June 9, 2003 Mr. G. R. Peterson Vice President, Catawba Site Duke Energy Corporation 4800 Concord Road York, SC 29710
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MB8106, MB8107, MB8109 AND MB8110)
Dear Mr. Peterson:
By letter dated March 20, 2003, you submitted an application for amendment of the Technical Specifications (TS) for the Catawba Nuclear Station, Units 1 and 2, (Catawba) to revise the reactor vessel pressure-temperature (P-T) limits in the Catawba TS. The U. S. Nuclear Regulatory Commission technical staff has reviewed the application and has determined that additional information is required, as follows:
1.
Provide the reactor coolant system temperatures and corresponding metal temperatures and thermal stress intensity factors at the 1/4-thickness and 3/4-thickness locations in tabular format for all heatup and cooldown P-T limitations.
2.
TS Figure 3.4.3-1 (TS page number 3.4.3-3, Unit 1) heatup limitations (criticality limitations) need to be modified to reflect the effects of closure head flange and vessel flange.
We discussed these issues with your staff on June 2, 2003. Your staff indicated that you would attempt to provide your response by June 12, 2003.
Please contact me at (301) 415-1493, if you have any other questions on these issues.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414 cc: See next page
June 9, 2003 Mr. G. R. Peterson Vice President, Catawba Site Duke Energy Corporation 4800 Concord Road York, SC 29710
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MB8106, MB8107, MB8109 AND MB8110)
Dear Mr. Peterson:
By letter dated March 20, 2003, you submitted an application for amendment of the Technical Specifications (TS) for the Catawba Nuclear Station, Units 1 and 2, (Catawba) to revise the reactor vessel pressure-temperature (P-T) limits in the Catawba TS. The U. S. Nuclear Regulatory Commission technical staff has reviewed the application and has determined that additional information is required, as follows:
1.
Provide the reactor coolant system temperatures and corresponding metal temperatures and thermal stress intensity factors at the 1/4-thickness and 3/4-thickness locations in tabular format for all heatup and cooldown P-T limitations.
2.
TS Figure 3.4.3-1 (TS page number 3.4.3-3, Unit 1) heatup limitations (criticality limitations) need to be modified to reflect the effects of closure head flange and vessel flange.
We discussed these issues with your staff on June 2, 2003. Your staff indicated that you would attempt to provide your response by June 12, 2003.
Please contact me at (301) 415-1493, if you have any other questions on these issues.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414 cc: See next page DISTRIBUTION:
PUBLIC OGC CHawes NRay PDII-1 R/F ACRS RMartin JNakoski LPlisco, RII RHaag, RII ADAMS Accession: ML031600659 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME RMartin CHawes CGratton for:
JNakoski DATE 06/06/03 06/09/03 06/09/03 OFFICIAL RECORD COPY
Catawba Nuclear Station cc:
Mr. Gary Gilbert Regulatory Compliance Manager Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 Ms. Lisa F. Vaughn Legal Department (PB05E)
Duke Energy Corporation 422 South Church Street Charlotte, North Carolina 28201-1006 Anne Cottingham, Esquire Winston and Strawn 1400 L Street, NW Washington, DC 20005 North Carolina Municipal Power Agency Number 1 1427 Meadowwood Boulevard P. O. Box 29513 Raleigh, North Carolina 27626 County Manager of York County York County Courthouse York, South Carolina 29745 Piedmont Municipal Power Agency 121 Village Drive Greer, South Carolina 29651 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P. O. Box 629 Raleigh, North Carolina 27602 Elaine Wathen, Lead REP Planner Division of Emergency Management 116 West Jones Street Raleigh, North Carolina 27603-1335 North Carolina Electric Membership Corporation P. O. Box 27306 Raleigh, North Carolina 27611 Senior Resident Inspector U.S. Nuclear Regulatory Commission 4830 Concord Road York, South Carolina 29745 Virgil R. Autry, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201-1708 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Licensing Duke Energy Corporation 526 South Church Street Charlotte, North Carolina 28201-1006 Saluda River Electric P. O. Box 929 Laurens, South Carolina 29360 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210 Mr. T. Richard Puryear Owners Group (NCEMC)
Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721