7ee b[USEC
, A Globst Energy Company November 2,1998 ODP 98-0201 l
Dr. Carl J. Paperiello j
Director, Office of Nuclear Material Safety and Safeguards L
Attention: Document Control Desk j
l U.S. Nuclear Regulatory Commission i
Washington, D.C. 20555-0001 i
I Paducah Gaseous Diffusion Plant (PGDP)
Portsmouth Gaseous Diffusion Plant (PORTS)
Docket Nos. 70-7001 and 70-7002 Response to Request for AdditionalInformation - Compliance Plan Issue 3, Action 9, ASME Code Interpretation and Assessment Results,(TAC Nos. L32093 and L32095)
Dear Dr. Paperiello:
i The purpose of this letter is to provide a response to the United States Nuclear Regulatory I
l Commission's request (TAC Nos. L32093 and L32095) for additional information on Compliance i
Plan Issue 3, Action 9, ASME Code Interpretation and Assessment Results. The request for j
j additional information was provided to the United States Enrichment Corporation (USEC) in j
Reference 1 and identified additional information required by the NRC to review USEC's submittal t
(Reference 2) related to Compliance Plan Issue 3, Action 9.
Reference I requests submittal of Safety Analysis Report Update (SARUP) supporting analyses referenced in our previous responses (References 2 and 3) related to Compliance Plan Issue 3, Action f
9, and in SARUP sections 4.3.2.2.2 and 4.3.2.2.14. The requested analyses and the SARUP section to which these analyses apply are noted below. A copy of these analyses is provided in Enclosure 1.
{
l SARUP Section 4.3.2.2.2. Autoclave Steam Control Valve Fails Open (Pressure Increase) 1.
DAC-19045-CCA-51, Evaluation of Autoclave Steam Pressure Transients at Paducah,
[
Martin Marietta Energy Systems, Inc., May 17,1995 (Includes Addendum A dated July 31, 1997)- Applies to Paducah Only 2.
DAC-M0848401-SAR-35, Evaluation of Autoclave Steam Pressure Transients at Portsmouth, Martin Marietta Energy Systems, Inc., May 17,1995 (Includes Addendum A dated July 31,1997)- Applies to Portsmouth Only i
9811060078 9811027 PDR ADOCK 07007001 C
PDR-I 6903 Rockledge Drive. Bethesda. MD 20817-1818 1
Telephone 301-564 3200 Fax 301-564 3201 htt,m//www.usec.com Offices in Livermore. CA Paducah, KY Portsmouth. OH Washington, DC Nov 0 31998 3
k
Dr. Carl J. Paperiello November 2,1998 GDP 98-0201, Page 2 SARUP Section 4.3.2.2.14 (Cvlinder Failure Inside Autoclave (Primary System Intecrity) 1.
DAC-19045-CCA-52, Evaluation of Autoclave Response to a UF6 Release, Lockheed Martin Energy Systems, Inc., January 22,1997 - Applies to Paducah and Portsmouth.
Reference 1 also requests identification of any differences in the PORTS and PGDP supporting analyses pertaining to Compliance Plan Issue 3, Action 9. The calculational methodology presented in the enclosed analyses are identical for PORTS and PGDP. Differences in the analyses exist due to GDP design differences which affect input parameters, such as piping line sizes and steam inlet pressures, used in the analyses.
If you have any questions related to this subject, please contact Mark Smith at (301) 564-3244.
There are no new conunitments contained in this submittal.
Sincerely,
~
R
- s. 9.
l l'
Steven A.Toelle j
Nuclear Regulatory Assurance and Policy Manager
Enclosures:
As Stated cc:
NRC Region III Office, w/o NRC Resident Inspector - PGDP, w/o NRC Resident Inspector - PORTS, w/o l
i t
(
d
{
l f
5
i I
Dr. Carl J. Paperiello November 2,'1998
, GDP 98-0201, Page 3 References
~
i 1.
Letter from Yawar H. Faraz (NRC) to Mr. James H. Miller (USEC), Compliance Plan Issue 3, Action 9, ASME Code Interpretation ind Assessment Results Request for Additional I
Information - Portsmouth and Paducah Gaseous Diffusion Plants (TAC Nos. L32095 and j
L32093), dated September 15,1998, j
i 2.
Letter from Steven A. Toelle (USEC) to Mr. Robert C. Pierson (NRC), Portsmouth Gaseous Diffusion Plant, Docket No. 70-7002, Response to Request for Additional Information-Compliance Plan Issue 3, Action 9, ASME Code Interpretation and Assessment Results, (TAC No. L32012), USEC Letter GDP 98-0178, dated August 14,1998.
I 3.
Letter from Steven A. Toelle (USEC) to Mr. Robert C. Pierson (NRC), Paducah Gaseous Diffusion Plant, Docket No. 70-7001, Response to Request for Additional Information-1 Compliance Plan Issue 3, Action 9, ASME Code Interpretat!.in and Assessment Results, (TAC No. L32012), USEC Letter GDP 98-0184, dated August 21,1998.
i i
l 1
1 i
i
~
GDP 98-0201 Page1of1 SARUP Supporting Analyses Identified in USECs Response to RAIs Concerning Compliance Plan Issue 3, Action 9 This enclosure contains the following SARUP Supporting Analyses.
1.
DAC-19045-CCA-51, Evaluation of Autoclave Steam Pressure Transients at Paducah, Martin Marietta Energy Systems,Inc., May 17,1995 (Includes Addendum A dated July 31, 1997) - Applies to Paducah Only - 38 Pages.
1 2.
DAC-M0848401-SAR-35, Evaluation of Autoclave Steam Pressure Transients at Portsmouth, Martin Marietta Energy Systems,Inc., May 17,1995 (Includes Addendum A dated July 31,1997) - Applies to Portsmouth Only - 35 Pages.
3.
DAC-19045-CCA-52, Evaluation of Autoclave Response to a _UF6 Response, Lockheed Martin Energy Systems,Inc., January 2'2,1997 - Applies to Paducah and Portsmouth - 458 Pages 1
.