Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25188A195 + (RPI License Amendment Request Submittal 06/26/2025)
- ML25072A256 + (RPI Research & Test Reactor Potential Licensing Licensing Action March 4 2025)
- ML25226A072 + (RPI Supplemental Information Needed for Acceptance of Requested Licensing Action Re Revisions to Technical Specifications to Add Extended Shutdown Condition)
- ML25072A257 + (RPI Technical Specifications Proposed Changes Feb 2025)
- ML25259A153 + (RPI Withdrawal of Requested Licensing Action Re Revisions to Technical Specifications to Add Extended Shutdown Condition Submitted to NRC for Acceptance Review)
- ML092250379 + (RPM 2.3.4, Revision 002-03, Inspection and Maintenance Process for Respiratory Protection Equipment)
- ML20126G252 + (RPM-50-120 Status Update for the Petitioner, E-mail Dated May 4, 2020)
- ML22193A247 + (RPP-001, Revision 4, Cimarron Environmental Response Trust Radiation Protection Plan)
- ML18099A127 + (RPP-ENV-58782, R0, Performance Assessment of Waste Management Area C, Hanford Site, Washington)
- ML18099A136 + (RPP-ENV-58782, R0, Performance Assessment of Waste Management Area C, Hanford Site, Washington - Part 2)
- ML18099A131 + (RPP-ENV-58782, R0, Performance Assessment of Waste Management Area C, Hanford Site, Washington - Part 1)
- ML19305A226 + (RPP-RPT-42323, Revision 4, Hanford C-Farm and Ancillary Equipment Residual Waste Inventory)
- ML19305A459 + (RPP-RPT-42323, Revision 4, Hanford C-Farm Tank and Ancillary Equipment Residual Waste Inventory)
- ML20266C874 + (RPS & ECCS Analog Trip System)
- ML20266C878 + (RPS & ECCS Analog Trip System. Rev Date Illegible)
- ENS 58012 + (RPS Actuation and Offsite Notification)
- 05000483/LER-2002-013, RPS Actuation in Mode 4 While Performing Tadot Testing + (RPS Actuation in Mode 4 While Performing Tadot Testing)
- ML20262J287 + (RPS Bin Assembly)
- ML17332A851 + (RPS Diversity in Westinghouse Pwrs)
- TSTF-320 + (RPS Electric Power Monitoring Modes of Applicability)
- ML17324A249 + (RPS Functional Diagram)
- ML22140A135 + (RPS Instrumentation)
- ML20262J239 + (RPS Isolation Logic & Wiring Diagram AW20)
- ML20262J341 + (RPS Isolation Logic & Wiring Diagram AW20. Sheet 2 of 2)
- ML17324A247 + (RPS Misc Schematics Sh 2 of 4)
- ML20261C009 + (RPS NSSS Logic Vb)
- ML20263R481 + (RPS Power Distribution Panel Protective Devices Reactor Protection System. Sheet 1 of 1)
- ML20261C679 + (RPS Power Distribution Panel Protective Devices Reactor Protection Sys. Sheet 1 of 1)
- ML20058J038 + (RPS Setpoint Methodology Using Statistical Combination of Uncertainties, Vol 3)
- ML20262J446 + (RPS Terminal Block Wiring Diagram. Sheet 1 of 4)
- ML20262J452 + (RPS Terminal Block Wiring Diagram. Sheet 2 of 4)
- ML20262J456 + (RPS Terminal Block Wiring Diagram. Sheet 3 of 4)
- ML20262J459 + (RPS Terminal Block Wiring Diagram. Sheet 4 of 4)
- ML20262J320 + (RPS Trip Status Panel Assembly)
- ML20262J339 + (RPS Trip Status Panel Schematic & Wiring Diagrams. Sheet 2 of 2)
- ML20262J307 + (RPS Trip System Panel Schematic & Wiring Diagram. Revision Date Illegible)
- TSTF-418 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- ML12065A329 + (RPT 22, Inspection/Activity Plan)
- ML18113A036 + (RPT-SLAW-001, Rev. 0, Extended Leach Testing of Simulated Law Cast Stone Monoliths)
- ML020080166 + (RPV Capsule Schedule and SE - (TAC MB2761) - ML020080166)
- ML20266J502 + (RPV Control ATWS)
- ML20266J499 + (RPV Control Non ATWS)
- ML22033A006 + (RPV Embrittlement Poster 2-1-22)
- ML20266J506 + (RPV Flooding)
- ML032170915 + (RPV Fracture Toughness & Material Surveillance Requirements Additional Information - Neutron Flux Evaluation)
- ML072140214 + (RPV Head Inspection Results Clarifications)
- ML062970389 + (RPV Head Lifts at D. C. Cook Nuclear Power Plant)
- 05000461/FIN-2009004-04 + (RPV Head Strongback, Dryer/Separator Strongback and RPV Head Lifting Lugs Did Not Demonstrate Single Failure Proof Requirements of NUREG 0612, Control of Heavy Loads at Nuclear Power Plants, Section 5.1.6)
- ML20261C230 + (RPV Hydro Milestone. Sheet 1 of 1)
- ML20266G632 + (RPV Neutron Monitoring System Traverse in Core Probe Plan. Sheet 4)
- ML20072F261 + (RPV Surveillance Matls Testing)