Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17052A310 + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix E - Cable Tray Drawings)
- RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix E - Cable Tray Drawings + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix E - Cable Tray Drawings)
- ML17038A507 + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 15 - Accident Analyses)
- RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 15 - Accident Analyses + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 15 - Accident Analyses)
- ML17052A287 + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix E - Fire Protection Evaluation Report)
- RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix E - Fire Protection Evaluation Report + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix E - Fire Protection Evaluation Report)
- ML17038A522 + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix D - Requirements Resulting from TIM-2 Accident)
- RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix D - Requirements Resulting from TIM-2 Accident + (Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix D - Requirements Resulting from TIM-2 Accident)
- ML20043E252 + (Redacted Corrected C-10 Research and Education Foundations Proposed Findings of Fact and Conclusions of Law)
- ML22006A012 + (Redacted Cover Letter McGuire Dam Safety Inspection 2021, Public)
- CPSES-200401308, Redacted Draft - Comanche Peak Steam Electric Station, Unit 1- Review of Steam Generators 90-day Report and Operational Performance Report + (Redacted Draft - Comanche Peak Steam Electric Station, Unit 1- Review of Steam Generators 90-day Report and Operational Performance Report)
- ML23011A105 + (Redacted Draft Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014))
- ML23011A104 + (Redacted Draft Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013))
- ML23011A091 + (Redacted Draft Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013))
- ML12255A395 + (Redacted Draft Second-Round RAI the Proposed NFPA 805 Amendment)
- ML18079B036 + (Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics)
- RS-17-082, Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics + (Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics)
- ML13301A455 + (Redacted E-mail Re. Nuclear Regulatory Commission 2.206 Petition Re. Ames Group LLC)
- ML20300A392 + (Redacted EPRI, NRC Request for Additional Information on BWRVIP-329: Updated Probabilistic Fracture Mechanics for BWR RPV Welds to Address Extended Operations)
- ML19241A198 + (Redacted Email to K. Bean Regarding Property at 11496 Portlance Avenue Request for Initial Site)
- ML082310290 + (Redacted Environmental Report for the Rennselaer Polytechnic Institute Reactor Critical Facility)
- ML15261A829 + (Redacted Filings for Track 2 Contentions)
- ML23062A733 + (Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014))
- ML23062A728 + (Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013))
- ML17191B133 + (Redacted Fire Hazards Analysis, Revision 17)
- ML18024B496 + (Redacted Fire Protection Report)
- CY-15-035, Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report + (Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report)
- ML18144A957 + (Redacted Hs Container Shielding Assessment with Thorium Target Shielding Assessment of the 3977A Safkeg Type B Transport Package)
- ML092650381 + (Redacted Idaho State University, Transcript of September 1, 2009, Telephone Conference Call for Kevan Crawford Addressing the Petition Review Board Regarding the 2.206 Petition Request)
- ML19046A244 + (Redacted Individual Response Monzon 2 1 19)
- ML19046A271 + (Redacted Individual Response Murdock 4-2018-002)
- ML20135G021 + (Redacted Investigation Rept 2-84-015.Non-nuclear Qualified Primer Coating Matl Applied to Unit 1 Galvanized Steel Ventilation Ring Ductwork)
- ML18060A401 + (Redacted Issuance of Amendments Revising TSs for Methodology Reports DPC-NE-3008-P, Revision 0, and DPC-NE-3009-P, Revision 0) (CAC Nos. MF8439 and MF8440; EPID L-2016-LLA-0012))
- ML22067A074 + (Redacted LES-21-045-NRC Urenco USA Financial Instruments for 2020 Decommissioning Estimates Cover Letter)
- ML13232A263 + (Redacted Letter + Enclosure W/O Attachments, Audit Report for 2/11-14/13, Regulatory Audit at the CS Innovations Westinghouse Facility in Scottsdale, Az, to Support Digital Replacement of Process Protection System LAR)
- NG-12-0207, Redacted Letter NG-12-0207 + (Redacted Letter NG-12-0207)
- ML13045A649 + (Redacted Letter Only - Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Pack)
- ML12300A322 + (Redacted Letter Only, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660))
- ML15103A003 + (Redacted Letter Only, Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 14, 15, 16, and 17)
- ML092440721 + (Redacted Letter from Kevan Crawford 10CFR2.206 Petition for Enforcement Action Against Idaho State University)
- ML13232A258 + (Redacted Letter, Audit Report for 2/11-2/14/13 NRC Cyber Security Pilot Study, at the Plant Site in Avila Beach, CA, to Support Digital Replacement of Process Protection System License Amendment Request)
- ML15156A729 + (Redacted Letter, Dam Safety Inspection Report for Safe Shutdown Impoundment Dam; Results of Inspection on April 9, 2015)
- ML13302C136 + (Redacted Letter, Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation)
- ML16096A266 + (Redacted Letter, Order, Safety Evaluation, and Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments)
- ML14314A183 + (Redacted Letter, Regulatory Audit Plan for 11/17-19/2014 Audit to Support Review of Security Plan Revisions 14, 15, 16, and 17)
- ML13024A105 + (Redacted Letter, Regulatory Audit Report for 11/13-16/12 Audit (Cyber Security) at Invensys Operations Management in Lake Forest, CA, to Support Digital Replacement of Process Protection System License Amendment Request)
- ML14086A520 + (Redacted Letter, Request for Additional Information on the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15)
- ML14091A345 + (Redacted Letter, Transmittal of Us Army Corps of Engineers Evaluation of Missouri River Mainstem Dams and Potential Flood Hydrographs at Fort Calhoun and Cooper Nuclear Power Plants)
- RBG-47768, Redacted License Renewal Application + (Redacted License Renewal Application)
- ML091250487 + (Redacted License Renewal Application for the Penn State Breazeale Reactor (Psbr))
- ML17216A812 + (Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection)