Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0996-01, Provides Response to Notice of Violation & Proposed Imposition of Civil Penalties Re Insp Rept 50-302/96-04. Corrective Actions:Restoring Adequate Operating Margins for make-up Tank Hydrogen Additions & Reducing Operator Burden + (Provides Response to Notice of Violation & Proposed Imposition of Civil Penalties Re Insp Rept 50-302/96-04. Corrective Actions:Restoring Adequate Operating Margins for make-up Tank Hydrogen Additions & Reducing Operator Burden)
- ML20195E896 + (Provides Response to Nov, Re NRC Insp Repts 50-309/96-09,50-309/96-10,50-309/96-11,50-309/96-16 & 50-309/97-01.Corrective Actions:Util in Compliance with TS 5.5,which Is Current Ref to Cited TS 5.8.2.a)
- ML20078N887 + (Provides Response to Open Items from 940824 ACRS Subcommittee Meeting on Thermal Hydraulic Phenomena)
- RBG-41809, Provides Response to Part 1 of Info Requirements Listed in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity + (Provides Response to Part 1 of Info Requirements Listed in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity)
- BSEP-95-0572, Provides Response to Parts 2,3 & 4 of GL 92-01,Rev 1,Suppl 1,which Requests Licensee to Identify,Collect & Rept Any New Data Pertinent to Analysis of Structural Integrity & to Assess Impact of Data on RPV Integrity Analyses + (Provides Response to Parts 2,3 & 4 of GL 92-01,Rev 1,Suppl 1,which Requests Licensee to Identify,Collect & Rept Any New Data Pertinent to Analysis of Structural Integrity & to Assess Impact of Data on RPV Integrity Analyses)
- ML20112H553 + (Provides Response to Preliminary Accident Sequence Precursor Analysis of 960206 LOOP Event Catawba Unit 2)
- ML20199G980 + (Provides Response to Question 6 in 971008 & 1112 RAIs on Resolution of USI A-46,seismic Evaluation Rept.Responses to Questions 7 & 8 Will Be Submitted by 980215)
- ML20217P418 + (Provides Response to Question 7 of RAI Dtd 980128.Response Will Be Incorporated as Suppl 1 to Facility Decommissioning Environ Rept)
- ML20135H702 + (Provides Response to Question I VA 3 Re Generic Ltr 85-12 & Corrects Typo on Previous Submittal.Amended Table 2 for Braidwood Encl,Changing Procedures Whose Prefix Designated as Bwoa.Correct Prefix Should Be Bwca)
- ML20153F898 + (Provides Response to Question from 880804 Commission Meeting Re Restart Work Status.Final Emergency Procedures Will Be Revised for Both Units to Fully Integrate Reactor Vessel Level Indication Sys Before Startup)
- ML20203C243 + (Provides Response to Questions 7 & 8 in 971008 & 1112 RAIs on Resolution of USI A-46,seismic Evaluation Rept)
- ML20140E520 + (Provides Response to Questions Asked in 970527 Memorandum & Order Re Denial for SRO license,55-20726-SP)
- U-602771, Provides Response to Questions Concerning Megger & Ductor Testing Performed on Circuit Breakers at CPS + (Provides Response to Questions Concerning Megger & Ductor Testing Performed on Circuit Breakers at CPS)
- ML20044F946 + (Provides Response to Questions Contained in 930423 Memo Re Briefing of Congressman Defazio on Plant)
- JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon + (Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon)
- ML20137X879 + (Provides Response to Questions Posed in 970320 Telcon Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging)
- ML20197C599 + (Provides Response to Questions Posed in NRC & Agreement State Coordination on Insp,Investigation & Enforcement Info)
- ML18153A505 + (Provides Response to Questions Raised During NRC Training Managers Conference)
- ML20137E182 + (Provides Response to Questions Raised During Region II 1996 NRC Training Managers Conference)
- ML17354A448 + (Provides Response to Questions Raised During NRC Traning Managers Conference)
- AECM-81-387, Provides Response to Questions Raised in NRC Audit During Wk of 810921.Response Includes Info Re Compliance w/NUREG-0731 Criteria on Min Shift Coverage & Implementation of NUREG-0737,Item I.C.5 Requirements + (Provides Response to Questions Raised in NRC Audit During Wk of 810921.Response Includes Info Re Compliance w/NUREG-0731 Criteria on Min Shift Coverage & Implementation of NUREG-0737,Item I.C.5 Requirements)
- ML20202F696 + (Provides Response to Questions Re Apparent Undocumented Changes to Saxton Nuclear Experimental Corp Decommissioning QA Plan)
- ML20062K401 + (Provides Response to Questions Re Facility Inservice Insp Program Per 820728 Telcon.Util Will Inspect Pump & Casing Welds on Internal Basis & Require Relief from Volumetric Requirements)
- ML20116A470 + (Provides Response to Questions Re Proposed Amend to OL Re Purge Valve Testing)
- ML18100B139 + (Provides Response to Questions Re Request for Amend to Allow Use of Vantage+ Fuel at Salem Generating Station)
- ML20204E960 + (Provides Response to Questions Re Revised Form 591)
- HL-4646, Provides Response to Questions Re Transmitter Replacements & Actions to Maintain High Degree of Confidence for Detecting Transmitter Failures Caused by Loss of fill-oil + (Provides Response to Questions Re Transmitter Replacements & Actions to Maintain High Degree of Confidence for Detecting Transmitter Failures Caused by Loss of fill-oil)
- ML18065A789 + (Provides Response to Questions Re Updated Rv Fluence Submittal)
- GO2-91-098, Provides Response to Questions Re Water Chemistry History, Ut Characterization of 2ORRC(6)-8 Indication,Input to Flaw evaluation,poet-IHSI Exam & Location of 2ORRC(6)-8,per 910510 & s + (Provides Response to Questions Re Water Chemistry History, Ut Characterization of 2ORRC(6)-8 Indication,Input to Flaw evaluation,poet-IHSI Exam & Location of 2ORRC(6)-8,per 910510 & s)
- ML20217K701 + (Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl)
- ML20217D431 + (Provides Response to Questions from 970804 Meeting Re Commitment to Safety Conscious Work Environ & Transmittal Handouts)
- ML20137H105 + (Provides Response to Questions in 970307 Correspondence Re Rulemaking Plan-10CFR30 & 32 C-14 Urea Hi Pylori Diagnostic Test)
- U-602651, Provides Response to Questions on Clinton Power Station Proposed Amend to License NPF-62 Re Revised Safety Limit Min Critical Power Ratio + (Provides Response to Questions on Clinton Power Station Proposed Amend to License NPF-62 Re Revised Safety Limit Min Critical Power Ratio)
- ML20134B979 + (Provides Response to RAI & Editorial Correction for License Amend Request 96-005 Re Inverter/Battery Charger Mod)
- TXX-9646, Provides Response to RAI & Editorial Correction for License Amend Request 96-005 Re Inverter/Battery Charger Mod + (Provides Response to RAI & Editorial Correction for License Amend Request 96-005 Re Inverter/Battery Charger Mod)
- ML17309A610 + (Provides Response to RAI & Resubmits Level 1 PSA of Ginna Station)
- ML17264A794 + (Provides Response to RAI & Resubmits Level 1 PSA of Ginna Station)
- ML20128H628 + (Provides Response to RAI Concerning Plant Final Survey for ISFSI)
- ML20198N938 + (Provides Response to RAI Dtd 970916,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions. W/40 Oversize Drawings)
- 3F0198-15, Provides Response to RAI Dtd 971209,re LAR 218 Concerning Rev of Makeup Sys Letdown Line Failure Accident Analysis + (Provides Response to RAI Dtd 971209,re LAR 218 Concerning Rev of Makeup Sys Letdown Line Failure Accident Analysis)
- B17630, Provides Response to RAI Dtd 990316,in Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps. Addl Info Requested + (Provides Response to RAI Dtd 990316,in Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps. Addl Info Requested)
- ML20134L588 + (Provides Response to RAI Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info)
- NG-97-0245, Provides Response to RAI Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info + (Provides Response to RAI Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info)
- ML20082S069 + (Provides Response to RAI Per Proposed TS Amend for Nominal PORV Pressure Relief Setpoint Vs RCS Temp for Cold Overpressure Protection Sys)
- ML20134M172 + (Provides Response to RAI Re Adequacy & Availability of Design Bases Info Per 10CFR50.54(f))
- ML20133L561 + (Provides Response to RAI Re Adequacy of Detection & Suppression Systems That Support Use of Low Pressure Systems for Fire Safe Shutdown Per Requirements of 10CFR50,App R, Section III.G.3)
- ML20137G126 + (Provides Response to RAI Re Amend Request,Modifying SW Head Tanks,Unreviewed Safety Question)
- ML20236Q688 + (Provides Response to RAI Re Certificate Amend Request for Cylinder Crane Upgrades)
- ML20155F636 + (Provides Response to RAI Re Compliance Plan Issue 3,action 9,ASME Code Interpretation & Assessment Results)
- ML20217A476 + (Provides Response to RAI Re Current Design & Licensing Bases for Penetration Room Filtration Sys)
- ML18066A679 + (Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants)