Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Recirculation Sys Testing". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20264D164  + (Recirculation Spary System (RSS) Safeguard Area El 718 Ft 6 Inches)
  • ML20264C935  + (Recirculation Spray (RSS) Reactor Containment El 118 Ft)
  • 05000281/FIN-2014002-01  + (Recirculation Spray Heat Exchanger Inlet Isolation Valve MOV Thermal Overload Not Properly Reset)
  • ML20264C939  + (Recirculation Spray Sys (RSS) Reactor Containment El 718 Ft to 767 Ft 10 Inches)
  • ML20264D066  + (Recirculation Spray Sys (RSS) Reactor Containment El 718 to 767 Ft 10 Inches)
  • ML20264D167  + (Recirculation Spray Sys (RSS) Safeguard Area El 718 Ft 6 Inches,736 Ft 6 Inches & 747 Ft. Rev Date Illegible)
  • ML20264D368  + (Recirculation Spray Sys (RSS) Safeguard Area El 680 Ft 11 Inches. Sheet 1 of 2.Rev Date Illegible)
  • ML20264D311  + (Recirculation Spray Sys (RSS) Safeguard Area El 718 Ft 6 Inches)
  • ML20264D237  + (Recirculation Spray Sys (RSS) Safeguard Area El 718 Ft 6 Inches)
  • ML20264D200  + (Recirculation Spray Sys (RSS) Safeguard Area El 747 Ft)
  • ML20264D283  + (Recirculation Spray Sys (RSS) Safeguard Bldg El 732 Ft)
  • ML20264D383  + (Recirculation Spray Sys (RSS) Safeguard Bldg El 737 Ft 6 Inches)
  • ML20264D169  + (Recirculation Spray Sys (RSS) Safeguard Bldg El 718 Ft 6 Inches,736 Ft 6 Inches & 747 Ft)
  • ML20264D264  + (Recirculation Spray System (RSS) Safeguard Area El 718 Ft 6 Inches & Above 737 Ft 6 Inches. No Rev Date)
  • ML20264D371  + (Recirculation Spray System (RSS) Safeguard Area El 680 Ft 11 Inches. Rev Date Illegible)
  • ML20264D191  + (Recirculation Spray System (RSS) Safeguard Area El 718 Ft 6 Inches,725 Ft 1 Inch & 737 Ft 11 Inches)
  • ML20264D374  + (Recirculation Spray System (RSS) Safeguard Area El 680 Ft 11 Inches)
  • ML20264D305  + (Recirculation Spray System (RSS) Safeguard Area El 718 Ft 6 Inches)
  • ML20264D193  + (Recirculation Spray System (RSS) Safeguard Area El 718 Ft 6 Inches)
  • ML20264D314  + (Recirculation Spray System (RSS) Safeguard Area El 735 Ft 6 Inches)
  • ML20264D172  + (Recirculation Spray System (RSS) Safeguard Area El 737 Ft 6 Inches)
  • ML20264D170  + (Recirculation Spray System (RSS) Safeguard Bldg Elev 718 Ft 6 Inches)
  • ML20264D198  + (Recirculation Spray System (RSS) Safeguard Building El 747 Ft)
  • ML20114B165  + (Recirculation Suction Large Break LOCA Analysis of the Santa Maria DE Garona Nuclear Power Plant Using TRAC-BF1(G1J1))
  • ML20198P772  + (Recirculation Sys Piping Insp Program,Response to IE Bulletin 82-03,Rev 1, Topical Rept 12)
  • ML20106F430  + (Recirculation Sys Welds - Sept 1984 Outage)
  • 05000263/FIN-2013004-01  + (Recirculation System Vulnerabilities Due to Inadequate Modification Review)
  • ML20209F239  + (Recirculation,Rhr & Reactor Water Cleanup Sys Piping Weld Joint Insp/Mitigation Program for 1985 Maint/ Refueling Outage)
  • ML20091M320  + (Recirculation,Rhr & Reactor Water Cleanup Weld Joint Insp Program - 1984 Maint/Refueling Outage)
  • ML040150520  + (Recission of Confirmatory Action Letter - Cornell University - Site-Specific Compensatory Measures Implementation Plan)
  • ML20155F688  + (Reclamation Plans at Title I & Title II Tailings Sites)
  • PMNS20181381, Reclamation and Final Status Survey (FSS) Experience at Rio Algom  + (Reclamation and Final Status Survey (FSS) Experience at Rio Algom)
  • HBL-19-013, Reclassification of Building 13 (Count Room Building)  + (Reclassification of Building 13 (Count Room Building))
  • HBL-19-012, Reclassification of Building 47 Waste Management Facility and the Waste Management Facility Storage Pad  + (Reclassification of Building 47 Waste Management Facility and the Waste Management Facility Storage Pad)
  • ML20072H498  + (Reclassification of Flued Head Fittings at Midland Plant Units 1 & 2)
  • HBL-16-009, Reclassification of Intake Structure  + (Reclassification of Intake Structure)
  • ML18347B146  + (Reclassification of Reportability of Event Report E-PAL-78-18)
  • ML19345G143  + (Reclassifies AO-1-76 Reported on 751205 & 760106 Per New Tech Specs Reporting Requirement.Event No Longer Considered Reportable)
  • ML19347C785  + (Reclassifies Core Spray Sparger Connection Leak Noted in 750513 AO 10-75 as Nonreportable Event.Leak Allowable within Design of Core Spray Sys)
  • ML20138N712  + (Recoatability of 560/1201 W/Nutec 1201 After 1 Yr Simulated Outside Exposure)
  • ML20138N910  + (Recoatability of Aged Nutec 6 & Nutec 1201 Films:Radiation Tolerance & DBA Results (Ornl))
  • Information Notice 1986-21, Recognition of American Society of Mechanical Engineers Accreditation Program for N Stamp Holders  + (Recognition of American Society of Mechanical Engineers Accreditation Program for N Stamp Holders)
  • ML18095A115  + (Recognition of Nr and NR-VR National Board Accreditation Program)
  • ML20059G391  + (Recognizes Efforts of G Bond & W Douglas Re Implementation of Emergency Response Data Sys (ERDS) Link at Facility. ERDS Link at Facility Operational & Should Be Implemented in Emergency Response Planning)
  • ML20237B949  + (Recognizes Outstanding Contributions of Gd Roberts & Jm Bianco on Task Under Job Code E8235, Review & Code Matl Event Repts & Maintain Nuclear Matl Events Database)
  • ML20246H671  + (Recognizes Region II Approval of 890224 Rev to Fnmc Plan. License Condition 1.1 to Amend SG-2 of License SNM-1097 Revised as Listed)
  • ML20207C477  + (Recognizes That J Ellis Always Legal Representative or co-representative in Proceedings.Authorizes Any Applicant Counsel or Employees to Communicate W/J Ellis About Any Issue,Document or Other Matter)
  • ML20045E322  + (Recognizes That Licensee Completed PIP Initiated After 910529 Incident,To Improve Performance in General Area of Nuclear Criticality Safety.Substantial Improvements Made at Facility as Result of Completion)
  • ML20050A795  + (Recognizes Util Extraordinary Efforts to Meet Commission 820201 Deadline for Installation & Testing of Prompt Notification Sys)
  • ML19308E124  + (Recommend PWR Inservice Insp Program for Detection of Effects of Reactor Coolant Leakage)