Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML103610273 + (Response to 11/19/10 Questions Re; NFS Biannual Effluent Monitoring)
- L-75-600, Response to 11/26/75 Letter Furnishing Information on Reactor Vessel Support Program + (Response to 11/26/75 Letter Furnishing Information on Reactor Vessel Support Program)
- ML033290170 + (Response to 11/5/03 Email from NEI)
- ML20133B460 + (Response to 11th Set of Interrogatories Re Emergency Planning.Certificate of Svc Encl.Related Correspondence)
- NL-04-0287, Response to 12/12/03 Request for Additional Information Regarding Application for License Renewal + (Response to 12/12/03 Request for Additional Information Regarding Application for License Renewal)
- ML051180407 + (Response to 14/12/05 Memo, Request for Fee Exemption for Participants in the Pilot Plant Reviews for Power Station Transition to 10 CFR 50.48(c))
- ML19249C556 + (Response to 15 Petitions to Intervene Filed by Mj Ancarrow, B Blatt,J Blue,L Brode,Sm Brown,Jd Chilcoat & Others.Urges Board to Deny Petitions or to Require Petitioners to Repeat Paragraph 4,containing 15 Identical Statements,Under Oath)
- ML20087P415 + (Response to 17th-20th Sets of Interrogatories & Requests to Produce.Certificate of Svc Encl.Related Correspondence)
- NL-11-062, Response to 1OCFR2.206 Petition Submitted by the New York State Attorney Generals Office Regarding Fire Protection + (Response to 1OCFR2.206 Petition Submitted by the New York State Attorney Generals Office Regarding Fire Protection)
- ML18114A232 + (Response to 2/10/1978 Letter Requesting Information on Steam Generator Operating History, FP&L Submits New Schedule When They Can Supply Information)
- ML18096B497 + (Response to 2/15/1977 Letter Requesting a Revision for Technical Spec Figure 3.4-2a) to Provide Additional Margin to Assure Compliance with Appendix G to 10 CFR Part 50)
- ML18114A240 + (Response to 2/2/1978 Letter, Information Regarding Cavity Annulus Seal Ring Is Provided)
- BSEP 05-0066, Response to 2/25/2005 NRC Staff Guidance for Use in Achieving Satisfactory Compliance with 2/25/2002 Order Section B.5.b + (Response to 2/25/2005 NRC Staff Guidance for Use in Achieving Satisfactory Compliance with 2/25/2002 Order Section B.5.b)
- ML020810007 + (Response to 20 Day Request and Answer to NRC Order for Interim Safeguards and Security Compensatory Measures)
- ML082480044 + (Response to 2007 Steam Generator Tube Inspection Report Request for Additional Information)
- ML082390706 + (Response to 2007 Steam Generator Tube Inspection Report Request for Additional Information)
- W3F1-2013-0022, Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 + (Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805)
- ML24012A196 + (Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and)
- NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device + (Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device)
- ML18088A856 + (Response to 3/10/1978 Letter. Submits Affidavit of Messrs. Kent, Bivans and Flugger, and 12/14/1977 FPLs Response to NRCs Questions Concerning 5/16/1977 Outage Enclosed)
- ML22342A424 + (Response to 3/12/2012 Request for Information Enclosure 2, Recommendation 2.0, Flooding Focused Evaluation Integrated Assessment Submittal Revised Commitment Completion Date)
- ML18088A858 + (Response to 3/16/1978 Letter Requesting Additional Information Regarding FPL System Disturbance Which Occurred 5/16/1977)
- HNP-10-040, Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants + (Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants)
- ML19093B093 + (Response to 5/19/1978 Letter Which Requested Information Concerning Additional Ownership Participants. Provides Answer to Question No. 9 in Appendix L of 10CFR50 for Old Dominion)
- L-2010-131, Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 + (Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196)
- L-2023-162, Response to 50.69 2nd Round of Rals + (Response to 50.69 2nd Round of Rals)
- ML18219A012 + (Response to 6/27/1978 Letter, Which Transmits IE Bulletin No. 78-10 Entitled Bergen-Paterson Hydraulic Shock Suppressor Accumulator Spring Coils)
- ML112212277 + (Response to 6/30/2011 e-mail from Steve Dwyer (Smdresearch@Hotmail.Com) to Chairman Resource - New San Onofre Nuclear Generating Station Seismic Threat Beyond Design Criteria)
- ML20067D118 + (Response to 680731 Inquiry.Phrase Undue Risk Has Origin in 10CFR50,Section 50.53.Forwards Memo Prepared by Regulatory Staff at ASLB Request in Proceeding for Const Permit for Facility Encl)
- ML19329F377 + (Response to 710107 Motion of Intervenors Saginaw Valley Nuclear Study Group,Et Al.Discusses Saginaw Intervenors Motions Re Document Production & Witness Identification)
- ML20058K606 + (Response to 740220 Request for Info on Supplemental Radiation Exposure for CY73)
- ML19220B257 + (Response to 751023 Request for Review of Structural Info. Strength & Chemical Tests on Cubes of Grout After Seven Days Not Performed by Applicant)
- ML19206A738 + (Response to 770415 Motion by Intervenors Citizens for Safe Environ & York Committee for Safe Environ to Compel Applicant to Provide Witness to Testify Re Contention 5. Certificate of Svc Encl)
- ML19344D796 + (Response to 770520 Motion to Allow Rebuttal Testimony, Stating No Intention to File Surrebutal Before Aslb.Part of Licensee Rebuttal May Be Improper Due to Failure to Meet New Info Test.Certificate of Svc Encl)
- ML20148G763 + (Response to 771118 Request for Info Re Dependence of Input Motion Frequency on Fuel Grid Impact Loads.Concludes That Variation in Amplitude & Frequency of Input for Combined seismic-LOCA Analysis May Change Grid Spacer Deflections)
- ML19220A358 + (Response to 780317 Memo.Does Not Feel Any Plant Operating Limitations Would Be Appropriate,Pending Submittal of Addl Info or Completion of Generic Task.Forwards Draft SER Suppl)
- ML20148A298 + (Response to 780515 FOIA Request Originally to Dos.Informs of Availability of Four Documents in Pdr.W/Encl List of Documents Being Placed in PDR)
- IA-78-255, Response to 780515 FOIA Request Originally to Dos.Informs of Availability of Four Documents in Pdr.W/Encl List of Documents Being Placed in PDR + (Response to 780515 FOIA Request Originally to Dos.Informs of Availability of Four Documents in Pdr.W/Encl List of Documents Being Placed in PDR)
- ML19274E627 + (Response to 780720 FOIA Request for Document Re Nrc/Doe Liaison Board Meetings.List of Related Documents Placed in PDR)
- ML20197C637 + (Response to 780731 NRC Ltr Re Deviation Noted in IE Inspec Rept 70-1503/78-01 & 70-0048/78-01.Corrective Actions:Hot Cell 2 in Bldg 302A Metal Lab Is Having Safety Sys & Emergency Door Opening Controls Installed)
- ML20147B108 + (Response to 780807 NRC Ltr Re Deviation Noted in Inspec Rept 50-456/78-06 & 50-457/78-06.Util Contends That Items Result from Misinterpretation of Observations & of Standards & Requests Infractions Be Downgraded or Held in Abeyance)
- ML20197B559 + (Response to 780815 Hutchison Ltr & 780823 Prieto Ltr. Thorough Review of Gibbssars Pda Covered All Specific Concerns Identified by the Encl Questions of First Availability & Relative Scheduling)
- ML19248C457 + (Response to 780816 NRC Ltr Trans IE Inspec Repts 50-416/78-13 & 50-417/78-13. Repts Contain No Proprietary Info)
- IA-78-231, Response to 780905 Ltr Requesting Info Pursuant to FOIA Re Proliferation Resistant Assessment of 3 Nuc Pwr Sys,Study of Price-Anderson Indemnity for Radioisotopes & List of 28 Foreign Tech Notification Addresses & Info on Meeting Plans + (Response to 780905 Ltr Requesting Info Pursuant to FOIA Re Proliferation Resistant Assessment of 3 Nuc Pwr Sys,Study of Price-Anderson Indemnity for Radioisotopes & List of 28 Foreign Tech Notification Addresses & Info on Meeting Plans)
- ML19296A075 + (Response to 780920 FOIA Request Re NRC Enforcement Prog. Documents on Attached List Are Being Placed in Pdr.Documents Incl Licensee Reg Performance Eval,SECY-78-554,5/78 Licensee Performance Eval,Phase I Rept;4/78 Individual Site Ratings)
- ML20027A242 + (Response to 780927 Intervenor Interrogatories.Resumes for Safety Hearings & Certificate of Svc Encl)
- ML20147E231 + (Response to 780927 NRC Ltr Re Deviation Noted in Inspec Rept 99900283/78-01.Corrective Actions:All Contracts Reviewed by Chief Inspector,Supplier Spec Replaced,Purchase Orders Screened,Reels Tested,Drawings Signed & Scn Issued)
- ML20064C827 + (Response to 780927 NRC Ltr Re Protec for Degraded Grid Voltage Conditions.Will Comply W/Nrc Position Prior to Loading Fuel at Subj Facil)
- ML19322A088 + (Response to 780929 IE Bulletin 78-12.Info Re Primary Reactor Pressure Vessel Weldments Supplied to NRC on 780112. C-E Will Supply Addl Requested Info)
- IA-78-623, Response to 781004 FOIA Request for Documents Re Completion Dates for Subj Facil & Detailed plant-specific Analysis. Forwards Requested Documents.W/Encl List of Documents + (Response to 781004 FOIA Request for Documents Re Completion Dates for Subj Facil & Detailed plant-specific Analysis. Forwards Requested Documents.W/Encl List of Documents)
- ML20147J069 + (Response to 781004 FOIA Request for Documents Re Completion Dates for Subj Facil & Detailed plant-specific Analysis. Forwards Requested Documents.W/Encl List of Documents)