ML25072A256
Jump to navigation
Jump to search
| ML25072A256 | |
| Person / Time | |
|---|---|
| Site: | Rensselaer Polytechnic Institute |
| Issue date: | 03/14/2025 |
| From: | Rennselaer Polytechnic Institute |
| To: | NRC/NRR/DANU |
| Shared Package | |
| ML25072A259 | List: |
| References | |
| Download: ML25072A256 (2) | |
Text
RPI Research & Test Reactor Potential Licensing Action M a r c h 4, 2 0 2 5
3/4/2025 2
RPI Proposed Changes to Technical Specifications Section 1.3 Definitions: Add decommissioning from 10 CFR 50.2 Section 4.7 Radiation Monitoring:
Specify that monthly checks of CAM and area monitors are required only when fuel is present in the core Decrease frequency of criticality detector system testing and calibration Added basis for the proposed adjustments to radiation monitoring Section 6.1 Organization Structure: Add reference to new Section 6.10 Section 6.10 Special Administrative Controls for Extended Shutdown:
New section added to describe changes in reactor management, organization structure, and responsibilities