RBG-47768, Redacted License Renewal Application

From kanterella
Jump to navigation Jump to search
Redacted License Renewal Application
ML17174A529
Person / Time
Site: 05000548
Issue date: 06/15/2017
From: Vercelli S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47768
Download: ML17174A529 (5)


Text

-===*Entergy Entergy Operations, Inc.

River Bend Station 5483 U.S. Hwy. 61 St. Francisville, LA 70775 Steven P. Vercelli General Manager - Plant Operations RBG-47768 June 15, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Redacted License Renewal Application River Bend Station - Unit 1 Docket Nos. 50-548 License Nos. NPF-47

REFERENCE:

Entergy Letter No. RBG-47735 (May 25, 2017), License Renewal Application

Dear Sir or Madam:

This letter is provided to, (1) request withholding from publi,e disclosure Appendix E, Applicant's Environmental Report - Operating License Renewal Stage, of the referenced letter, and (2) submit for your review and approval a redacted Appendix E suitable for public disclosure.

Entergy has been informed that NRC determined during the initial acceptance review that two figures in the original Appendix E*contained information of an historic or culturally sensitive nature which renders those figures inappropriate for public disclosure.

Enclos*ure 1 to this letter provides an affidavit supporting the request for withholding from public disclosure of Appendix E as originally submitted. Enclosure 2 contains a redacted version *of Appendix E for which public disclosure is appropriate.

This letter contains no new regulatory commitments. If you have any further questions on this matter, please contact Mr. Tim Schenk, Manager - Regulatory Assurance at 225-381-4177.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 15, 2017.

enclosures

RBG-47768 Page 2 of 3 cc: w/o enclosures U.S. Nuclear Regulatory Commission Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission Attn: Lisa Regner 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Attn: Elaine Keegan 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region IV.

1600 East Lamar Blvd.

Arlington, TX 76011-4511 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Central Records Clerk Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section Ji Young Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312

Enclosure 1 to RBG-47768 Affidavit of Steven P. Vercelli J

Affidavit of Steven P. Vercelli I, Steven P. Vercelli, hereby affirm and state as follows:

1. I am General Manager - Plant Operations of River Bend Station (RBS), and I have been authorized to execute this affidavit on behalf of Entergy Operations, Inc. (EOI).
2. The information contained in Appendix E of RBS letter no. 47735, dated May 25, 2017, License Renewal Application, contains information of an historic or culturally significant nature for which public disclosure is inappropriate. This determination has been confirmed and is supported by Mr. Chip McGimsey, Louisiana State Archaeologist.
3. In making this application for withholding of.sensitive information of which it is the owner, EOI believes the information qualifies for withholding under the exemption from disclosure set forth in NRC regulations 10 CFR 2.390(a)(3), because:
a. This information.is not available in public sources and could not be gathered readily from other publically available information.
b. Public disclosure of this information could lead to substantial harm of historic or culturally sensitive structures; accordingly, this information is protected from disclosure by Section 304 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's implementing regulations at 36 CFR 800.11(c~'

~P.Vercelli General Manager - Plant Operations STATE OF LOUISIANA PARISH OF WEST FELICIANA Sworn to and subscribed before me, a Not~ry Public, this 15th day of June, 2017.

Cl~j,~

Claudia F. Hurst 48529 My commission expires with life

,r ,.._

Enclosure 2 to RBG-47768 Applicant's Environmental Report - Operating License Renewal Stage (Publically available version)

_____ __J