FENOC Perry Nuclear Power Plant tOR%1 Center Road FirstEne Nuclear Operating Company Perry Ohio 44081 Milam R. Kanda Fax 440-280-8029 Vice President - Nuclear March 16, 2004 PY-CEI/NRR-2780L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Reactor Vessel Integrity Database Update for the Perry Nuclear Power Plant Ladies and Gentlemen:
By letter dated June 4, 2002 (PY-CEI/NRR-2627L), the Nuclear Regulatory Commission (NRC) was requested to review and approve a proposed license amendment for the Perry Nuclear Power Plant (PNPP) to revise the PNPP Reactor Coolant System (RCS)
Pressure/Temperature (PIT) limit curves specified in Technical Specification 3.4.11, 'RCS Pressure and Temperature (PIT) Limits." Pursuant to this license amendment request, the NRC approved Amendment 127 on April 29, 2003 (TAC NO. MB6061). In the license amendment request letter, the PNPP staff stated that the Reactor Vessel Integrity Database (RVID) would be updated upon approval of the license amendment. Based on discussions between the PNPP and NRC staffs, it was determined that a PNPP RVID update is not required. The NRC staff indicated that the information needed for the update was contained in the original PNPP license amendment submittal.
If you have questions or require additional information, please contact Mr. Vernon K. Higaki, Manager - Regulatory Affairs, at (440) 280-5294.