Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML022030209 + (Reactor Vessel Head Degradation Lessons Learned Task Force Public Meeting Summaries - June 12 and June 19 Meetings; Memo to William F. Kane, Deputy. Memo to William F. Kane, Deputy Executive Director for Reactor Programs)
- ML030280708 + (Reactor Vessel Head Degradation Lessons Learned Task Force: Transcript of Public Meeting Held on Nov 20, 2002 in Oak Harbor, Oh)
- ML030280448 + (Reactor Vessel Head Degradation Lessons-Learned Task Force Report Executive Summary - Handout Provided at Public Meeting on November 20, 2002)
- ML030280481 + (Reactor Vessel Head Degradation Lessons-Learned Task Force - Public Meeting, November 20, 2002 (Presentation Slides))
- ML022810466 + (Reactor Vessel Head Degradation Lessons-Learned Task Force - Meeting Notice)
- RNP-RA/02-0122, Reactor Vessel Head Inspection Plan for Refueling Outage 21 + (Reactor Vessel Head Inspection Plan for Refueling Outage 21)
- NL-03-098, Reactor Vessel Head Inspection Results, Spring 2003 Refueling Outage + (Reactor Vessel Head Inspection Results, Spring 2003 Refueling Outage)
- NL-02-162, Reactor Vessel Head Inspection Results; Indian Point 2, Fall 2002 Refueling Outage + (Reactor Vessel Head Inspection Results; Indian Point 2, Fall 2002 Refueling Outage)
- ML030510264 + (Reactor Vessel Head Inspection Status, San Onofre Nuclear Generating Station Unit 3)
- ML040550033 + (Reactor Vessel Head Inspections, Calvert Cliffs Nuclear Power Plant, Inc)
- 05000335/FIN-2007003-01 + (Reactor Vessel Head Lift Practices)
- 05000369/FIN-2007003-02 + (Reactor Vessel Head Lift Practices Related to Design and Licensing Basis)
- ENS 41128 + (Reactor Vessel Head Nozzle Cracking)
- 05000339/LER-2001-003, Reactor Vessel Head Nozzle Through-Wall Leakage Due to Lack of Weld Fusion During Original Fabrication + (Reactor Vessel Head Nozzle Through-Wall Leakage Due to Lack of Weld Fusion During Original Fabrication)
- ENS 40728 + (Reactor Vessel Head Nozzle Weld Area Flaw)
- ENS 42917 + (Reactor Vessel Head Nozzle Weld Area Flaw)
- ENS 50962 + (Reactor Vessel Head Penetration Flaw Identified During Inservice Inspection)
- L-05-091, Reactor Vessel Head Penetration Inspection 60-Day Report for 2R11 + (Reactor Vessel Head Penetration Inspection 60-Day Report for 2R11)
- ENS 52297 + (Reactor Vessel Head Penetration Nozzle Flaw)
- ML15147A155 + (Reactor Vessel Head Penetration Photographs Associated with Omaha Public Power District (OPPD) Relief Request RR-14)
- ENS 56165 + (Reactor Vessel Head Penetration Repair Degraded)
- ENS 51410 + (Reactor Vessel Head Penetration Repair Did Not Meet Acceptance Criteria)
- RC-12-0154, Reactor Vessel Head Penetration Weld Repair Under WCAP-15987 + (Reactor Vessel Head Penetration Weld Repair Under WCAP-15987)
- ML17334A175 + (Reactor Vessel Head Removal & Replacement)
- ML030770256 + (Reactor Vessel Head Replacement Project)
- ENS 43675 + (Reactor Vessel Head Vent May Not Be Isolable During a Fire)
- ML18086B242 + (Reactor Vessel Head Vent Operation)
- ML17319A962 + (Reactor Vessel Head Vent Operation)
- ML20037D461 + (Reactor Vessel Head Vent Operation, Revision 0)
- ML18086A750 + (Reactor Vessel Head Vent Operation. Revision 0.One Oversize Drawing Encl.Aperture Card Is Available in PDR)
- ML20263F718 + (Reactor Vessel Head Vent System)
- ML20263A270 + (Reactor Vessel Head Vent System)
- ML20266E675 + (Reactor Vessel Head Vent System Flow Diagram)
- ML17256A895 + (Reactor Vessel Head Vent System Piping Plan,Elevation & Details at El 250 Ft 6 Inches & Above)
- ML021550483 + (Reactor Vessel Head and Penetration Nozzle Condition Report)
- ML023650517 + (Reactor Vessel Head and Penetration Nozzle Condition Report)
- CP-202000263, Reactor Vessel Head, Bottom Mounted Instrumentation, and Hot Leg Ultrasonic Testing Examinations Relief Request + (Reactor Vessel Head, Bottom Mounted Instrumentation, and Hot Leg Ultrasonic Testing Examinations Relief Request)
- EPID:L-2020-LLR-0063 + (Reactor Vessel Head, Bottom Mounted Instrumentation, and Hot Leg Ultrasonic Testing Examinations Relief Request)
- ML17345A420 + (Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation, Ltr Rept)
- ML20196C128 + (Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation)
- ML20034B937 + (Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation)
- ML20005G421 + (Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation)
- ML20055G994 + (Reactor Vessel Inservice Exam Rept (1990))
- ML20261D406 + (Reactor Vessel Inservice Insp)
- ML20262H355 + (Reactor Vessel Instrumentation P&I Diagram)
- ML20266H286 + (Reactor Vessel Instrumentation P&I Diagram, as Built)
- ML20265B240 + (Reactor Vessel Instrumentation.Sheet 1)
- ML040850115 + (Reactor Vessel Integrity Database Update for the Perry Nuclear Power Plant)
- ML18059A698 + (Reactor Vessel Integrity Project Plan)
- 2CAN071603, Reactor Vessel Internals Aging Management Program Plan for License Renewal Application + (Reactor Vessel Internals Aging Management Program Plan for License Renewal Application)
- ML15135A358 + (Reactor Vessel Internals Aging Management Program and Inspection Plan for License Renewal Commitment No. 13)
- ML092720461 + (Reactor Vessel Internals Aging Management Program Inspection Plan)