on the checklist. The number of criteria for the nine checklists is approximately 600. Since there are 10 control panels to be analyzed, approximately 6000 determinations were made. A computer program was developed with Bechtel to compile and catalog all of the information developed on the checklists. The control room survey is almost complete, except for certain checklist criteria such as noise, illumination, and communication which will be performed after the control room is put into operation. The report on this task is scheduled to be issued in July 1983. The progress for each checklist, as of April 11,1983, is indicated below: E A. Workspace checklist - 100% complete B. Communication - 100% will be determined on the final control room C. Annunciator Warning System - 100% complete D. Controls checklist - 100% complete E. Visual Displays - 100% complete F. Labels and Location aids - 100% complete G. Process Computers- 100% complete

            !!.          Panel Layout - 100% complete I.            Control-display integration- 100% complete The results from the survey completed thus far have produced a large number of observations. These observations which include recommendations by the Design Review Team, are being reviewed by the PRT. They will recommen 1 dispositions based on the material in the Program Plan. Many of the observations are readily correctable, e.g.,

standardizing switch functions, labels and meter faces, or relocating a particular device to a new location. Ilowever, a significant number of observations relate to grouping devices by system, function, or task sequence, which affects the panel layout. These observations have broader consequences and result in relocating large numbers of devices. 3-14 3.1/03163 9754P/0787P

L F G f . houston CONTROL ROOM y L1GHTING DESIGN REVIEW N$ POWER CD. Specific results and recommendations are given in Section 3.9. 3.8 ANNUNCIATOR Sr UDY The purpose of the annunciator study was to perform a design review of the main plant l annunciator, the plant computer alarm functions, and the ESF bypass and inoperable status system. In addition, the objective was to integrate these systems into a cohesive an.mnciation system considering human factors principles. I The review consisted of the following: A. Review the available results of annunciator studies performed by the NRC and EPRL B. Develop criteria for the annunciator review, including prioritization and categorization of annunciator displays. C. Prepare annunciator review checklists. I D. Perform an evaluation of the STP annenciator design based on the review criteria, and compile the observations and recommendations. The annunciator study was not completed because the annunciator system design is not ' finalized. The development of criteria for the annunciator review was completed and checklists were prepared and completed on the original design. The design evaluation I phase was initiated but a large fraction of the effort remains to be done. The remaining tasks are: A. Review the latest annunciator and computer I/O lists. D. Develop annunciator window assignments. C. Prioritize the annunciator list. I I ll 3.1/03163 3.is 9754P/0787P l

                                                                          ^
 'pp         HOUSTON CONTROL ROOM           l LIGHT lNG                                                      g g ggg y g g ygg y    g

_  ?!9!KI POWER CO. - The significant results of the annunciator study thus far are discussed in Section 3.9. 3.9 CRDR OBSERVATIONS ~ Although the CRDR is not yet completed several observations of potential llEDs were obtained from the initial review. The following sections discuss the observations from the major CRDR analyses. 3.9.1 SFT A Observations An SFT A was performed for the following six operational events: A. Small break loss of coolant accident (LOCA) . I B. Steam line break C. Steam generator tube rupture D. Loss of offsite power (LOSP) E. Plant startup F. Turbine load rejection This analysis included a functional review, a traffic flow analysis, and an operational sequence analysis of each event for ten control panels in the control room. These events were selected on the basis of criteria that provided a good cross section of operator actions for expected normal and emergency plant operating events. The SFTA was based on human factor principles which specify that controls and displays should be placed within the control room at locations which promote efficient procedures, E safe operation, and maximum operator awareness of the current system condition. There are three general priticiples that were considered in the arrangement of components: l A. crouping by task sequence g u 3-16 - 3.1/03163 - 9754P/0787P _w

      $       HOUSTON LIGHTING CONTROL ROOM gggggy ggyjgy 1

MP!CI POWER CO. B. Gmuping by system function C. Grouping by importance and frequency of use. Gmuping by tasks sequence is, from a human factors point of view, the first priority in any arrangement. Grouping by system function is considered second priority but ranks very high in importance. The SFTA shows that the arrangement of devices on the control panels for tasks identified  ! in the SFTA cause difficulty in performing the task and are not consistent from one system to another. The SFTA was developed from the Westinghouse Emergency Response Guidelines (ERG) which are symptom oriented. Based on these guidelines the operator must traverse from CP001, to CP002, to CP003, to CP00126 times during the small break LOCA. The traineriented layout of the ESF panels is the major factor in the large amount of operator travelalong the ESF panels. Ibliowing are some other SFTA observations: A. I During the turbine synchronization task the operator makes 13 trips between panels CP007 and 010. These panels are approximately 20 feet apart. B. The diesel-generator controls and lights are located on 3 panels spanning 30 feet. During a loss of offsite power and other events, these devices must be checked for successful start and sequencing. C. The three high-head, and three low-head, safety injection pumps contmis I are located on three panels spanning 30 feet. During the recovery operations from an event the contmls must be attended to. D. In the recovery operation for certain events, reset controls for each system must be attended to. These devices are located on panels that span 30 feet. l I - 1 E 3-17 l 3.1/03163 0754P/0787P

I HOUSTON CONTROL ROOM l LIGHTING -

                                                                  .          DESIGN REVIEW          m m,. .
    .. ._ECI POWER CO.

E. In the event of a steam generator tube rupture, the operator is required to

                      " dump steam to maintain stable temperatures." The control for dumping steam is 20 feet away from the required temperature indicator.

F. In order to determine if reactor coolant system pressure is proper for shutting off the three low-head safety injection p, umps, two operators must communicate across the width of the control room. G. g The following are system-to-system preferable layouts considerations as g related to NUllEG 0700 guidelines:

  • Panel CP007 (turbine generator) and panel CP010 (electrical I

auxiliary power) should be located adjacent to each other and, if possible, panels 006 (steam generator) and CP007 should remain adjacent. Panels CPL 01,002 and 003 (ESP) should be organized by systems to avoid many trips back and forth. Some consideration should be given to integrating functions on panels CP004 (CVCS) and 006. Startup shows 19 trips back and forth between these two panels. A survey of six systems indicates that all controls required for each system are spread over several panels. For example, an operator must travel approximately 48 feet to address all the controls in the safety injection system, and 72 feet for the auxiliary feedwater system. 3.9.2 Control floom Survey Observations The control room survey is not yet complete. Ilowever, there are a large number of i observations that have been made thus far. These observations are being reviewed by the g g PILT for dimosition. In addition to the observations derived from the SFTA, which are integrated with the control room survey checklists, the following types of observations were noted. 3-18 3.1/03163 9754P/0787P

                                                                                                       ~

~ F L

   &         HOUSTON                                                                     CONTROL ROOM LIGHT 1NG DESIGN REVIEW P!!9!KI POWER CO.

[ A. A large number of observations were noted due to lack of a consistent application of switch type vs function throughout the control room. Two hundred and forty six out of a total of 849 controls (about 29%) do not g comply with established guidelines. Of this total the most significant E contributors were cases where SBM switches (139 cases) and CR-2940 switches (51 cases) should have been used. B. A number of observations concerning labels will require total relabeling of the control panels. A labeling specification will be written to incorporate pertinent human factors criteria. I Sample problems found with labels are:

1. Character height too small
2. Non-standart! abbreviation or inconsistent use of abbreviations
3. Inconsistent engraving on simulator labels.

C. Many observations concerning the meter face scales will require I adjustments or replacement of meter faces. Sample problems found are:

1. Too many graduations between numerals
2. Graduation marks too short or narrow making the different size I 3.

graduations hard to distinguish Numerical progressions do not conform to criteria for progressing by l's, 2's, S's, or 10's or multiples of 10

4. Zone markings are not provided to indicate operating ranges.

D. Many related controls and display are not co-located. I E. Arrangements of similar equipment are not the same from panel-to-panel on the ESF panels. I 3-10 g 3.1/03163 g 9754P/0787P

I HOUSTON CONTROL ROOM LIGHTING DESIGN REVIEW

 . _ ___    POWE R CO.

F. No lamp test, dual-filament bulbs, or dual bulbs are provided for indicator lights associated with switches. G. Legend lights on the status light boxes on CP001, 002, 003 and 005 are very hard to read. Legends contain too many words, lines of text and the engraving is too narrow.

11. Many systems are not functionally grouped. Due to the train separations, many systems are spread across many panels.

i I. Controls on the vertical section af the control boards are hard to reach / access by small people. J. No enhancement or demarcation techniques are evident on panels CP004, 005 and CP007 through 009. 3.9.2.1 Anthropometry Study The anthropometry study discusses a number of observations related to the location of controls and displays. Some of these are outlined below: A. TS o hundred controls located above the lower panel surface do not accommodate 5-20th percentile operators using extended functional reach dimensions developed in the anthropometry study. These 200 controls are out of reach of 90% of the females and 30% of the males using functional reach dimensions in NUREG-0700. B. The removal of the guard rail will decrease the number of out-of-reach components but then 49 controls will violate the criteria for maintaining a 3 inch clearance from the edge of the board. u M 3-20 "

                                                                                                ~

3.1/03163 9754P/0787P -

                                                                                                                                                     \
      .       HOUSTON                                                                                                    CONTROL ROOM                l LIGHTING a

gggggy ggyggy

  ' L ___KI   POWER CO.
!              C. Thirty-four strip charts located on the vertical panels of CP004, CP005, CP006 and CP007 will be very difficult to reach and observe by smaller I                   operators. Operators could inadvertently activate components while leaning and stretching across these major control board surfaces.

D. The operators could accidentally actuate the computer keyboards on the control panels while leaning across CP005 and CP007 to manually access the strip charts. The distances of the three computer keyboards from the edge of the control panels are not standard. Inadvertent actuation of keys I would be more likely on some keyboards. 39.3 Annunciator Review An initial review of the main annunciator window boxes indicated the need for resizing window boxes, and organizing tiles considering system orientation. The following observations were noted: A. ' lites per window box shall not exceed 50 (NUREG 0700): Most window boxes have room for 96 tiles. Most of these have 80 or more engraved tiles in place. l B. Inconsistency Qocation): RWST EMPTY tile is on top row, column 6 on CP003 and located at bottom row, column 10 on CP001 and CP002. l C. Repetitions: (above example) the RWST EMPTY tile is located on all three ESF panels. D. Too smalh The annunciators are half-size 0.e., about 3" x l-1/ 2") and this l results in difficulty in reading from some of the annunciator control positions. I l 3-21 3.1/03163 9754P/0787P e .

HOUSTON ~ CONTROL ROOM LIGHTING oggggy ggyjgy . _ ._. KI POWE R CO.

  • E. Inconsistency (wording): On CP001 hydrogen is abbreviated "H", on CP007 hydrogen is abbreviated "H2 ", and on CP005 hydraulic is abbreviated "HYD"(which can and has been misidentified as meaning hydrogen). 4 F. Hierarchy: Tiles not hierarchically located, e.g., on CP007, " Steam Generator IA PORY in Local"is on top row of column 3 and " Main Cond.

Vacuum Low -Turbine Trip"is on bottom row of column 3. G. Vague meanings: On CP001, 002 and 003, RWSI' HI/LO is displayed. There is no indication of which condition is alarmed. I I I I I' I I I h 3-22 3.1/03163 9754P/0787P

L I l HOUSTON CONTROL ROOM IGHTING g gggg y g g ygg y ( L .((.E POWER CO. F L 4.0 ENGINEERING DESIGN CHANGES ( Approximately two months'into the CRDR it was determined that many control panel changes would be required to resolve the potentially large number of IIEDs. Also, the information presented in the systems lectures showed that many other devices must be added to the panels. These additions were a result of normal design evolution and the changes required to satisfy Reg. Guide 1.97 requirements. The following sections discuss these changes. l { 4.1 REGULATORY GUIDE 1.97 CHANGES Regulatory Guide 1.97 specifies regulations for instrumentation to monitor plant variables and systems during and following an accident in LWR power plants. During accis.'ent g situations, information is required to allow the operator to perform the following: A. Perform safe plant shutdown using preplanned manual actions. B. Determine what safety systems are functioning. C. Determine potential for a gross breach of barriers to radioactivity release. An assessment of these requirements for the STP control room was made by Bechtel. Appendix A presents the parameter requirements for Reg. Guide 1.97 which includes parameter, range, category, and other detailed information on the displays and controls that must be added or am already on the panels. There are about 100 of these changes. 4.2 DESIGN EVOLITTION Several normal design changes have occurred since the control panels were originally , designed. Based on a preliminary assessment, 175 additions or modifications were [ 3.1/03163 975GP/0787P

p HOUSTON CONTROL ROOM j LIGHTING DESIGN REVIEW PeomT POWER CO. identified for the ten control panels. The following presents a brief list of most of the changes for each control panel: A. Chemical Volume Control System, CP004

1. There are four safety-grade design changes applicable to this system:

I (a) Modification to the charging header of the centrifugal charging pumps. This involves the addition of two IE valve controls. (b) Upgrading the flow indicators on the seal injection lines. (Included in Reg. Guide 1.97) (c) Upgrading the charging flow indicator (Included in Reg. Guide 1.97 instru mentation). (d) Upgrading the RV llead vent to the pressurizer relief tank. This will require adding two IE volve controls and associated indicator for the throttle valves. B. Safety Injection and Residual Heat Removal Systems, CP001, 002,003

1. Class IE containment and containment sump level indication will be added (Included in Reg. Guide 1.97 instrumentation).
2. It is anticipated that extensive alarm modifications will be required for the accumulator discharge isolation valves.

D 4-2 3.1/031G3 9756P/0787P .

L p houston . CONTROL ROOM LIGHTING b, & DESIGN REVIEW

      . fik2!KI POWER CO.                                                                               '
3. Three solenoid operated accumulator vent valves will be added for safety grade cold shutdown. These valves will require IE
  ,                             control switches and associated indication on CP001, 002, and 003.

l

4. Power lock outs are required for nine valves - low head safety injection (LHSI ) isolation, high head safety injection (IIHSI) g hot leg isolation valves, and accumulator discharge isolation R valve for each train to prevent spurious actuation from blocking a safety function which does not have a fully redundant backup. This will require adding nine switches and associated indication.

I 5. Several switches show different return to auto or normal positions than are shown on Westinghouse drawings. This will require review of the control circuits and coordination with Westinghouse to resolve the problems. In addition, a review is required to determine compliance with the Westinghouse system design documentation. I 6. Two reset switches are required for reset of automatic I switchover from RWSr injection to sump recimulation. 7. Status indication will be added for three RilR heat exchanger isolation valves and for three bypass valves.

8. Requirements for safety grade cold shutdown RHR lleat Exchanger flow and temperature indications will require the I addition of three Class IE meters to CP004 and replacement of three nonclass IE meters with Class IE meters. (Included in Reg. Guide 1.97 Instrumentation).

4-3 3.1/03163 9756P/0787P _ _ - _ - _ _ - _ _ - - - - - _ _ - - - - - - - - - - ~

r . 95 HOUSTON CONTROL ROOM g LIGHTING gggggy ggyggy g f1O!KI POWER CO. Component Cooling Water (CCW)and Fssential Cooling Water Subsystems, I C. CP001,002, and 003.

l. Changes are anticipated due to changing Westinghouse requirements on cooling the centrifugal changing pumps and the reactor ' coolant pumps and for cold shutdown /Bil requirements.
2. Changes are needed for all Train B power lockout for four valves submerged post-LOCA. This will add power lockout indication for these four valves.
3. Manual control action is needed for post-design basis accident (DBA)

I control of the spent fuel pool cooling water system. This involves the addition of two pump controls, and temperature and level 8 adication or alarms.

4. Controls for the make-up valve to surge tank need to be added to CP00 3.

D. Reactor Coolant System, CP005

1. The RX vessel seal o.P required during startup is currently not displayed in the control room.
2. The addition of Rx vessel level, core exit thermocouples, and subcooled margin monitoring to the main panel will require the addition of two Class 1E display systems. (Included in R.G.1.97 instrumentation)
3. The pressurizer PO RVs, block valves, and their controls and position i indicators will be upgraded to Class IE equipment to meet safety J grade cold shutdown and Ell requirements.

m 4-4 +

                                                                                             ~

3.1/03163 9756P/0787P _

~

100STON CONTROL ROOM LIGHTING gggggy ggyjgy L . . __ POWER CO.

4 4. Position indication for three pressurizer safety relief valves will be added. (Included in Reg. Guide 1.97 Instrumentation) k

5. Back-up heater power supply upgrading for TMI will require

{ upgrading two switches to Class IE.

  • e E. BOP Systems, CP005, 006, 007, 008, 009 L
1. Upgrade of the four existing steam generator PORVs to qualified safety grade active PORVs will require upgrade of the corresponding controllers to Class IE on CP006 for safety grade cold shutdown.
2. Safety grade active throttle valves are required for the auxiliary f

{ feedwater system for safety grade cold shutdown. This will require I 1 the addition of jog valve controls on CP005.

3. The TMI review of the toxic gas exposure to the control room will result in the addition of several meters and alarms to CP001, 002,

( 003. { 4. Upgrade four existing auxiliary feedwater flow indicators to Class IE on CP001,002,003. (Included in R.G.1.97 instrumentation)

5. Addition of four main stream line drain isolation valve controls and '

associated indication is required on CP008.

6. Addition of seven MSR drain valve controls and associated indication

{ is required on CP008. L - [ 3.1/03163 9756P/0787P

f HOUSTON CONTROL ROOM 1.lGHTING g

   -&                                                                                     DESIGN REVIEW        n

_ El POWER CD.

7. Addition of two valve controls and associated indication is required for the condensate polisher bypass and feedwater recirculatioh header block valves.1 8.

1 Addition of three condenser air removal vacuum pumps and three vacuum breaker valves is required for CP008.

9. Addition of controls and d; splays associated with a full-flow de9erator. This will cause major revision to the layout of the feedwater panel.

F. Miscellaneous Systems I 1. The addition of the post-accident sampling system will require addition of sampling system containment isolation valve controls on CP001, 002, 003. Twenty valve controls will be added including sample isolation valve controls for the normal sampling system.

2. Addition of six auxiliary cooling water pump controls is to be I

implemented on CP008. G. Electrical Systems 1. Eight battery charger ammeters and eight voltmeters , four battery g ammeters, four de bus voltmeters and b eaker status indication for E 12 breakers will be added in response to an NRC question on the Class 1E de system. II. IIVAC Systems 1. Thme new essential chillers are being added. These will require new # switches and associated indication to panels CP001, 002, and 003 for the chillers and the chilled water circulating pumps. J 4-6 + 3.1/03163 0756P/0787P e

rk HOUSTON CONTROL ROOM LIGHTING gggggy g5yggy r" & L _..... POWER CO. l

2. Four new RCFC and two new reactor cavity fans are being added to .

the RCB liVAC system. Th,ese will require new switches and associated indication. g 3. Approximately 26 fan coil units are being added or modified for the L MAB, EAD and FilB IIVAC systems. All require control room controls and indication.

4. Three supply, air handling units and three return air fans are being added for the control room envelope essential !{VAC system. All

{ require control room controls and indication. A summary of the above device additions, plus the Reg. Guide 1.97 changes, is shown in Table 4.1-1. F k [ [ . L E b 4-7 ( 3.1/03103 0756P/0787P a ________._________.__.____.______.__J

i HOUSTON CONTROL ROOM lGHTING g gggg y gg ygg y

 . M POWER CO.

T ABLE 4.1-1 I Known Design Changes CO NTROL DEVICE REG. G UIDE DESIGN PANEL TYPE, 1.97 EVOLUTION CP001 CR-2940 switches - 0 . Status lights 2 2 SBM/SB-1 switches - 21 Vert. meters 17 4 Round meters - 0 Alarms - 2 CP002 CR-2940 switches - 0 i CR-2040 buttons - - Status lights - 6 SUM /SB-1 switches - 14 Vert. meters 7 2 Round meters - 0 Alarms - 2 CP003 CR-2940 switches - 16 Status lights - 2 SBM/SB-1 switches - 12 Vert. meters 7 2 Round meters - 0 Alarms - 2 I CP004 CR-2940 switches - 4 Status lights 28 4 Vert. meters 4 1 Plasma dimlays 0 - Chart reconfer 1 - SBM CP005 Cit-2940 switch - I status lights 2 - Vert. meter 11 - Plasma displays 2 ~ SBM 7 J 4-8 3.1/03163 9750P/0787P

L

            ' HOUSTON CONTROL ROOM LIGHTING n

gggggy ggyjgy

       .. POWER CO.

g T ADLE 4.1-1 (Cont'd) Known Design Changes CONTIt0L DEVICE REG GUIDE DESIGN PANEL T YPE 1.97 EVOttfr!ON C CP000 Status lights 27 - [ Vert. meters CR-2040 7 - SDM CP007 CR-2940 SUM { , Vert. meters CP008 Cit-2940 - 16 r SBM/SB-1 switches - 0 L Vert. meters 0 - Round meters [ CP009 SBM Yort. meters CP010 SBM Status lights - 12 llound meters - 24 CR-2940 - - [ F L C 4-0 3.1/03163 075GP/0787P

                                                                  - - - - - _      A

f .. . . , \

         ,-             -p HOU510N                                                            CONTROL ROOM
              %         I?HilNG g gggg y gg yjg y l N.N POWER CO. ,

I 4.3 Orl'llER PANEL CilANGES Information was requested from the SI'P operational staff concerning equipment

                -       that could be remceed from the panels, equipment that could be relocated from one p4 nel to another, or equipment that could be revised. This information was 4

reviewed and endorsed by project engineering. Following is a list of equipment recommended for removal and relocation: A. C P001, 002, 003

                                !.      teclecnte llVAC switch control (2940s) for following areas to      .

separate llVAC control pancl: o Control Itoom u FilB o CilDM

         ,                              o           Miscellaneous Contonm[nt u           Containment Purge
2. Relocate four MSI/ ubove sent drain valves (29403) to CP007 g g
3. Italocute PAMS indientors to normal locations (CP004,005, and 000) anellntegrato PAMS with SPDS.

11 Cr004

                          ~ ~ 1.         F.clocnte radiation, nknitority system including sample isolation valves to a rndfation monitoring system panel or to the operator console.                          -
2. Ite!acate CCP cubicle fan switches (2040s) to CCP area. ~

4-10 3.1/03103 . . 9756P/0787P ' .. ,

l l HOUSTON CONTROL ROOM lGHTING

  • DESIGN REVIEW .

} MKI POWER CO. I 3. l Relocate boric acid batch tank controls (2940s) and indicators (vertical meters) to BA batch tank area. C. CP006

1. Remove four S/G setpoint indicators (vertical meters) from the panel (S/G level is not adjustable).
2. Relocate 23 PAMS Indicators (vertleal meters) to local areas and integrate PAMS with SPDS.

D. CP007

1. Relocate main steam temperature recorders to CP018 (Recorder Panel).
2. Relocate S/G PORV controls to CP006 and locate in respective S/G sections.

E. CP008 1. Remove condensate flow recorder and substitute indicator. I 2. Relocate circulating water chlorine recorder to CP018.

3. Relocate generator megawatt recorder to CP018.
4. Remove all circular punip ammeters (G. E. DB40s) and substitute small vertical meters.

I l 3.1/03163 mi 9756P/0787P

      $         HOUSTON                                                       CONTROL ROOM LIGHTING                                                      DESIGN REVIEW L. .MLO!%I POWER CD.

F. CP009 I

1. Remove all circular pump ammeters (G. E. DB40s) and substitute l

small vertical meters.

2. Relocate windspeed, wind direction, air temperature, and dewpoint indicators to the operator console. E
3. Relocate generator frequency recorder to CP018.
4. Relocate MAB HVAC to back panel.

I I I E 4 4 J 4-12 3.1/03163 9756P/0787P

u e pp houston CONTROL ROOM L1GHTING DESIGN REVIEW i.EE POWER CO. 5.0 IMPLEMENTATION SI'UDIES x. ~ l

      ~On November 22,1982, a MT meeting was held to review the control panel design. At this 5

time a decision was made to evaluate possible alternatives to resolve problems. Five design alternatives were defined for further study. These alternatives are as follows: A. Alternative 1: Re-layout all 10 panels with existing devices to meet all TMI, engineering, and Human Factor requirements (NUREG 0700).

1. Create two additional panels to previde "spillover" necessary to re-layout the original panels.

I L 2. Salvage presently purchased devices.

3. Only purchase devices to meet new r'equirements or if present device is unsuitable.

B. Alternative 2: Leave everything "as is" and use existing free space for the addition of new devices required by TMI and engineering requirements. c

1. Two new panels are created.

l N

2. Compromise on Human Engineering requirements.

l L C. _ Alternative 3: Re-layout all 10 pane?s with new miniature devices to provide space for new devices required to meet new TMI and engineering L requirements. m L 1. No new panels are required. ~ l L 5-1 { 3.1/03163 9757P/0787P

 $        HOUSTON                                                             CONTROL ROOM hj {GH"NG                                                                   DESIGN REVIEW
  ?J!9!M POWER CO.

I

2. Iluman engineering requirements are satisfied. .
                                     .                                                                                               I
3. Many old devices are scrapped.

D. Alternative 4: Re-layout of panels CP001-006, with existing devices, modify existing panels CP007-010, and create two new panels.

1. Panels CP006-010 are completely fabricated; they will be modified only by adding new devices required by engineering. Human engineering will be compdsed on these panels.
2. Panels CP001-006 will meet all 'IMI, engineering, and human factors I

requirements. E. Alternative 5: Re-design all 10 panels on a modular concept using miniature devices and using a new and smaller footprint. 3

1. No new panels will be created.
2. All TMI, engineering, and human f actor requirements wil be met.

5.1 ALTFC NATIVE 1: RE-LAYOUT ALL PANELS 5.1.1 Objective _ Aiternative 1 is defined as a complete new layout of the main control canels in order to i resolve all potential HEDs and to include all known additional controls and I [J 5-2 3.1/03163 { 9757P/0787P L

F L houston CONTROL ROOM LIGHTING DESIGN REVIEW

    . _.E       OWER CD.

displays on the panels. The project ground rules for this alternative were defined as follows: A. The existing hardware on the panels is to be retained to the maximum extent possible. B. The panel footprint is to remain the same. C. Panel delivery and plant construction schedule are to remain unchanged. Given the projcct ground rules for Alternative 1, an analysis was made to determine the feasibility and schedule impact of this alternative. The specific objectives were: A. Determine the panel surface area requirements necessary to accommodate F the following hardware combinations: { l. All of the present devices are retained except for the changes required to meet NUREG 0700. In addition, the Engineering mandated changes to meet post TMI requirements and STP design criteria were added to the cquipment on each panel.

2. Selected radiation monitoring equipment and HVAC equipment were assumed to be moved to separate auxiliary panels to provide additional space on the aiain panels. All of the Engineerirg mandated changes to meet post TMI requirements and STP design  !

criteria were assumed to be added to the main panels as in 1. above. l I [ 5-3 { 3.1/03163 9757P/0787P ________________a

         ~

I l p HOUSTON CONTROL ROOM LIGHTING DESIGN REVIEW _ f!!9!KI POWER CO. .

   ~
3. This combination is similar to 2. above with an additional area allowance for expected future additions due to design evolution.

B. Determine the impact on panel delivery date. C. Determine the schedule impact for releasing Elementary Wiring Diagrams. D. Determine the schedule impact on construction. In particular, the cable pulling schedule is a critical path item and an adverse impact on it could have broad consequences. 5.1.2 Approach I The method used to derive the panel area requirements is an approximation consisting of three steps. The steps are: A. The required devices for each panel are packed into the usable area without regard to functional grouping, but with strict adherence to the space requirements defined in Table 5.1-1 ard to the accepteble zone locations for each device as defined in the table. This step produces an absolute minimum panel area required with close packing of all the devices. B. Panels CP008 and CP009 were selected to produce a new layout for the devices ine?uding the additions defined by Engineering. The new layout t was made with a conscientious effort to utilize the panel area as effectively as possible, but with the prime objective to provide grouping of the devices by subsystems. A schematic of the revised layout is illustrated in Figure 5.1-1. The revised layout produces a realistic, but minimum, panel area required. 5-4 - 3.1/03163 - 9757P/0787P m

                                                                            .______._._____L______________._._________.____...____._________.______.___

a m HOUSTON CONTROL ROOM LIGHTING DESIGN REVIEW

       . ,_. El POWER CD.

7- ~ C. A ratio of the area from B. to the area with close packing from A. abov.e yields a multiplying factor to account for system layout oy subsystem [ grouping. This ratio was then applied to all other panels as a constant. L Since individual panels have a different makeup of devices between

   '                     switches, meters, reconfers, and panel inserts, it is essentially certain that the above ratio is not constant for each panel. In addition, the schematic layout for panels CP008 and CP009 do not account for functional grouping of devices according to system function and task analysis. Therefore, an additional allowance was included to account for this effect. This

{ allowance is discussed further in the Section 5.1.4. H 1 I The impact on panel delivery schedule and on the construction schedule was derived.by consensus of the project review team and engineering personnel with knowledge and experience in these areas. 9 H 5.1.3 Panel Layout Area Requirements The panel surface area is dependent on the number and type of devices to be installed on the panel, and on the particular arrangement of the devices. Generally, the actual area occupied by the devices Is significantly less than the usable area of the panel. Several bases tvere developed for the anslysis. These are: A. Each panelis divided into zones. The zones are: E Zone A. The angled surface which will contain only annunciator boxes. E [ [ 5-5 ( .3.1/03163 9757P/0787P

        'f        HOUSTON UGHTING                                 '

CONTROL ROOM

          \ ~&                                                                    DESIGN REVIEW
        $Ecl POWER CO.

Zone B. The vertical panel surface. The usable portion of this zone for meters is defined as the lower 18 inches. Because this zone is i beyond the reach limits for a 5th percentile female, switches are excluded from this zone. m Zone C. This is the lower break area inclined approximately 60'. Meters and switches are permitted in this zone. Zone D. The benchboard area. This has no restrictions on the type of device that can be installed. B. In compliance with NUREG-0700, no devices can be installed within 3-inches of the outside edge of Zone D. Therefore, the usable area of Zone D excludes this area. C. Structural angle iron restricts the installation of devices within 2-inches I of the lateral edges of the panels. Therefore, this area was also excluded from the usable area. D. A minimum space is required for each device to provide for labeling, visual separation, and to provide clearance between switches so they can be operated without inte'ferer.ne with other devices. Table 5.1-1 identifies the dimensions and clearances used for each device. E. For a change in switch type from CR-2940 to SBM the available free space on the panels is decreased. For the reverse change the free space area is g increased. An evaluation of the net effect of these changes is shown in m Table 5.1-2. The net result is a total decrease of 6.6 square feet of area for all 10 control panels. S-6 3.1/03163 9757P/0787P

- HOUSTON CONTROL AOOM UGHMG g gggg y gg ygg y - m,. & KT POWER CO. 5.1.4 Panel Area Correction for Functional Grouping Ths calculations were performed using panels eight and nine as the base. The devices { included on these panels were the existing devices plus the changes described in Section 4. The results of the calculations showed that the panel area required for switches consumed nearly all of the area suitable for a switch location, i.e., zones D and C. Nevertheless, the area available is adequate, with suitable allowance for future design additions. R1rther, the revised layout, which includes grouping by subsystem as shown in Figure 5.1-1, also shows that the available area is adequate when panels eight and nine are considered { together. The ratio of the consumed area with subsystem grouping to that of simple r packing is 1.16. However, because the subsystem grouping does not include the process of L optimizing the layout for functional sequence within the subsystems, some conservatism - was added by adapting a ratio of 1.20 to derive the panel area requirements. L 5.1.5 Panel Area Requirements, All Panels Table 5.1-3 illustrates the incremental area changes required to accommodate the design changes discussed in Section 4 for each panel. The table shows eight columns. These are: A. Area required for existing devices with close packing. 7 L B. Incremental additional area to accommodate the control switch type L changes. 1 [ C. Incremental additional area to accommodate known Engineering changes. + u H 3.1/03163 9757P/0787P m,, .

i

 &        HOUSTON                                                       CONTROL ROOM UGHTING
  \       a DESIGN REVIEW ME POWER CO.

D. Incremental area change to accommodate the relocation'of certain liVAC g and radiation monitoring equipment to auxiliary panels. E E. Incremental area change to accommodate future additions of hardware to the panels. F. Total panel area to accommodate .all of the above effects with close packing. G. Total panel areas required assuming area multipliers of 1.16 arid 1.20 to provide for subsystem and functional grouping. In addition, the table includes an intermediate summation of the areas grouped as follows: A. One sum contains the summation of effects on panels 001, 002, and 003 since these panels are associated only with ESF systems, and the panels are physically detached from the other panels. B. I Another sum contains the summation of effects on panels 004 through 009. These par.els are primarily associated with normal operating systems and form a contiguous surface for control devices. C. The effects on panel 010 are listed separately since this panel contains mimics which require additional area allowance. D. The last som contains the summation of effects on all 10 panels. 5.1. 6 Panel Area Available I Table 5.1-4 shows a comparison of the required versus available area for each panel. The required area is listed for both the minimum layout area ratio of 1.16 and the 5-8 - 3.1/03163 9757P/0787P S

                                                             -      -       ____.,___,__,_-__-_-_____-__---___s

u - HOUSTON CONTROL ROOM LIGHTING l gggggy ggyjgy ( I _ _. E OWER CD. L [ desirable layout ratio of 1.20. The results show that the available area is not adequate for L many of the panels, even for the minimum layout ratio of 1.16. The only panels which have an excess of available area are Panels CP003,004,009 and 010. In order to accommodate all the known plus expected future changes, certain instruments will have to be located in the "B" zone outside the preferred viewing area (the preferred viewing area is defined as less than 10 inches above the bottom edge of Zone B. Table { 5.1-4 shows the usable area for each panel when the allowable viewing zone is extended to 20 inches. The increase in total usable area is significant, about 14 ft . To achieve the r desired layout ratio for the total area requirements of Panels CP004 through CP009, it is L estimated that the Zone B usable height would have to be increased from 18 inches to 20.8 inches. This means that some instruments or displays will have to extend into the non-preferred viewing area. Instruments located outside the preferred viewing area will require scrutiny to assure that instrument readability is acceptable. L 5.1.7 Licensing Impact Since Alternative 1 involves complete new layout of all control panels to resolve potential IIEDs there is not expected to be any significant licensing impact. 5.1. 8 Schedule c l Thme schedules for Alternative I were prepared based on three different purchasing and p review procedures. The followmg three methods were examined: L ~ A. Normal purchasing and review procedures (See Figure 5.1-2 for schedule)

1. Bechtel writes detailed specification or B.M.
2. Bechtel issues for proposal L

~ 1 l 1 5-9 F 3.1/03163 9757P/0787P F i ( --

  • _ _ _ _ _ _ _ _ _ _ _ - - - _ _ - - - - - - _ - - - _ - - _ _ -- - - - - - _ - - --- J
 &       HOUSTON                                                       CONTROL ROOM GHMG                                                        g gggg y gg ygg y h

NE l POWER CO. -

3. Panel vendors prepare proposal I
4. Bechtel evaluates proposals
5. Bechtel awards P.O. on fixed price basis
6. Vendor prepares drawings and submits for approval
7. Bechtel reviews drawings and returns to vendor
8. Vendor does not start fabrication until drawings are approved
9. Each change is carefully documented and negotiated B. Accelerated procedures (See Figure 5.1-3 for schedule)
1. Bechtel writes detailed specification, and during its preparation negotiates a P.O. with a single vendor with authorized overtime
2. Bechtel forwards to vendor preliminary sketches
3. Vendor starts drawings. based upon preliminary information and submits for approval
4. Bechtel reviews drawings
5. Vendor starts fabrication based on " informal" approval of drawings
6. Changes are incorporated on drawings during fabrication process without commemial negotiations C. Minimize procedures with cost plus contrast (See Figure 5.1-4 for schedule)
1. Bechtel writes detailed @ecification and simultaneously negotiates a cost plus contract with oanel vendor.
2. Bechtel forwattis to vendor preliminary sketches.
3. Vendor starts drawings based upon preliminary information and submits for approval.

1 H 5-10 3.1/03163 - 9757P/0787P

~ . HOUSTON CONTROL ROOM UGHTmG g gggg y g g ygg y - m, & ~ .

   ..  ._._5I  POWER CO.
4. Bechtel reviews drawings.
5. Vendor starts fabrication besed on " informal" approval of drawings.

p 6. Changes are incorporated on drawings during fabrication process without commercial negotiations. F L 5.1.9 Conclusions [ lt was determined that Alternative 1 can a'ecommodate all the known engineering changes and the future design evolution changes. However, some instruments would be located { outside the preferred viewing area and these must be reviewed from a human factors standpoint. No significant licensing impact is expected for this alternative. I L Three schedules for different purchasing and review procedures were developed for the fabrication and delivery of the panels that ranged from a minimum period of 14 months to a maximum period of 22-1/2 months. { This alternative was not selected because it did not preserve panels CP007 through CP010 which were already constructed. E E [ [ [ [ 5-11 ( 3.1/03163 9757P/0787P

                                                                                             -----_-._.-_---__..-_--__.____--_-_-____------..-__.a

fl HOUSTON CONTROL ROOM LIGHTING . gggggy ggyggy

 .. .EE POWER CO.

T ABLE 5.1-1 Area and Clearance Allowance for Various Panel Devices Dimensions (ins) Horizontal and Vertical Area Device Actual With Clearance (in2) Large Recorder 17. 13. 18. 19. 342 Medium R'ecorder 17.75 9.0 19. 9.5 180.5 Small Recorder 7.0 8.0 7.5 8.5 63.8 Vertical Meter 1.5 7.0 2.75 8.5 23.37 Round Meter 4.25 4.25 4.25 4.25 18.06 i Process Controller 3.25 6.5 3.75 6.75 25.31 Hand Controller 2.375 3.5 4.25 6.5 27.63 SBM Switch with Status Lights 2.625 5.0 4.25 6.5 27.63 CR-2940 Switch with l Status Lights 2.625 3.75 3.375 5.0 16.87 m Status Lights: Green-Red 2.625 1.875 3.23 2.0 6.5 2 Windows 1.875 1.5 2.0 1.5 3.0 3 Windows 1.675 2.0 2.0 2.0 4.0 4 Windows 1.875 2.5 2.0 3.5 7.0 l 12 Windows 3.5 3.5 4.0 4.0 16.0 m CRT 19.25 17.75 20. 19. 380. Keyboard 17.5 11.75 19. 13. 247. Plasma Display U~navailable 14. 11. 154. EHC Panel 18. 15. 19. 16. 304. EHC Display 18. 13.5 19. 15.5 294.5 SGFP Centrol 12. 11. 12.5 12. 150. Reheat Temp Control 19. 8.75 20. 10. 200. 1 Emergency Trip 19. 8.75 20. 10. 200. 5-12 3.1/03163

              - . . . . i..                .
      -                                                                                                                                  ~

r L F L HOUSTON CONTROL ROOM LIGHTING DESIGN REVIEW

    ._ $N     OWER CO.

TABLE 5.1-2 Panel Changes to Conform to Switch Function Net Panel Number of Additional Number of Reduction in Additional Number Changes to Area Reg'd Changes to Area Reg'd Area Reg'd SBM (f t ) CR2940 (f t ) (f t ) { CP001 32 2.39 8 40 1.79 CP002 33 2.46 8 .60 1.87 CP003 23 1.72 6 .45 1.27 CP004 20 1.49 1 .07 1.42 - CP005 11 42 11 .82 0 L CP006 13 .97 4 .30 .67 CP007 3 .22 13 .97 .75 CP008 3 .22 0 0 .22 CP009 0 0 0 0 0 CP010 1 .07 0 0 .07 l Totals 139 10.38 51 3.81 6.60 s H - 5-13 3.1/03163 + 9757P/0787P -

ff HOUSTON CONTROL ROOM lGHTING g gggg y g g ygg y

             !.!!9!KI POWER CO.
                                                             . TABLE 5.1-3 1

Evolution of Panel Area Requirements Areas, f t 2 I Existing Additional Additional Area loss-Area of Area to Area for from Panel Devices Correct Known Approved No. Close Pack Switches Changes Deletions CP001 34.29 1.79 9.81 -7.55 CP002 43.64 1.87 5.46 -10.41 CP003 2548 1.27 6.12 -7.02 Sum 1-3 103 51 4.93 21.39 -24.98 CP004 39.40 1.42 1.90 -12.24 CP005 32.65 - 4.45 - CP006 32.51 .67 2.09 .14 CP007 22 70 .75 -

                                                                                                                                    .89 CP008                 27.00                                 .22           4.50                                       -2.51 CP009                  6.50                                -                -
                                                                                                                                 -3.69 Sum 4-9              160.76                               1.56           12.9 4                                     -19 47 CP010                 25.20                                  07           5.00                                          -

Sum 1-10 289 47 6.56 39.33 -24.98 M 5-14 - 3.1/03163 9757P/0787P _

~ u HOUSTON CONTROL ROOM ~ ,,,. & DESIGN REVIEW \'

   .__51 POWER CO.
                                   ,'Ihble 5.1-3 (Cont'd.)

Evolution of Panel Area Requirements Areas, f1 2 [ - Required Required ( Additional Area Area Area for Total w/ Layout w/ Layout Panel Future Area Fa'etor - Factor No. Evolution Required 1.16 1.20 I L CP001 4.25 42.59 49.40 51.11 CP002 4.47 45.03 52.23 54.04 CP003 3.34 29.39 34.09 35.27 Sum 1-3 12.0 6 117.01 13 5.7 140.04 { CP004 CP005 3 09 2.58 33.57 39.68 38.94 46.03 40.28 47.62 e CP006 2.35 37.98 44.06 45.58 CP007 1.04 22.10 25.64 26.52 CP008 2.30 31.51 36.55 37.81 CP009 .52 3.33 3.86 4.00 Sum 4-0 12.38 168.17 195.1 201.8 { CP010 Sum 1-10 3.14 27.58 33.41 318.59 369.6 38.76 40.09 38 2.3 m k 3.1/03163 9757P/0787P 3

   'fp      HOUSTON                                         .

CONTROL ROOM LIGHTING DESIGN REVIEW

    ' EE    POWER CD.

TABLE 5.1-4 Comparison of Required vs. Usable Panel Area Required Area, ft 2 Usable Area, ft 2 l Panel Layout Ratio Layout Ratio Zone B=18" Zone B=20" Number 1.16 1.20 CP001 49.40 51.1 1 49.32 51.1 8 CP002 52.2 3 54.04 49.32 51.18 CP003 34.09 35.27 38.28 39.72 Sum 1-3 135.72 140.42 136.92 142.08 CP004 38.94 40.28 46.10 47.88 CP00 5 46.03 47.62 31.92 33.20 CP006 44.06 4 5.58 4 0.51 42.12 CP007 2 5.64 2 6.52 21.51 22.36 CP008 36.55 37.81 32.02 33.23 CP009 3.86 4.00 11.04 11.46 Sum 4-9 195.10 201.81 183.70 190.25 CP010 38.76 40.09 42.69 44.31 Sum 1-10 369.6 382.3 362.71 376.64 I I I W 3.1/03163 ~ 9757P/0787P w

u r L HOUSTON CONTROL ROOM DESIGN REVIEW I .. E POWER CO. w . r ' T. t [. i 4r_1 [ 3[

                                                                                     .                                                                                      I

[ i i!;,

                                       ;c i               f
                                                                   ' .. s n
n. ,

i h'isi1 v , li i-

                                                                                                                                                                            !!l ni, vs b                                                                                       1
                                                                      ;}
  • d ' I '! f ic 1 ,- l lc 3

fl

y 1 9 m-
                                                     ~

RODO - - 1 li 1 1 1 1

                                                                                                                                                                     -~

li ! ~  ! ls U0 i ill

                                                                                                                                                                           }-[l 7:
                                                                                                                          'i
                                                                ,7                            4 g        i                    .

3 r :l ; 9, ;4 < g,, , l " 1i

                        ,1 i i m(             3 7.

i ,

                                                                                                                           .3 1
                                                                                                                                                                        --r-i o
                                                            'b,            3 lpi                      i t

i

  • O EI

[ i. Hl I ! ' ! - i:.- - r H g'.

                                                                                              .,                                 i i          i i

i i ig O l i I j,g - I- - ]q [t j 1

                          i                                            i    ll br-                                   ;     !            1    D                  '

ll l il ri ). ~l i  : b' d' lI N _l ] [' i ( i. l.l. i..__ g ir e 7, . {. ll : !j j k,, . f d0 $ I ii } i

                                    .q                 j               $                      4                               ,           1       l._.j          '
                                                                                                                                                                        'ffTT i    >
                               ~3 r                  . i e

1 , 5 I #

                                                                      .S--d                   $'                           h' a              i       i        ii         T   h, a                                                        !                  +
                                                                                -l, TT77 4                 5
                                                                           ~       l       il        I li       il                     i    I       3_~I i                                           l
                                                                                                                       ,                I U                                                       ll               3 I

a 1. 2 . 1 l j i '

                            ; . .j                                     !!                           I
                                                                                                                             '       0 E

L

                     !'     i        q
                                                                       'i                           i                       di l            1
                                                                                                                                                                 'l I                !

c-8

                                                                                                                           ,!l l a           j       l        l q         .

_; --_7 ~ ^ i i r L REVISED LAYOUT FOR ALTERNATIVii1 p Figure 5.1-1 L 5-17 __--______--______________--_-__-_______n

1l ll

         .5 C*                                                                                                 OOR$O& 2Oo=

s=

  • OmMbE :DM5mm 8 =3 O.

3 2 V 2 2 L L E 1 2 EN 0 2 NA A P PT V1I T S 9 1 SA 1 L 2

                                 = =                                                     V e

1 7 7V 7 5 Y 1 6 1 V 5 1 V 4 1 7 V 5 3 1 Y 2 1 V 1 1 9 0 1 9 8 V U 7 6 E 5 4 V 3 2-1 l N S K L H . C OI E E E T N L A . A A D D C . B S C P R N Y O G I O A C N R . T W B S U D T L P. m I TY W A N G N N A l D L A A V d I B E R F O T A b S N M lI U S . A L D l T C E P, R D 0S E C T AA S C H P N Y TL I C P A 1 S CA C 0 EU S E V A A 0 DC E E m S 1 L T I D T . R H 0 N T D LA S T S A T 0 RA E U N C E L A, G P S C E N N L E M A C R N .T S I E O EN E L LI U L W R M NE C E AM T AN P E A P, A N C E N AG L A . RS I U TM A R D T C m P E P UE . NP NR I A R P E TL TS EL C R . TG EI R U P TS G E P u AP E NC U D C SNI R Q N E N S ME D OY R NY D T U E OI C RI N R . R R C T AC RS RV I I, CG T P S U .G O E FL EA SSL E GA AE O T FNI FE W E T S m u O S N R RV RNV BC 0 N T D R E YLI AEW A AO A IW O D I M EI SA UT ON A T, m LNA P E PR EP P E A R P L S I I UM T U P E E EA R R RP R RP UE EE U O R RI RP0 P PA PDA BS RR CM P W 1 1 2 3 4 5 6 7 8 9 J - L 81 aCIm O:n >[m32 ma- I gm oO_ [cI *.[ f [0 0 1 f I

                                                                            '                  l             i        ,lfl(l

O M M R _R ._R R R Ul R R U Ul fl_ J7 F

                                                                                                                                                                                            $   hE MoniTHS                              2 3 4  5   6     8  9  10 E. d N 1

7 11 12 13 14 15 16 17 18 19 20 21 22 23 2 ,O

l. RELAYOUT MAIN PANELS 001010 AND TWO B ACK V _7 h PANELS. PREPARE GENERAL ASSEMBLY V W = 1ST PANEL O DRAWINGS.

V = LAST PANEL C m 2. PREPARE ORDER PLACEMEN T CYCLE. 57 n O 3. PREPARE FRONT PANEL CUT GUT DRAWINGS. 57 V 2 APPROVAL CYCLE. [h 4. PREPARE STRUCTURAL AND DETAll FABRICATION V Y en cm DRAWINGS AND SEISMIC CALCULAll0NS. 132 2 APPROVAL CYCLE. e.o ci hk W

5. BUILD BOARD STRUCTURES LESS CUT GUT PANELS. V R

m SEISMIC TESTING.

           -*    6. REUSE OF CURRENT PANEL DEVICES AND ORDER                                                                                       V l        REMAINING EQUIPMENT.

E m 7. CUT DUT FRONT PANELS, ATTACH PAINT, AND V Y l j MOUNT DEVICES. ' O O

8. PREPARE WIRING DRAWINGS. APPROVAL CYCLE. 7 Y
9. WIRE, TEST, INSPECT, PREPARE AND SHIP. W W l

OO mO 42 b5 EO

n &

l mg 50 l l mO  ! E it: i l L _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l l

 ,5Ea2l '

iC 0OR &or- m0oR 0mM$t=m5mM Q =k" O. - 3 2

  • 2 2 L 1

L E

  • 2 E N NA 0 AP 2 PT T S 9

1 S I L A

                         = =

7V 8 1 7 1 6 1 5 1 4 1 Vl 3 1 1 2 Vl 1 1 0 1 Y 9 7 7 8 5 5 Y 7 5 7 Y 7 5 6 9 Y 5 7 4 5 Y 7 5 3 Y 2 1 l

                                                                                                 ,8l N               S.

K O L R . C I t E E T N A A D D I B S C A R N C P A Y O S L G l T O C WE N I h B E

                                                 .         U        D             T L         P TN          W         A      N         D        N A

N A I H DA A F O T I A V S N P R LI U S O AN O  ! T C F P. R D AA H 5AI 0 T U TL EU S S i v t C WNA 0M O DC E E A E S 1 F L D T . R 0 T D LA T S H 0 O U S L G A T S T C N A C E E A, N P N LU C R N . S I E R O EO L E LI U T AN T L W P, M NY N AM C P E E A AA RS N R T PL A . UE . I U T N P M A O C P E TS EL R . P E NY TL C TG EI R U TS G P I AIF NC U DC SN RQ N CE N S N OY R NY I I MD D T U E OI R RC T AC 1 RS RV T O I FL SSL AE CG W T UM EA E GA O T FN FE E S O ; S RV R NV BC ON I T D R E YL . 0 UT AO A WI O D EI DN A T. AE 1 PR P R L MI SA P E LN - 6 EP E AP I SI UM T U E R EA0 RP R RP UE EE UO R I RP0 PA PDA BS RR CM P W k 4. 1 2 3 5 6 7 8 { k gO O%m O n > h g hI_ -

                                                                -   m'I 3y OO-     l l
                                               !           1 2y 0,{                                                                                 {
                                                       ,                                                                              k

{ lIl l llllll!l! tl1l

L HOUSTON LIGHT lNG CONTROL ROOM DESIGN REVIEW [ _

      ,_E     OWER CD.

{ 5.2 ALTERNATIVE 2: USE OF PRESENT LAYOUT 5.2.1 Approach [ For Alternative 2, the present control panel design will be retained with any additional control panel changes integrated into this design. Changes that add devices to the control panels will require the placement of these devices in existing empty space on the panels. { The technical feasibility of Alternative 2 is primarily based on whether available space exists on the panels to accommodate the presently known additions and any anticipated additions. To evaluate the present control panel design for Alternative 2, the following procedure was used: { A. Control panel sketches were prepared to determine (on an approximate basis) if the available space on the panels could accommodate the known and anticipated haMware additions. B. Paper diagrams of known hsMware changes were added to the control room mockup to verify that sufficient free space exists on the control panels to accommodate the changes. E C. The approximate number of HEDs that will result from the present CRDR effont including the expected discrepancies arising from the known panel additions was determined. D. Based on this projection of the expected number of HEDs, the approximate effort required to resolve these HEDs was determined. This included the ( manhours and schedule required to process the HEDs through the PRT and the MT as described in the Program Plan. L 5-21 { 3.1/03163 9757P/0787P

                                                                                                --)

f HOUSTON CONTROL ROGM lGHTING gggggy ggyjgy M.Cl POWER CD. E. The licensing effort (meetings and correspondence) required to justify the IIEDs that require partial or no correction was determined. F. An estimate of cost and schedule required to revise and deliver the control panels was obtained. 5.2.2 Unused Usable Space (UUS) A preliminary evalua' tion of the total available panel space was measured on the STP control room mock-up. Table 5.2-1 presents measures of the panel space (in square feet) relative to the amount of space that is currently available for additional or relocated components.1 This space, termed the unused usable space, is theoreticalin nature and represents the measured panel surface area that does not presently contain control or display components. Since a number of variables will influence the actual panel space that becomes available for adding or relocating components, the UUS measure should be considered only an approximaticn. For instance, some UUS will accommodate certain components, but will not accommodate otht.rs (4" x 4" area would accommodate a pushbutton, but not a vertical meter). The STP control pane's presently contain scme components (e.g. convex-face sertical mects) that ute too high en the panel surface for efficient operefor use. Thus, some UUS e will need to be used for relocating these components for better accessibility. Additional UUS will be needed for functional demarcation of components by system and/or train. The reference area for allTable 5.2-1 measures includes the entire surface area of Segments C and D as well as the lower 18" of Segment B. Area above this reference area is not considered acceptable even for viewing purposes. - W 5-22 - 3.1/03163 - 9757P/0787P _

L HOUSTON CONTROL ROOM 1.lGHTlNG I DESIGN REVIEW { IMs& POWER CO. [ Finally, behind-the-panel engineering constraints likely will further reduce the UUS. In these respects, measured UUS will overestimate the actual space available for adding or l relocating components. Ilowever, this overestimation may be offset by the removal of some components from the main panels as operational personnel have indicated for I Alternative 1. 5.2.3 Results Appendix B presents the panel diagrams showing the known device additions sketched into the available free spaces. Based on these sketches and the results of the mockup { revisions, it was concluded that, with the exception of panels CP005 and 006, there was I sufficient available space to accommodate the known design changes. Panels CP005 and 006 were able to accommodate most of the added devices but some of the vertical meters and the two plasma displays would not fit. In these cases, some rearrangement of the display devices could permit the addition of these devices. As a result of a review of the sketches in Appendix B and the revised mockup it was I decided that the panels were marginally acceptable with regard to available space for accommodating known design changes, but there is not sufficient space to fit any future design changes. I Potential revisions that would change the amount of space available for the addition of the knorm charge 3 are: A. Relocation to an auxiliary panel of some haniware as recommended by Operations and Engineering. I B. Removal or relocation of many of the strip chart recorders and possibly the CRT displays and associated keyboards. I g 5-23 3.1/03163 9757P/0787P

1 ff HOUSTON LIGHTING CONTROL ROOM g DESIG.N REVIEW l I  ?!!9JKI POWER CD.

5. 2.4 Licensinrt Impact Based on the CRDR which has been performed on the present control panels, many lluman I

Engineering Discrepancies (IIEIh) or observations have been found on the present panel , design. The major lied category violations that have been discovered to date are: A. Most of the ESF systems on panels CP001, 002 and 003 are not grouped according to task sequence. I B. Many of the control panels do not have the controls and display functional l grouped (e.g., the Reactor Coolant System has 26 devices on panel CP004 and 37 devices on panel CP005). C. The PAM displays on panel CP002 and CP006 do not satisfy the functional grouping requirements. In addition, several discrepancies will arise when devices are added to existing board space fer the known design changes. The discrepancies for these changes are expected to incluce: A. Functional and task sequence grouping violations due to the placement of devices in available space instead of the proper functiondly acceptable g space. E B. Violation of several panellayout criteria such as separation, proximity and frequency of use criteria. l Based on the CRDR effort that has been completed to date, the number of observations l were estimated to be approximately 330 (involving approximately 2350 devices). The projected number of observations for the completed CRDR was estimated to be G60 observations. Of these, it was estimated that 65% (429) will be recommended for l correction and of the 429, 15 % (64) will eventually be corrected. The remaining 365 will 5-24 7 3.1/03163 " 0757P/0787P -

                                                                                                                                           )

i jp HOUSTON CONTROL ROOM lGHTING l g gggg y g g ygg y l l .829!Kl POWER CO. l l require a written justification to the NRC to allow partial or no correction. The estimated effort required to justify these observations for Alternative 2 is approximately j 1100 manhours total, assuming three hours per observation. A total period of from six to eight months will be required to resolve the licensing issues. 5.2.5 Schedule Because of the high licensing risk associated with this alternative, a detailed schedule for completing the CRDR was not developed. The impact on the panel delivery date was judged to be unacceptable. I 5.2.6 Conclusions Alternative 2 was determined to be technically feasible for all the control panels except for panels CP005 and 006. For these two panels some rearrangement of display devices would be required to accommodate the known design changes. Due to the requirement for a significant licensir.g effort to justify HEDs, the panel delivery date using Alterr.ative 2 was judged to be unacceptable. I 1 5-25 3.1/03163 9757P/0787P

l

,         pp        HousTcn                                                                        CONTROL ROOM lGHMG ,                                                                       g g ggg y gg ygg y l g
           ?!!9KI POWER CD.

T ABLE 5.2-1 l STP CONTROL PANEL , UNUSED USABLE SPACE (UUS) TWAL SPACE PANELS SEGMENTS SPACE TAKEN UUS UUS AS % OFTMAL SPACE (f t2) I 001 B 17.2 13.9 3.3 19 C 9.3 7.2 2.1 22 D 26.0 21.5 4.5 17 TMAL 52.5 42.6 9.9 19 002 B 17.2 14.7 2.5 12 C 9.3 6.5 2.8 30 D 26.0 20.6 5.4 20 TWAL 52.5 41.8 10.7 20 003 B 13.5 9.6 3.9 28 C 7.5 5.7 1.8 24 D 21.0 19.0 2.0 9 TMAL 42.0 34.3 7.7 18 004 B 16.4 13.3 3.1 19 l C 8.9 8.3 .6 6 D 23.9 21.5 2.4 10 TOTAL 49.2 43.1. 6.1 12 005 B. 12.0 12.0' _ 0 0 C 11.9 11.6' .3 3 D ' i6.9 15.0 . 1.9 11

                  ~

TMAL- 4 .8 38.6 2.2' S -

                                                           .                                                           ~
           ~    '                                 '
                                                                                        ^

5-26 3.1/03163

         -9757P/0787P                           ,
                                                       /

[ HOUSTON CONTROL ROOM LIGHTING

      %                           TABLE 5.2-1 (Cont'd)                                                                                             DESIGN REVIEW h    $$ POWER CD.

STP CONTROL PANEL UNUSED USABLE SPACE (UUS) b TOT, AL SPACE PANELS SEGN1ENTS SPACE TAK EN UUS UUS AS % OF TOTAL SPACE (f t2) b i 006 B 15.7 11.7 4.0 25 C 8.0 6.9 1.1 . 14 i D 21.4 19.2 2. 2 10 TOTAL 45.1 37.8 7.3 16 007 B 8.0 64 1.4 18 [ C 4.4 4.1 .3 7 D 11.1 10.9 2 2 TOTAL 23 5 21 4 19 8 008 B 18 4 17 4 1.2 6 C 10.3 9.4 .9 9 D _28.9 24.5 4. 4 15 h TOTAL 57.3 51.3 65 11 009 B 3.7 2.9 { .8 21 C 2.0 1.8 .2 10 D 5.8 3.7 2.1 36 TOTAL 11 5 8.4 3.1 27 010 B 14.8 10.8 4.0 27 C 8.3 58 2.5 30 D 23.1 17.9 l 5.2 g TOTAL 46.2 34 5 11.7 25 Mean UUS CP 001-010 l As % of Total Space 15 % 5-27 l 3.1/03163 9757P/0787P h _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ . - _ _ _ - - - - - _ - - - - - - - U

l l f HOUSTON CONTROL ROOM LIGHTING l gggggy ggyjgy g m KT POWER CO. I 5.3 ALTERNATIVE 3: RE-LAYOUT ALL 10 CONTROL BOARDS USING SMALLER liARDWARE 5.3.1 Approach The five alternatives were generated in order to supply data on which to direct the g implementation effort. At the time it was questionable, considering the known design g changes, if all equipment could be fitted into the available usable space utilizing the hardware originally selected. Alternative 3 is a study to determine the flexibility to be gained by specifying smaller hardware, and the results are given here as a sub-set of Alternative 1. 5.3.2 New IIardware The greatest gain in board area can be achieved by replacing the SBM switches with pistol-grip handles with some smaller type switch. Other equipment considered for replacement were rotary switches (CR2940 type), controllers, and vertical panel meters, but the area gained does not justify replacement of these devices. The type of rotary switch presently used occupies an area small enough to allow for a relatively dense packing factor, and other types of rotary switches do not significantly reduce the area required. The total number of controllers used is small, and any area gained by substituting new I hardware is minimal. The vertical panel meters used (6" scale) are convenient for easy operator viewing from a moderate distance, and allow or scale divisions to be chosen large enough to provide accurate reading and still cover a broad range of process excursions. Therefore, the equipment selected for evaluating Alternative 3 is the Electroswitch 20K line of switches. This equipment is readily available, is qualified for IEEE-323-1974, and contains enough _ variety to provide the configurations needed. The handle sizes available are detailed

                                                                                                                                                           ~

below: 5-28 3.1/03163 9757P/0787P

f I \ $ HOUSTON lGHTlNG CONTROL ROOM DESIGN REVIEW Pf!9!ECl POWER CD. I HANDLE DEPT H, in DIAMETER, in ~ i Pistol Grip 1.25" 1.68" T-handle 1.0" 1.5" Knurled 1.0" 1.13" I The escutchion dimensions for this switch line are 1.9 x 1.9 inches. I 5.3.3 Re-layout l l A typical subsystem, pressurizer control, was arranged (Fig. 5.3-1) using the dimensions of the new hardware, to obtain an envelope for comparison with the existing design. The re-layout was necessary because no additional area is gained by a direct one-for-one component substitution. I The existing pressurizer controllayout requires approximately 904 square inches, and the rearrangement covers 748 squart inches, for a reduction of 17% of board area. 5.3.4 Control Board Delivery I This alternative has the same impact on the control board delivery schedule as does i l Alternative No.1. However, any further changes, either during panel fabrication or subsequent to plant startup, will be easier to accommodate because c,f the larger spare l area obtainable with the smaller hardware. 5.3.5 Elementary Wiring Diagram (EWD) Schedule I Wiring diagrams, as well as all data bases, etc. will mquire more engineering effort to complete, as each drawing showing switch developments must be revised. The drawings associated with 847 switches will need revising. I 5-29 3.1/03163 9757P/0787P

HOUSTON CONTROL ROOM LIGHTING l gggggy g5yggy NN POWER CO. I

5. 3.6 Board Costs
           .Neither this change nor Alternative 1 allows for retention of any existing control board front skin. The re-layout task will be easier because of the additional flexibility available
      =     with the smaller hardware. Costs are increased over Alternative 1 by the costs associated with specifying and procuring the new hardware. These incremental costs were not developed.

53.7 Conclusions Alternative 3 produces a 17 % reduction in area required for equipment, should impact control board delivery dates no more than Alternative 1, increases board costs by the cost of the new hardware, and requires revisions of the EWIh, and logic diagrams and data bases to reflect the new hardware. This alternative was not selected due to the possible schedule delays resulting from unreliable delivery dates for the new hardware. 5.4 ALTERNATIVE 4: RE-LAYO UT PANELS 1-6 I

5. 4.1 Approach I

For this option only those panels that control safety-related equipment, panels CP001 through 006, will be redesigned using the same type control / display devices that are used on the present panels. Panels CP007 through 010 are already fabricated; therefore, these panels must be modified to accommodate the design changes described under Alternative

2. Since this alternative is essentially a combination of Alternative 1 and Alternative 2, the evaluation approach is similar to that described for these alternatives. The evaluation of this concept used the same procedures described in previous sections for the respective alternatives. 7 J
                                                                                                          )

5-30

                                                                                                          ]

3.1/03163 9757P/0787P

~ ff HOUSTON LIGHTING CONTROL ROOM e  % DESIGN REVIEW _ $$ POWER CO. E 5.4.2 Results F - L The analysis for Alternative 1 showed that sufficient area is available on panels CP001 1 l through 006 for re-layout to resolve HEDs and to incorporate known and anticipated design { changes. For panels CP007 through 010, the evaluation performed for Alternative 2 showed that sufficient UUS was available to accommodate the known design changes but not sufficient UUS for the anticipated design changes. As indicated for Alternative 2 there are some potential revisions which would increase the available space. { 5.4.3 Licensing Impact 7 With the addition of 25 new switches to panels CP008 and 009, it is anticipated that there will be an appreciable increase in the number of HEDs due to lack of functional grouping and integration of controls and displays. This result is the obvious outcome of adding a I large numbe; of new devices to the panels while restricting rearrangement of the existing devices to preserve functional grouping. l The licensing impact is uncertain in that the systems involved are not safety-related. Therefore, there is not an obvious precedent that can be compared with to judge the licensability. l l 1 I 1 l l 5-31 3.1/03163 9757P/0787P

      $         HOUSTON LIGHTING CONTROL ROOM DESIGN REVIEW I P# N CT POWER CO.

5.4.4 Schedule - An estimated schedule for the design, fabrication, and delivery of the control panels using Alternative 4 is presented in Figure 5.4-1. 5.4.5 Conclusions The feasibility of Alternative 4 is based on the evaluations of Alternative 1 and Alternative 2. A re-layout of panels CP001 through CP006 was determined to be technically feasible based on the evaluation of Alternative 1. The revision of panels CP007 through CP010 was determined to be technically feasible based on the Alternative 2 evaluation. The licensing impact of the changes to panel CP007 through CP010 is uncertain. Although Alternatives 1 and 4 were similar in most respects, Alternative 4 was selected because it preserves the panels (CP007 through CP010) that were already constructed. I I I I l l 5-32 - 3.1/03163 9757P/0787P I

                                                                                     ,l1'       \:

( - 7 5eI'IE OO2NO&%OOi t 5z!5 -

 !
  • Cm4bE%M$ME EEE 8' 7

_ 6 7 1 L 5 LE 1 E N 4 1 NA AP Vl P T 3 1 T S A S 2 1 I L

             = =                                                                 VI                  _

1 1 VV g 0 1 Y 9 7 8 5 V 7 S' 7 Y 7 5 6 7 W 5 7 4 5 Y 7 5 3 W 2 1 L

0. N A 1

V S G K0 O L N .

                     -        I O           E             I E

C 6 TR N N L A0 AP D A C I - B0 O LS S G CP I A P A M N A Y C N R . T WE I B S U E R T L P TN W A N O R N A I H DA A F O T E I A V S N P R lI U P O _ - D AN D l T C R D I T AA R H P N _ 5A 0 U TL S S O C P A 0M EU E D A A S G DC E 1 - F L N T . R H 0 T D LA T S 0 O A _ T U N C S E A G A S P _ N S LU T C A C R E S

                                                                     ,       N   E O                L                   U I

R M EO E LI AM T C I L E W A P, NY N C V AA RS N R T PL A UE I U E A D C P E R . D NY TL TS TG L P . G E C D TS P I AIF NC U N SNI E N CE N S MD OY R D T N OI RI N R C T A A I T O RS P T RV I UM FL EA SS AE OT N FE W T S - O S  ; RV E G BC E E G T D E E R RNI E A M UT YL AO I T, AE LN PR A WL P D L M VI P ON A P E EP E AC I S LU T U E R EA I RP R RY UE AQ U O R - RP PA PDC BS SE CM P WI 1 2 3 4. 5. 6. 7 8 5%O%m3:D p4=2k2m -

  • 2 E In,A -

n ch

                                                    ;ll1I               1lI
     $          HOUSTON                                             .                                CONTROL ROOM      g g gggg y gg yjg y y lGHMG
     .?!!O!EI POWER CO.

5.5 ALTERNATIVE 5: REDESIGN ALL PANELS USING MODULAR CONCEPT AND NEW FOOTPRINT 5.5.1 Approach Alternative 5 involves a complete redesign of the control panels using new components and a redesigned foot print. The control panel profile would be redesigned for human factors considerations. Individual panels would be designed on a modular concept to provide l flexibility for future changes and additions. As indicated in NUREG 0700 the results of the redesign should be increased availability by satisfying the following criteria. A. The control room must be arranged with normal pant operations as the primary objective. B. The control equipment must be laid out in a functional manner. C. The design must be flexible to permit future changes and additions. I D. The design must allow for maintenance with the unit on line. E. The design must be compatible with the engineering, construction and start-up schedules. An evaluation of the functional requirements and preliminary system specifications for a design that satisfies the above criteria was performed. The technictu feasibilities of Alternative 5 is primarily based on availability of panel space for accommodating the panel equipment. The feasibility of Alternative 5 can be s established on the basis of the results of the evaluations for Alternative 1. This alternative involves a re-layout using the present devices. l 3.1/03163 0757P/0787P

t E HOUSTON CONTROL ROOM s g gggg y g g yjg y _ lGHMG

   . __5I POWER CO.

l A similar layout using miniature devices should provide considerably greater available area for placement of these devices. The following section discusses a feasibility evaluation of l Alternative 5. 5.5.2, Results Aiternative 5 is similar to Alternative I with the exception that Alternative 5 uses miniature panel devices. The results for Alternative I showed that sufficient area is available to re-layout the present devices with a functional grouping. But, to achieve this some panels (CP001, 002, 005-008) require the placement of certain instruments outside the prefermd viewing ama. As indicated, Alternative 1 is marginally acceptable with some human factor review required regarding instrument readability. For Alternative 3 a re-layout of pressurizer controls and displays on panel CP005 resulted in a 17% reduction in boani area required through the use of miniature switches. Since the area falling outside the acceptable area for Alternative I was only about 5% (382.3 f t2 required versus 362.7 f t usable)it was concluded that miniature devices for Alternative 5 i can be functional grouped with the acceptable area on the board. 5.5.3 Conclusions Alternative 5 was determined to be a technically feasible method of redesigning the control panels to satisfy the TMI, engineering and human factors requirements. Since this option involves complete layout of all control panels to resolve potential HEDs there is not expected to be any significant licensing impact. The schedule for designing and fabricating the control panels for this alternative is essentially the same as that shown in Section 5.1 for Alternative 1. These schedules must bowever be adjusted to reflect the availability of the new miniature hardware. I This alternative was not selected due to the impact on panel delivery schedule caused by possible unavailability of new miniature hardware. I 5 35 3.1/03163 9757P/0787P

L r L HDUSTON CONTROL ROOM , _ $ " '"

  • DESIGN REVIEW L ... _ . POWE R CO.

APPENDIX A PRELIMINARY ASSESSMENT OF E CONTROL ROOM INSTRUMENTS TO MEET REGULATORY GUIDE 1.97 , [ E L - r L r L r L_, u F . L 9805P/0760P i-k _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ -

O O O_ _R _R _R M. R _ R. .. f~~l R_. M f~~~l M R R f L ,___ f l M f-TYPE / QUAL NO. Of VARIABLE RANGE / STATUS- CAT ENV. SEIS CHANhELS DISPLAY IMPLEMENTATION

1. RCS Pressure 0-3000 psig A1 BI,82 Yes Yes 3/ plant 3 indicators (2 IE Sensor - No change; Signal Processing - ho change (Wide Range) Cl,C2,02 and 1 non-lE), Displaf - No change.

2 channels recorded 0-700*f- Al,B2 Yes Yes 1/ loop 1 IE indicator per Sensor - No change; Signal Processing - Add it.

       -{ Hot. Wide Range loop, each loop '        processing for 2 new displays; Display - Aco'2 it recorded                  indicators for loops 3 & 4.    (Note 1)
3. Wide Range 0-700*f .A1,82 Yes Yes 1/ loop 1 IE indicator per Sensor - No change; Signal Processing - Auo IL ICold loop, each loop processing for 2 new displays; Display - Aad 2 it recorded indicators for loops 3 & 4. '(Note 1)
4. Wide Range 0-100% of- Al,81,82 Yes Yes 1/ Steam I lE indicator per Sensor - No change; Signal Processing - Add IE St:am Generator span B2, D2 Generator S/G loop, each loop processing for 4 new displays; Display - Auo 4 lt Level recorded indicators, I per loop.

S. Narrow Range 0-100% of Al,BI,82,02 Yes Yes 4/ Steam 4 indicators (3 IE Sensor - No change; Signal Processing - ho change; St:am Generator span Generator and I non-1E) per Display - No change.

      . Level                                                                                    S/G loop. 2 points per loop recorded
      '6. Pressurizer         0-100% of span         Al,Bl.02     Yes     Yes      4/ plant      3 indicators (2.lE        Sensor - No change; Signal Processing - No change;
   -'? Level                                                                                     and I non-lE) per         Display - ho change.

plant, 3 channels recorded

7. Containment , -5 to 60 psig ~ 'A1,B1,82 Yes Yes 4/ plant 4 indicators (2 IE Sensor - Recalibrate sensor to -b to 60 psig; Signal Pr ssure C1.C2,02 and 2 non IE) per Processing - Hecalibrate channels to -b to b0 psig; plant, 2 channels Display - Recalibrate indicators.

recorded

8. Steamline' 0-1400 ps19 Al,BI,02 Yes Yes 3/ loop 3 indicators (2 IE Sensor - No change; Signal' Processing - No change 1 Prsssure and I non-lE) per Display - ho change. i loop, I point per '

loop recorded

9. R: fueling Water 0-100% of A1,02 Yes Yes 3/ tank 3 indicators (2 IE Sensor - No change; Signal Processing - ho change; Storage Tank span and I non-lE) per Display - No change.

tank, I channel recorded

10. Containment 0-600K gal . A1,81,82 Yes Yes 3/ plant 3 IE indicators per Sensor - Add 3 It wiue range transmitters; Water Level C2,02 plant, I channel Signal Processing - Ado IE processing for 3 (Wide Range) .

recorded indicators; Display- Add 3 lE inoicators ana recording. (hote 1) PRELIMINARY ASSESSMENT OF hote 1: Consideration being given to an integrateu . display system as part of the SPDS.

                                                                         . CONTROL ROOM INSTRUMENTS TO MEET REGULATORY GUIDE 1.97 3.1/03163 7376P/0637P

TYPE / QUAL NO. OF , VARIABLE RANGE / STATUS CAT ENV. SEIS CHAhtdLS DISPLAY IMPLEMEhTAll0N

10. Containment Later Al,BI,82 Yes Yes 3/ plant 3 1E indicators per Sensor - A00 3 lE narrow range transmitters; Water Level C2,D2 plant, 1 channel Signal Processing - Ada 1E processing for 3 (Narrow Range) recorded indicators; Display- Aad 3 lE indicators ana recording. (hote 1)
11. Condensate 0-100% of A1 D2 Yes Yes 3/ plant 3 IE indicators per See~or - Replace 2 existing transmitters with Storage Tank span plant, I channel 3 IE transmitters; Signal Processing - Aad lE processing for 3 new indicators; Display - Add 3
                                                                                                                                              ~

Level recorded IE indicators and recording.

12. Auxiliary 0-110% Al,Bl,D2 Yes Yes 1/ loop 1 1E indicator per Sensor - Replace existing transmitters feedwater Flow of flow loop, each loop with 4 IE transmitters; Signal Processing -

recorded Add IE processing for 4 indicators; Olsplay - Add 4 IE indicators and recording.

13. High Range 1-108 A1,81,B2 Yes Yes 2/ plant 2 lE ind'icators per Sensor - Specify range to 1 - 1D8 R/hr; Cont. Radiation R/hr E2 (Note 2) plant, I channel Signal Processing - ho change; Display - Neplace Level recorded indicators and add recording. (Note 1)
14. Steam Generator 10-6 _ 10-1 Al,E2 Yes Yes 1/ plant i IE indicator per Sensor - Add I lE monitor; Signal Processing -

Liquid Rad. Monitor pC1/cc plant, 1 point Add IE processing to indication and incorporate into P recorded RMS computer; Display - Add I ll indicator ano

   "                                                                                                       recording. (hote 1)
14. Steamline Rad. Later Al,E2 Yes Yes 1/steamline 4 IE indicators per Sensor - Add 4 lE monitors; Signal Processing -

Monitor plant, 4 point.s Add IE processing to inuication and incorporate into recorded RMS computer; Display - Add 4 lt inoicators and record all 4 points. (Note 1)

15. Core Exit 100-2200*F Al,81 C1 Yes Yes 2/ plant 2 IE redundant indi- Sensor - Opgraae to 2 channels of at least 16 IL Temperature with 16 cators per plant, thermocouples; Signal Processing - tacn channel to T/C per record the average average T/C reading, provide lE processing; Display-channel temp / channel Add 2 It indicators and recording. (Note 1)
16. RCS Subcooling 200*F subcooling A2,B2 Yes Yes 2/ plant 2 lE channels indi- Sensor - Add 2 It systems to determine RCS sub-to 35'F superheat cated per plant cooling; Signal Processing - Aud IE processing for indication; Display - Provice separate It inoication for two channels. (Note 1) i l hote 1: Consideration being given to an integrated display system as part of the SPUS.

Note 2: back-up variable to be aetermined. PRELIMINARY ASSESSMENT OF CONTROL ROOM INSTRUMENTS TO MEET REGULATORY GUIDE 1.97 3.1/03163 7376P/0637P I f 1 I l f l_ E E E

i i ~ ~ f e ) t a ) 1 S

                                                                                  -                -                         9M                                          u 1                                        r           Ss                                      e                        a       nR                                          e L<               St                          g         t       ga           h u         i

- o I ep mpg Ah n o na t A r e t a T i N iA i oc r eus a is s ( s w- ti g r t o

                              &Ae ebl e                 e        s                 s-                       ivo                                          e
                   ;o          e       d t           v         t         e            . e            my           nod                                        t .

H sdfl l a c g cy ea ora nS nanoa T l yf aa i v) ar o n oa tl mP iU

                                - go1 v    nb              r i              rl            sp                 J nl n                                                                                                                                                      s gpo                .nr i r asis si           P          d r

Pp ys h -  : SP il s Si 't y T isi Sit tiPe Ls measvpA S a la- o li D iga 4 e d a s t o ;e c c aD g wnl oh c re N 4l P n e n n ;, ip tt sri ocy( a1 %H g;r g; ig t ss rv(6 0 is is l n nsi T rod oa o 1 - S rd Sr pi eeD nf eo ef n bng i prl app . fend l on 0y

                                                                                ;t a on          ;t o        ms as          mc po;                                         v
                                -      ss        s pi a               a         sa                sa .                                                                it f              ant             Wlil                                                                             Se          irg                                          gr hii                   aDe emt h aas ol t p rcs eir rcg               c       uPn q                                               a cs                 .n         n                                                     ei n         t o                 i                                    gp se           sg;n             t csce            ei s         tdo              tdi            nr          el s                                        n net            li na i iv                     t nt              t nd           ep              as                                    is ydl         gD            iia               iir                        gne oca              eSoh              wrna            n              m          c      m o i d d

n gc ea ior) n' ic b sra1 n;t saiv m a; re g , n s2i s2c n e cn iio m R i spp ee aeao hl cw tide irdl en arn roi d arr A ro ca tSr s p ne ot fEst cpit mpap t a tf tfd t o l i; xel . i s I o ud i m ah E n sr egaT t y as E eN Eonr l 4 a rc E gI Ega ot I dd( l cio 1 s b 1 n l n Pn nnR e a gC r ey 2nro di f E y io. i2 is o . cri N 2Av I ,ay l N% 2s d a O o. ron 2sr acT a sa M I T d - d rs Pl defo dh i depa d vsm sl r c a e 0 1 ded dcA sd det dca so drC d o R ll pl rv euo i il sp ns A Ag e AT gt Alii H g0 Ao Aoc Af y oi T nn na aDr n r- Rff n Cd h - i n - nic - v ; p - i o - p - pd ri

                                                                                                                - r b                o L          s ya             osi                                                    y                                 - rri M      rsah                                                   st                                    n        ey         eet                                     :

L oel c risd rss4 rs rEa rEi rt a rvt a ot en ose1 oee oil oI oul oouc 1 M L P scp noso scci nno sav npl r non scg s nds p s E spp nms s c pi n e eoonmd M eriw eyao ndl t I SPDt eurE SJp1 era edi ed eoi o Sbvf SPr SAD SA2 Scd Stci N r n t d n i d n s e p p r e l r e p r e p l l it it se n n t h rn se . se sa sa g on rn on rn ll ll i t a t a on O ep ep ta n l n n ah ah ah pT7 cc cc cc nr ae nr ae f o i i OS 9 Y h p hp dId n e dId n e idId n e T T1 A L c d c d r i ,d i ,d i ,d N EDNE P Ee i e t r t r t r E Ee av l S I t a lt a pl E no I ac Eno Eno 1 ac I ac T T M MI S U U ~ I D 2c 2c 1 v a 2pr l e l e l e R R SR G 2pr 2pr C C f ETY SSR d SNO AI T S L t t e t t e n/ YMA ROL FE n n v n n t / i r R Oh a a l a a n a S bo AOU

     .NA l

p l p a v l p l p l p-St An ntt oin NRG I E OH Pa cna IMOL R

            /                /                /               /              /

NC 2 2 1

                                                                                               /                  l            ol 2              2                 2             I p         I     mp                                       LRT ETE RNE R   LE S

I Y s e Y s e Y s e s e s e s e o s e POM C AS Y Y Y N Y U Q . V s s s s s s N e e e e s E Y Y Y e e o e R Y Y Y N Y

   /                        2                                                                  I ET                                                         I 2                 B                         2 R   PA YC      1 C,

2 2 C. 1 C, l

                                                                                                  ,                      E, T       B                8                 C l1            3           2 8              C                 AC            C           C l

f S  % U 0 d g T 0r e 2 2 A 1 e g i $ s s 0 0 T w o i s so 1 :1 R S

      /
              - po                            l C

p 0 p G aj c s

                                                                                                                                                 - cecn cc E

G

          %                   r~              /               %              0                 0                               _ c 8l                  e                 n             0              8                                            e /                I /              /

N - l t e 5 l6 1 g 1 1 A 0u a p 1 1 3 A b- C r- Cl - C R 1F L O / o0p a0pa0p 7 0 0 0 N

                                                                                                             /

N1 P1 H1 f y t l e e i t - x s~

                                                                       .       r                               v          n                                                           -

u s te t u) e) i a - l e nv t n ne se sg re ug t ll . F V el ec en c Pe - ma sn A O n rl nV mn no ra sa re v - o oe i PR eR S oL r iC r C P E t t v ce an a .d Pd R . . 7 L u to t n t e e g 33 aL ni ne td B e e ot s og nd Sd .n na 66 A N R r Cau Co on Cn 4i oR 1 0 I e Ce Re 2l C 3/

                                                 .l    t             r                                             p                                                            0P O      R A

V 7 8a

                               .t 9st oa 0y
                                                                  .d 1E
                                                                                 .tx 2E
                                                                                                  .t x 3a
                                                                                                                ,m          .t n                                                /6 7

1 1W 1IS 2H 2( 2( 2S 5e 2V 1. 37 3 1

                                                                                                                                           -          llI           If LIl         lL

TYPE / QUAL NO. OF VARIABLE RANGE / STATUS CAT ENV. 5EIS CHANNELS DISPLAY IMPLEMENTAllON *

26. Adjacent Bldg. Vent: C2 Yes Yes 2 vent mon. 2 IE indicators, Sensor - ho change; Signal Process'ing - ho change; Ridiation Level 10-6 _ 10-1 per plant I per vent. mon. Display - Aud recording.

pC1/cc 5 area non. I channel recorded, j Area; per plant CRT display for area 10 104 monitors mR/hr

27. Site Environmen- N/A C3,E3 No No N/A N/A Sensor - Portable sampling.

tal Radiation Level

28. Pressurizer PORV Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - Add 2 1E valve position inaicating cevices; Status valve, 2 valves per Signal Processing - Add IE processing as require,a plant for sensors; Display - ho change.

l

29. PORV Block Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - ho change.

Valve Status valve, 2 valves per Display - No change. plant

30. Primary Safety Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - Add 3 lE sensors, I for each valve; Valve Status valve. 3 valves per Signal Processing - Add IE processing as requireu
     ,                                                                                  plant                   for sensors; A                                                                                                          Display - Ada 3 pairs of lights for valve status.

l 31. Pressurizer Open/ Closed D2 Yes Yes 1/ bank I pair of lights per Sensor - Add 2 lE sensors; Display - Add Heater Breaker (Note 3) bank, 5 banks per 2 pairs of lights for bank status. Position pressurizer

32. Charging System 0-500 gpm 02 Yes Yes 1/ plant 1 IE indiator per Sensor - Replace transmitter with 1 IL transmitter; i Flow plant Signal Processing - Add IE processing for 1 l indicator; Display - Replace existing indicator

! with I lE indicator.

33. Letdown Flow 0-500 gpm D2 Yes No 1/ plant 1 indicator per plant Sensor - No Change; Signal Processing - No change; Display - ho chanoe.
34. Volume Control 0-100% of D2 Yes No 2/ plant I channel indicated Sensor - No Change; Signal Processing - ho change; Tenk Level span per plant Display - ho change.
35. CVCS Valve Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - Add 14 lt limit switches, replacessient'for Status valve, 27 valves existing non-lE limit switches; Display - ho change.

Note 3: Two channels are IE and three charitiels are hon-It. PRELIMINARY ASSESSMENT OF CONTROL ROOM INSTRUMENTS TO MEET REGULATORY GUIDE 1.97 3.1/03163 7376P/0631P I 1 f l _ __ f I_ E E E E __

A f~~"i f7 O J~~l M T7 T7 M T7 fl f~~l n C_ O_ Il fl_ I~ ' l I ~ 1 .__ J TYPE / QUAL NO. OF VARIABLE RANGE / STATUS- CAT ENV. SEIS CHAhhELS DISPLAY IMPLEMENTATION

36. RCP Seal 0-20 gpa D2 Yes Yes 1/ loop 1 1E indicator per Sensor - Replace 4 existing transmitters w/4 it Idection Flow loop, I channel per transmitters; Signal Processing - Add IE loop recorded processing for 4 indicators; Display - Aad 4 It indicators.
37. S/G Atmospheric Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - Replace 4 existing l'imit switches with 4 PORV Status valve, 4 valves per IE limit switches; Display - ho change.

plant

38. N in Steamline Open/ Closed 82,D2 Yes Yes 1/ valve 1 pair of lights per Sensor - Replace 4 existir..; limit switches with 4 Isilation Valve valve. 4 valves per IE limit switches; Display - No change.

St:tus plant

38. min Steamline Open/ Closed 82 D2 Yes Yes 1/ valve 1 pair of lights per Sensor - Replace 4 existing limit switches with Is*lation Bypass valve, 4 valves per IE limit switches; Display - No change. (hote 4)

Valve Status plant

39. S/G Safety Valve Open/ Closed D2 Yes Yes 1/ valve I pair of lights per Sensor - Add 201E sensors for valve status,1 per Status valve, 20 valves per valve; Si<jnal Processing - Aad il processing as plant required for senors; Display - Aoo 20 pairs of
   $,                                                                                                                        lights, 1 per valve.
40. h in feedwater Open/ Closed D2 Yes Yes 1/ valve I pair of itghts per Sensor - Replace 4 existing limit switches with 4 Control Valve valve 4 valves per 1E limit switches; Display - No change.

plant ,

   -41. Main feedwater. Open/ Closed.                       D2        Yes    Yes      1/ valve    1 pair of lights per   Sensor - Replace 4 existing limit switches with 4 lE Control Bypass                                                                                  valve, 4 valves per     limit switches; Display - ho change.

Valve Status plant ,

42. N in feedwater .Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - No change; );

Isolation Valve valve. 4 valves per Display - No change. Str.tus plant '

   '43, min Feedwater       0-110%                              D2       Yes     Yes      3/ loop    3 lE indicators per     Sensor - No change; flow                    of flow                                                                  loop. I channel         Signal Processing - ho change; Display - ho change.

recorded per loop

44. S/G Blowdown Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - ho change; -

Isslation Valve valve 4 valves per Display - ho change. Stitus - plant l Note 4: These implementation changes are previously PRELIMINARY ASSESSMENTOF CONTROL ROOM INSTRUMENTS TO o vafv t . MEET REGULATORY GulDE 1.97 3.1/03163 7376P/0637P

TYPE / QUAL NO. DF VARIABLE RANGE / STATUS CAT ENV. SEIS CHANhELS DISPLAY MPLLMthTATIuk

45. Total NHSI Flow 0-2000 gpm D2 Yes Yes 2/SI train 2 indit.ators per Sensor - Replace o transmitters with b lt Si train transmitters; Signal Processing - Aad It processing; Display - No change.
46. Total LHSI flow 0-5000 gpm D2 Yes Yes 2/S1 train 2 indicators per Sensor - keplace b transmitters with 6 IL Si train transmitters; Signal Processing - Add IE processing; Display - No change.
47. ECCS Accumulator 0-700 psig D2 Yes Yes 2/9nk 2 indicators per Sensor - Replace I transmitter per tank with I lt Pressure tank, 3 tanks per transmitter per tank. i plant Signal Processing - Add il processing; Display - Aud '

3 IE indicators.

48. ECCS Valve Open/ Closed 02 Yes Yes 1/ valve i pair of lights per Sensor - Replace J limit switches with 3 It limit Status valve, 45 valves switches and add I lt limit switch; Display - Add 2 pair of lights.
49. Auxiliary Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights par Sensor - Add I lt limit switch; Feedwater Valve valve, 14 valves Display - No change.
   $5tetus
50. Cont. Spray 0-110% D2 Yes No 1/ train 1 indicator per train Sensor - No change; Flow of flow Signal Processing - No change; Display - No change.
51. Cont. Spray Open/ Closed D2 Yes Yes 1/ valve I pair of lights per Sensor - No change; System Valve valve, 9 valves Display - No change. l Status
52. Cont. Spray On/Off D2 Yes Yes 1/ pump 1 pair of lights per Sensor - No change; Pump Status pump, 3 pumps per Display - No change.

plant l

53. RCB Fan Cooler 3-4 in, water D2 Yes No 1/ fan 1 indicator per fan Sensor - keplace 6 existing switches with b IL Diff. Press, switches; Signal Processing - Add IE processing; Display - Add 6 indicators, I per tan, i

l 54. CCW Header 0-150 psig D2 Yes Yes 1/ header 3 indicators per Sensor - Replace existing transmitters with 3 IL Pressure plant transmitters; Signal Processing - Aad il processing; Display - No change.

55. CCW Header Temp. 0-250*F D2 Yes Yes 1/ header 3 indicators per Sensor - Replace 3 existing TL's with IE temperature l plant elements; Signal Processing - Add it processing; l Display - No change.

PRELIMINARY ASSESSMENT OF CONTROL ROOM INSTRUMENTS TO 1 MEET REGULATOliY GUIDE 1.97 3.1/03163 7376P/0637P l l f L __J L_ _ M E E E E

3 O O O O O O O O D FW D D D .O I 1 _] ~ \ .O fI TYPE / QUAL NO. OF - VARI ABL E RANGE / STATUS' CAT ENV. SEl$ CHAhhELS DISPLAY IMPLEMENTATION

56.-CCW Surge Tank 0-100% of span D2 Yes Yes 1/ tank 3 indicators per . Sensor - Replace existing transmitters with 3 It Level section plant transmitters; Signal Processing - Aad IE processing;
                                                                                                                          . Display - ho change.
57. CCW Flow to ESF 0-110% of flow D2 Yes Yes 1/ESF 9 indicators per Sensor - Neplace existing transmitters with 9 IE .
           . Components                                                               component     plant                  transmitters; Signal Processing - Add-1E processing; Display - No change.
58. CCW Valve Status: Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - Replace 4 limit switches with 41E limit valve,'68 valves switches; Display - ho change.

59.'ECW System Flow 0-1101 of flow D2 - Yes Yes 1/ESF .1 Indicator per Sensor - Add 1 1E sensor per major LSF component; component major ESF component $1gnal Processing - Add 1E processing; Display - Add 1 indicator per major ESF component.

60. ECW System Valve Open/ Closed D2 Yes Yes 1/ valve 1 pair of lights per Sensor - No change; -

Status valve, 9 valves Display - No change.

61. ESF Environment Later D2 . Yes Yes Later .Non IE indication or Sensor - To be determined; Signal Processing - To be annunciation for each determined; Display - To be determinea.
    .>                                                                                             ESF area (to be
    '4 determined) 62.' Standby Power-    ' Sus Specific         D2         Yes -Yes         1/ bus       Non IE indication      Sensor - To be aetermined; Signal Processing - To be and Emergency Source                                                                  and/or annunciation     determined; Display - To be determined.
          - Status                                                                                for each power source        *

(to be determined)

62. Other Energy 'Later D2 Yes _Yes .1/ source Non IE indication or Sensor - To be determinea; Signal Processing - To be sources important annunciation for each determined; Display - To be determined.

ta safety (e.g. source (to be deter-

hydraulic, pneumatic, mined) 382 ) l
63. RHR Heat- 50-400*F D2 Yes Yes 1/ heat 3 1E indicators, 1 Sensor - Replace 3 existing temperature elements with
       ' exchanger Discharge                                                         exchanger   per heat-exchanger.      3 1E TE; Signal Processing - Aad IE processing for Temperature                                                                            record each channel     indication; Display - Add 3 IL Indicators, 1 per heat exchanger.
64. RHR Flow- 0-110% of flow D2 Yes Yes 1/ train 1 1E indicator per Sensor - Heplace 3 existing transmitters with 3 IE train transmitters; Signal Processing - Aud it processing; Display - keplace 3 existing indicators with 3 lt indicators
       - 65. RHR Valve Status Open/ Closed               D2         Yes     Yes      1/ valve     I pair of lights per   Sensor - ho change, valve 11 valves         Display - No change.

PRELIMINARY ASSESSMENT OF , CONTROL ROOM INSTRUMENTS TO MEET REGULATORY GUIDE 1.97

      '3.1/03163 s 7376P/0637P                                                                                        ,
k. -

TYPE / QUAL NO. OF VARIABLE RANGE / STATUS CAT ENV. SEIS CHANNELS DISPLAY IMPLEMENTATION

66. Reactor Trip Open/ Closed D2 Yes Yes 1/ breaker 1 pair of lights per Sensor - No change; Br:aker Position breaker 4 breakers Display - No change.
67. Turbine Stop Open/ Closed D2 No No 1/ valve 1 pair of lights per Sensor - No change; Valve Position valve, 6 valves Display - No change.
68. Turbine Throttle Open/ Closed D2 No No 1/ valve 1 pair of lights per Sensor - No change; Valve Position valve 4 valves Display - No change.
69. Auxiliary feed- On/Off D2 Yes Yes 1/ pump I pair of lights per Sensor - No change; tater Motor Driven pump, 3 motor driven Display - No change.

Pump Status pumps

69. Auxiliary feed- 0-5000 rpm D2 Yes Yes 1/ pump 1 turbine speed indi- Sensor - Replace turbine speed sensor witn a It e ter Turbine Driven Open/ Closed D2 Yes Yes 1/ valve cator, 1 pair of sensor; Signal Processing - Add IE processing; Pump Status lights for each steam Display - No change in panel design; ) inoicatur supply valve for turbine speed yet to be purchaseo.
70. SI Pump Status On/Off D2 Yes Yes 1/ pump 1 pair of lights per Sensor - No change; pump, 6 pumps Display - No change.
      $71.ECWPumpStatus        On/Off               D2          Yes    Yes    1/ pump       1 pair of lights per   Sensor - No change; pump, 3 pumps          Display - No change.
72. CCW Pump Status On/Off D2 Yes Yes 1/ pump 1 pair of lights per Sensor - No change; pump, 3 pumps Display - No change.
73. Control Room 10-6_jo-IrC1/cc E2 Yes Yes 2/ plant 2 IE indicators, 1 Sensor - Recalibrate range of monitors; Signal Radiation 10-I-104 mR/hr Yes No 1/ plant per vent, Mon., 1 Processing - Proviae RMS computer for processing; channel recorded, Display - Add indication on CRT on demand CRT add recording for I vent. monitor.
74. Fuel Handling 10 E2 Yes No 10/ plant CRT on demand Sensor - Recalibrate range of monitors; Signal Building Area 104mR/hr Processing - Provide RMS computer for processing to Radiation Control Room indication; Display - Ada Control Room indication via Lkl.
75. Access Area 10-I - 10 4R/hr E2 Yes No 8/ plant CRT on demana Sensor - Ada 8 area monitors to cover the indicated Radiation rartge; Signal Processing - Provice kMS computer for processing to inoication; Display - Aud Control koom i indication via CRT.

l l 76. Non-headered 10-6 103 E2 No No 1/ plant I indicator per Sensor - Ada 2 monitors, I for cos. denser air ejectur l Effluent Radiogas p C1/cc plant, 1 point and 1 for gland seal exhaust; Signal Processing - Concentration recorded Frovice RMS computer for processing to indicatiun;

                                                                                                                            ~

PRELIMINARY ASSESSMENT OF CONTROL ROOM INSTRUMENTS TO MEET REGULATORY GUIDE 1.97 , 3.1/03163 7376P/0637P

    /    }   f     1 J      L M            E     E           E

7 R R I 1 M T1 M R R M FI f~~"l n .n O n M _R M C TYPE / QUAL NO. OF VARIABLE RANGE / STATUS CAT ENV. SEIS CHANNELS DISPLAY IMPLLMENTATION

77. Concentration 10-6 E2 Yes No 1/ pathway CRT on demand Sensor - ho change; Signal Processing - Provice RMS from Liquid Pathways 10-I pCl/cc 3/ plant computer for processing to indication; uisplay - Adu Control Room indication via CRT.
78. FHB Vent 10 E2 Yes Yes 1/ plant 2 IE indicators per Sensor - ho change; Signal Processing - No cnonge; Radiation 10-1 pC1/cc plant Display - ho change.
79. Effluent Path 0-110% of E2 Yes Yes 1/ pathway CRT on demand Sensor - Add I le anonitor for the consnon plant vent Flow Rate design flow and a monitor for each of the following: Gland Seal Exhaust, Condensor Vacuum Pump, and 3 liquio pathways; Signal Processing - Provioe RMS couputer for processing to indication; Display - Provioe Control Room indication via CRT.
80. Meterolcgical N/A E3 No No 15/ plant CRT on demand Sensor - HL&P responsibility; Signal Processing -

Parameters HL&P respons10111ty; Display - To be oeternsinea.

81. Control Rod 0-258 83 No No 1/ rod Digital Rod Sensor - No change; $1gnal Processing - No cnange; Position Indication steps Position Indication Display - ho change.

s PRELIMINARY ASSESSMENT OF CONTROL ROOM INSTRUMENTS TO MEET REGULATORY GUIDE 1.97

  • 3.1/03163-l 7376P/0637P

HOUSTON CONTROL ROOM IGHTING DESIGN REVIEW [ _ ._ . POWE R C.O. [ { APPENDIX B PANEL DIAGRAMS SiiOWING THE [ KNOWN DEVICE ADDTTIONS [ [ [ [ - [ [ [ E [ . E E 7 9979P/0787P L ____ - _ - _ - _ _ -- _ _ _ --J

a E E [ S 85  ! se HOUSTON -? sig M fi CONTROL ROOM LIGHTING

                                $ hii@5          ya        $                        DESIGN REVIEW

( . ..R,,h(h OWER CO.  != :n ES

                                                 =   s~~
                       -                                                              N g

g [ o 7338 :522243 p2 s l

g. ;-

p.,l -lp 33 p rp S'$ D @< j

            - - -                      i               y                                     .

O ge l n ==N 'P* p @ 2 8s M M *Y se e f i 8  : pie s [ y pe W W 28 r em 332 2 200@2 85 85 i " EE EE I # 28: l '- EE 28 W D WUp [ ' S p # 28 m c:np l I r., g me se gp me se [ ~ 8 i"  ! 2g WW2 WW

                                     .                         Sg          @ XD: 28 9 [
                                                                       @0 @ @28 %>

2 [ *l

                                                                       #E          Em
                           =

E EmEm [ m 22 28E EeEs 22 mes sene E 8 28 ao ss 28 28 [ ' 8 w em me es g a t me as a me :c as i me s as e i [ "a WW WE WE i 8 - w ge ga s e " ge [ a og SS 25 C3 C ao ao m ae gg ae m E

                               }-      .

ER

                                                      = e 80 30 Essesi E

01 6 E t as e - [ "l@0 8 DDD e e e ns i J ODDe EEen [ i [ DEVICE ADDITIONS 1 ESFTRAIN A [ B1

e 5 ee a m a ii "B Ee 5 m s= HO USTON . 595i'5 S1E? CONTROL ROOM LIGHTING 5 ** E "5El DESIGN REVIEW eum ms & 5 **%" s R$5E

 ,PR,,OJE9 POWER CD.                              Ea w <            - <-

E .... a c2 y cp 33 2 i m

                                                    %.4 a                 *h C E CD2 D                              f               l
                                                                         , . ,.          , g3 g ,                   g
                               -~ n F gH                      H
                                                                                / 238        GN U3 @ J              E               I T-                                p               .% yc4                 yy                  l               l
                                               ;"!                        - - - -t    33N 43 8 ##                   s
                                               !     3:p                 8            NE 3333 2 Sep                E!

U!d '" WE B3 B3 8 mi 0 ** 1 r si . HE EEg 33 330 1 5! H. ,p EE B3 B3 2 33il# I i YJ jd p 23 :p :p 23i:2 I' "!. R t.- , 22 @@S 33 33 l s i . 22 au s ub 23 33 2  ! i"d 22 E 33 @ @g 23 33; d !p E $$$ $2 l

                                      .;                  8              id E 23 E E E%IE]EE l

i p 23 EMIE]E#IEG$g 7 _ _ _ _ _o . -m .-. 33 g[g]gIs)g[g)g[g] :D i 8 ' s u3 nd n$ sa l yl, g* _. 23 33 33 33 33 33 23 W 23 c 23 33 D 23 :D 33 " W 33 E, y! g g w 23 33 E @E l 3 H H  ; 33 " l 33 s3 :23 [Hi 3333 c G m3 23 li "" 23 23 g gy 23 g R3 i j M , 23 m :n . l

                        " ~--~ -

3 O 8 lE 333333 g

                                            .I..[US CE 1p E 4 33                                                                     l 8

oC 00 E I;--$ EEGE g l

                                                     ; DDDE                            !d   E :e E          M l
                                                                                                                                     ~

DEVICE ADDITIONS ESF TRAIN B B2

b [ HOUSTON CONTROL ROOM LIGHTING a ji m! $= e E!! ag DESIGN REV/EW { gE POWER CO. ,,j $ gg?g yh,55 I 55 @ ESS [  % s~c= s ca~

                                    $                  U     ,
                                   .5,a                i     e

[ o [ O 0y E *U.F E ce $2 C#288;g,  ! gg W" i gR eE WWw a 8 [ __ pg WWE W #,4 E mj SE EEk # #" s WD [ . g -1

                             ]
                             . I
                                          -@                       SE WW2 WW2       gg gas e

E mi E WWW WW e! i

                        !J!             -

E W- WSS W-i [  ! E E W W W) W is ml 4 u-_ a

p ggy s i*

9 l Id - WE E ' e WW WW WW

                  ,             1 a  rv,                               p                        W WW WW

[ v. 4 9 8 J a sh ## ##

D W k WW 5 L- "

mg WE WE

                                       ;b                D                          W gTE :p

[ l '~y rs pp o p g C C:11 9 ] W fm *x* WW W gQW [ y W xL h

                                          @s 1

R EEWWWe j']l [ F7 y,DD De ud m E4 We j D s !EG eeem' , [ L [0DDDs i=3 EE sp [ [ [ . DEVICE ADDITIONS ESF TRAIN C ( B3 f _ . . - - - - - - s

e

 '                                           as 5$

HOUSTON 5 ,5i!! CONTROL ROOM lu LIGHTING a

                                       !**5 u   - =-

S E **~ DESIGN REVIEW

     ,PROJE9 POWER CO.                 5             S
                                       !E            h3
           -                                                           ~

bbbb

                                                ~~

some  ! E5,a . 3

                                                                 .              lB31331331B3 m3 u3 e e                 le           l
                                          & w ',-                  '

33 33 e 33 8 5 i

                                                                       @         e 23 23 23 mammmmm                   la           l 23 33 O                 e m3 e c            ,,,3    >

N3 g w w 33 33 ,3 $ 23 e R wa Gi e3 45 3 e n3 ia E i es

                        ,                                 ig           h,        wo e e 33                               l 1                       g3            in        EGG 90s i                           gg o               D 23 e D                                g t
                                    .,                   l$gg te                           13 13 1

s ngg u,a w w it uw> nt a I eC ib i i l

                                 .        ,5h' 5                            =
                                                                                 .1%5111153 m                            q, e

i enewe l 33 33 w 3 ewe

                                                                         -'l     e ,3 2 33 00 E3 43 33 l

r8 e ma m am m3ewis e, e i <

                                                         ##g am ,.m y <mmmmm   ,
                                        .              .j"1;           i
                                                                               ! ji l

( , I i,

                                                        .g-                    l g

H DEVICE ADDITIONS CHEMICAL & VOLUME CONTROL - 04 -

e ' J* r I EeNE Ez!M

              -                       'a t.

a - og g >OOR Om g %5mE r  ! S aE$ g. i

                                      'S   E      '

s u '" G

t. '

u NAH t n " ie 3 r t s  ?

  '                   c, t%u r.

s?" T t

                                      =' DC $y E
                      ,                     A c      212            PI  \
                      ,           3         C r                     ,                     l i
                      , na                  N "
                      , A A ^

r '

                                   -]

{ 1

                                   -{
                                   .                           m aE ~
                                   .[
                                      ]             _                E                  _

r "-- _ l ~ Q e mW _ I

                           ^

_[ . g uEWg . m r

                                                            = n8ag       .
                                                                                   =

e !u s,il=

                                               )

r g$ hah e $ 5MD r

                                               )
                                                    .  .      m I a,!

a I g r .

                                               ).

_h @

                      .)

g .

                      .1
                                   }                          e$5                               _

r _1

                      .[
                                                    .         e$8 E v0 9 ;
                                               )

m r . _a 0 9m m5Mg a a r ) m 5 sS

                  -                                           o
    '                              . [.             .

n n n _ n o25b0 ! .

                                  =
2 O k 0z -

n E t - , lllljllllL

s S r e E tst G og h 2ooB3 C e bcNE ig N A e hzd5 E S L-s H C . g h mM5m% 5E$ g. G N A H S tut t a r M B D S ET u C N W O 7 21 1 A P I C I T . n N d N . . K A A A yjL s . es o n _[ 0 u a ee f[ 1e m ws ~-]1. 1 e % E c su

                   '  il            ;

st _ ee g

                  ~
                  ~
                                                                           -Ee
                  ~

ms

                  ~                 -               .

rI >[ Dx

       ,e
            +
                                                                      =u
                                                                      =es  Ie

_ st . _ eE g s r g

                                 ']                   .     ."   -

mu

                                                                       =

Ee Dx

                                                                       =es
                -                  *_             .       .                Ie st          _
                                                  .                   ee           _

s E% d ms uu Dy n s Ie l une 9g 9ye

                         -                        .        .          t s 9g t  u9eg-t: s9m g            m=g 9 ea g

g u* O5

                                                 -               mM

llIl F a g - Lt II s , s r e o i-e t c M *ocN0* a e M" M e 3  : - S ^ a 2Ooit g=gvM5mE l a ML C@d2* E G N 0 4 9 s a c o s nnva ad e Mtr Be ic o0g M i s#cE5 nO. A H C N 2 6 1 r t a r i , u3' SV 12 W c i O d t d 1 N d $

~
~

K A ^ .d I n _ _ H2 n u- _. 3 =. _ H2 ag' bi . n t l

                                 =
                                 =

_ o-r, SS@ = t - mJ SS@ n .1

                                                                                 ~1 OncD                                            Fap         '

y s^ 3i _ Hugg m n vU MMg pg _

                                         ~O' - ey..                           8a 9 "           "

n c 3 W u" um W g u" E g W e* u" E g m.

                                           ]l - ]s                            Ba W R                     u                                                            ]

Mu J J =

                                          ]l               j.

d

                                                                                  ]

I Eu %J J 8a W_ Mu JeJ R ]. . gw g [ ' fJ. gwQ E 5 EasHsg uE R y E ]l Mu~1.sJ c. j*_ ] gu H. M c l.s J R w gw H.. Eg g x l l

                                       "   "                                  gwH                uhs
                         =.

[ gwH E E u u"" uf l, ygWg gu ".. R ,

                                                        ..l                                 h, g m g m H gmgu gw"a M

p U* Um U~ g gu n. U*HogugH*Hmy g l. gu u. H*HmEwg O . l f R 02 >g dO y"09n? gzOmzy

                             > 0 2agezO g>.5                                             -

l =a ~ 1 I \I' ll1 ll

I il!' j s O

               =                ac r

c , g r- m8=

        ,esz   =

o s c a u o o c g' eom, y "' g =m5* c u w n , i c, t' o , m ~ , u x > , a OO 00 2 O 0 0O22 oO 0 0 2 6_3 f d

                                                                       +              <

oC 0 0 g QO22 2 W +_

                                                      '                +
                                                                       +       =

c, 0 2 i f

                                                           +              -

g00 2 $

   ),        '

00O22 + S O

                                                                       +     S 00 2                                           +     6 gC0d             2 2                            +     5

_ i - ' Q O0 2 " - gO 0Q22 E a

                                                                       +

O0 2 + O0Q22 + 0 00 2 " - 0 00Q22 . a0 0 0 2 4 cC0DO2BH p" + _

                                                                          =n C00nH H                                                            M 00 e N A                                  =

_QO60 E U

                                                     *W                   =                m
                                                                                           \

I 1

                                        $8l" P5HE5l3             ."

l

                                                                                           \

I

                                                ,l1                ,l<          lllll    l

GantroliRonm_:D_e:sigvEReDiew t c Special Studies Report [ [ [ [ [ [ [ , [ E [ The SouthTexas Project _ E

     . HOUSTON LIGHTING & POWER COMPANY