Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "RAI on Non-Seismic Piping". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML12223A388  + (RAI for the Review of the Indian Pont Nuclear Generating Unit Nos. 2 and 3, LRA Set 2012-02)
  • ML15244B353  + (RAI for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 11)
  • ML11335A317  + (RAI for the Review of the Limerick Generating Station License Renewal Application)
  • ML12181A441  + (RAI for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application)
  • ML093290298  + (RAI for the Review of the PVNGS Units 1, 2, and 3, License Renewal Application)
  • ML100270069  + (RAI for the Review of the Palo Verde Nuclear Generating Station Units 1, 2, 3, LRA (Tac Nos. ME0254, ME0255, & ME0256))
  • ML062290474  + (RAI for the Review of the Pilgrim Nuclear Power Station License Renewal Application)
  • ML12017A128  + (RAI for the Review of the STP LRA)
  • ML11214A207  + (RAI for the Review of the STP, License Renewal Application (TAC No. ME4938 and ME512))
  • ML12201B541  + (RAI for the Review of the STP, Units 1 and 2, LRA-Aluminum Bronze, Set 23)
  • ML12333A227  + (RAI for the Review of the STP, Units 1 and 2, LRA - Set 26)
  • ML12180A355  + (RAI for the Review of the Seabrook Station LRA ER-SAMA Review)
  • ML13122A340  + (RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application)
  • ML13134A201  + (RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, LRA)
  • ML13037A678  + (RAI for the Review of the South Texas Project, License Renewal Application)
  • ML11167A113  + (RAI for the Review of the South Texas Project, LRA)
  • ML082530102  + (RAI for the Review of the Susquehanna Steam Electric Station, Units 1 and 2, LRA RAI on Sun (1))
  • ML070400146  + (RAI for the Third 10-Year Interval Inservice Inspection Program, Relief Nos. RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, and RR-62 (TAC Nos. MD2587 Through MD2591, MD2597 and MD2609, MD2610 and MD2611))
  • ML071020156  + (RAI for the Third Year Interval, Request for Relief Nos. RR-46 Through RR-50, RR-52 Through RR-57 and RR-61 (TAC Nos. MD2592, MD2593, MD2594, MD2595, MD2596, MD2598, MD2699, MD2602, MD2603, MD2604, MD2605, MD2606, MD2607)
  • ML090780909  + (RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment)
  • ML13330B715  + (RAI from the Mechanical & Civil Engineering Branch Re. Revise STP Submittal and Request for Exemptions and License Amendment for a Risk-information Approach to Resolving Generic Safety Issues (GSI)-191)
  • ML031210656  + (RAI on Changes to Spent Fuel Loading Restrictions)
  • ML031210662  + (RAI on Changes to Spent Fuel Pool Load Restrictions)
  • ML060330121  + (RAI on License Amendment Request for Recovery of Low Power Testing Time - Impact on Reactor Vessel Integrity Assessments)
  • ML15086A305  + (RAI on License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants)
  • ML050970440  + (RAI on Proposed Upgraded Emergency Actions Levels (Eals))
  • ML040760945  + (RAI on Request for Relief Related to Reactor Pressure Vessel Nozzle Inspections)
  • ML12115A101  + (RAI on SAMA for the Review of the Grand Gulf Nuclear Station, Unit 1, LRA Er)
  • ML050700411  + (RAI on TS Amendment Nos. MC4410, MC4413, MC4745, MC4746 and MC4747)
  • BVY 14-028, RAI on Technical Specifications Proposed Change No. 307, Revision to Mitigation Strategy License Condition and Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 1  + (RAI on Technical Specifications Proposed Change No. 307, Revision to Mitigation Strategy License Condition and Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 1)
  • ML12276A300  + (RAI on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Standard 805)
  • ML12129A501  + (RAI the Effect of Thermal Conductivity Degradation on Peak Cladding Temperature Analysis)
  • ML13142A435  + (RAI to Biennial Decommissioning Financial Assurance Reports)
  • 05000456/FIN-2008008-01  + (RAI to Determine Adequacy of Pipe Supports Designed for Design Basis Loading Conditions with Lead Shielding Installed on SI and Rh Subsystems)
  • ML023190007  + (RAI to Farley Nuclear Plant, Units 1 & 2, 60-Day Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity)
  • ML102230369  + (RAI to S.K. Gambhir Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application)
  • ML12342A380  + (RAI to Support Review of Application for Technical Specification Change Re Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program)
  • ML063120033  + (RAI to a Request That Proposes a Change to the EP Annex)
  • ML031600659  + (RAI, (Tac Nos. MB8106, MB8107, MB8109 and MB8110))
  • ML023650253  + (RAI, - Containment Systems)
  • ML050630062  + (RAI, - Extended Power Uprate)
  • ML051670417  + (RAI, 1.38 Percent Measurement Uncertainty Recapture Power Uprate License Amendment Request)
  • ML052370401  + (RAI, 15-Day and 90-Day SG Tube ISI Report for End-of-Cycle 6 Refueling Outage in 2005 (Tac No. MC7485))
  • ML050970118  + (RAI, 1C Loop Stop Isolation Valve)
  • ML032550146  + (RAI, 2002 Steam Generator Inspection Results)
  • ML042050355  + (RAI, 2003 Refueling Outage Steam Generator Inspection Reports)
  • ML062840715  + (RAI, 2005 SG Tube Inspections)
  • ML090890593  + (RAI, 2008 Steam Generator Tube Inservice Inspections)
  • ML052280392  + (RAI, 24-Month Fuel Cycle (Tac No. MC4161) (TS-433))
  • ML041200785  + (RAI, 60-Day Response to Nuclear Regulatory Commission Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)