Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15202A035 + (Relief Request Serial 15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 2 of 3)
- ML15202A034 + (Relief Request Serial 15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 1 of 3)
- ONS-2015-086, Relief Request Serial 15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 3 + (Relief Request Serial 15-ON-002: Limited Volume Examinations Per 10 CFR 50.55a(g)(5)(iii) for Unit 1 and 2, Fourth Inservice Inspection Interval. Part 3 of 3)
- MNS-15-088, Relief Request Serial No. 15-MN-002 + (Relief Request Serial No. 15-MN-002)
- ML13080A079 + (Relief Request Serial Number 13-CN-001, Relief Request to Use Alternative Depth Sizing Criteria)
- ML13148A310 + (Relief Request Serial Number 13-CN-003, Request for Alternative to the Requirement of IWB-2500, Table IWB-2500-1, Category B-A and Category B-D (Inspection Program B) for Reactor Pressure Vessel (RPV) Welds)
- CNS-14-100, Relief Request Serial Number 14-CN-001, Relief Request for Limited Volumetric Examination of Class 1 Welds + (Relief Request Serial Number 14-CN-001, Relief Request for Limited Volumetric Examination of Class 1 Welds)
- CNS-14-021, Relief Request Serial Number 14-CN-001, Relief Request for Limited Volumetric Examination of Class 1 Welds + (Relief Request Serial Number 14-CN-001, Relief Request for Limited Volumetric Examination of Class 1 Welds)
- CNS-14-133, Relief Request Serial Number 14-CN-003, Relief Request to Use Alternative Depth Sizing Criteria + (Relief Request Serial Number 14-CN-003, Relief Request to Use Alternative Depth Sizing Criteria)
- ML15082A074 + (Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Stem System Braided Flex-Hose)
- CNS-15-079, Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose -Submitted Pursuant to 10 Cer 50.55a(z)(2) + (Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose -Submitted Pursuant to 10 Cer 50.55a(z)(2))
- ML15127A170 + (Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2))
- CNS-15-062, Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2) + (Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2))
- ML060130203 + (Relief Request Subsequent Edition Letter and Addenda to Section XI of the ASME Code for Repair/Replacement Activities)
- CP-201500671, Relief Request T-1 for Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications, (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date: August 3 + (Relief Request T-1 for Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications, (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date: August 3)
- ML16011A073 + (Relief Request T-1; Alternative to the ASME OM Code Frequency Specifications for Inservice Testing for the Third 10-Year IST Interval)
- ML062270661 + (Relief Request Third 10-Year Inservice Inspection Interval Program Plan, Request for Relief 05-ON-002, Revision 1)
- ML072620373 + (Relief Request Third 10-Year Pump and Valve Inservice Testing Program (TAC Nos. MD5988, MD5989, MD5992 Through MD5995))
- ML041680247 + (Relief Request Third 10-year Pump and Valve Inservice Testing Program)
- ML20196L826 + (Relief Request V-3, Inservice Testing (IST))
- ML20196L830 + (Relief Request V-3, Inservice Testing (Ist), Table 1)
- ML030550672 + (Relief Request V-6, Extend Surveillance Interval for Seat Leakage Testing of Category a Valves & Relief Request V-7, Extend Surveillance Interval for Pressure Relief Valves, MB6482 & MB6483)
- ML12258A045 + (Relief Request VR-01 from Requirements of ASME OM Code, Mandatory Appendix I, One-time Extension for 5-Year Replacement Interval, from 4/11/12 to 6/2013, Main Steam Isolation Valve Actuator Rupture Disks)
- ML13232A051 + (Relief Request VR-01, Proposed Alternative Testing of the Pressurizer Pilot Operated Relief Valve)
- ML15161A535 + (Relief Request VR-01; Alternatives to Certain Inservice Testing Requirements of the American Society of Mechanical Engineers (ASME) Code of Operation and Maintenance of Nuclear Power Plants)
- NG-11-0365, Relief Request VR-02 Regarding In-Service Testing of Safety/Relief Valves + (Relief Request VR-02 Regarding In-Service Testing of Safety/Relief Valves)
- LR-N24-0044, Relief Request VR-04 + (Relief Request VR-04)
- EPID:L-2024-LLR-0049 + (Relief Request VR-04)
- ML020090277 + (Relief Request VR-23 to Incorporate Code Case OMN-2 Into the Third 10-Year Inservice Testing Programs (Tac Nos. MB3240 and MB3241))
- ML103200668 + (Relief Request VR-7, One Time Replacement Frequency Extension)
- ML19310F679 + (Relief Request VRR-01 for Use of the Proposed Alternative in Lieu of the Inservice Testing Requirements of the ASME OM Code)
- ML19263F875 + (Relief Request VRR-01: Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)C3)(xi))
- ML100640737 + (Relief Request VRR-05, Rev. 1, Needs to Be Supplemented)
- ML092730032 + (Relief Request VRR-06, Revision 1 from the Requirements of the OM Code Inservice Testing of Safety Relief Valves)
- BSEP 05-0063, Relief Request VRR-15, Emergency Diesel Generator Service Water Check Valves + (Relief Request VRR-15, Emergency Diesel Generator Service Water Check Valves)
- ML081620005 + (Relief Request VRR-GGNS-2007-01 and -02, Alternative Inservice Test Requirement, Extension to ASME OM Code 5-Year IST Interval for Main Steam Safety Relief Valve)
- W3F1-2012-0063, Relief Request VRR-WF3-2012-1 Associated with Category a Leak Test of Check Valve ACC-108B + (Relief Request VRR-WF3-2012-1 Associated with Category a Leak Test of Check Valve ACC-108B)
- ML12293A362 + (Relief Request VRR-WF3-2012-1 Associated with Category a Leak Test of Component Cooling Water Check Valve ACC-108B for the Third 10-Year Inservice Inspection Interval)
- ML110770551 + (Relief Request VRR2 Regarding the 10-Year Inservice Testing Program Interval)
- ML120270298 + (Relief Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency)
- ML120330329 + (Relief Request VRR4 Regarding Pressurizer Safety Valve Test Frequency)
- ML113130428 + (Relief Request VRR5 Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency for the 10-Year Inservice Testing Program Interval)
- ML102600249 + (Relief Request VY-ISI-014, Alternative Examination Requirement for Nozzle-To-Vessel Weld and Inner Radius Using ASME Code Case N-702-Vermont Yankee Nuclear Power Station)
- ML100850089 + (Relief Request W3-CISI-001, Request for Alternative to ASME IWE-5521, Post Repair Testing of the Steel Containment Vessel Opening)
- ML092300608 + (Relief Request WBN2/PDI-4 Related to Ultrasonic Examination of the Reactor Pressure Vessel Shell-To-Flange Welds)
- ML062510192 + (Relief Request for 10-Year Pump and Valve Inservice Testing Program - RR P-1 for Safeguards Building Sump Pumps)
- ML081190470 + (Relief Request for 13R-11 for Third Ten-Year Inservice Inspection Interval)
- NG-09-0539, Relief Request for 1st Period Limited Weld Examinations + (Relief Request for 1st Period Limited Weld Examinations)
- NG-13-0119, Relief Request for 2nd Period Limited Weld Examinations + (Relief Request for 2nd Period Limited Weld Examinations)
- NG-07-0368, Relief Request for 3rd Period Limited Weld Examinations + (Relief Request for 3rd Period Limited Weld Examinations)
- ML13296A014 + (Relief Request for ASME OM Code Pump and Valve Testing Requirements Regarding the Frequency of Inservice Testing)
- ML092050184 + (Relief Request for Alternate Requirements for ASME Classification of Lines and Components Attached to the Pressurizer Steam Space)