Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19347D896 + (Proposed Tech Spec 3/4.7.9 Re Hydraulic & Mechanical Snubbers.Justification Encl)
- ML20244A954 + (Proposed Tech Spec 3/4.7.9 Re Sealed Source Contamination)
- ML20034C520 + (Proposed Tech Spec 3/4.7.9,enhancing RHR Sys Reliability by Removing Automatic Isolation Requirement for RHR Suction Valves)
- ML20082G428 + (Proposed Tech Spec 3/4.8-2 Re Operability of Diesel Generator 13)
- ML20070K128 + (Proposed Tech Spec 3/4.8.1 & Bases Section 3/4.8 Re Min Vol of Fuel Oil in Emergency Diesel Generators)
- ML17325A319 + (Proposed Tech Spec 3/4.8.1 Re Diesel Generator Fuel Oil Testing & Adoption of 14-day Requirement for Completion of Offsite Lab Tests.Flow Diagram of Diesel Fuel Oil Tanks & Reason Why Emptying Tanks Requires Dual Shift Shutdown Encl)
- ML17277B305 + (Proposed Tech Spec 3/4.8.1 Re Electrical Power Sys,Allowing Flexibility to Perform More than One Diesel Generator Cold Start Test Per 184 Days)
- ML18011A586 + (Proposed Tech Spec 3/4.8.1, AC Sources & Associated Bases)
- ML20067C255 + (Proposed Tech Spec 3/4.8.1.1 Re Ac Sources Operating & Adding Description of Conditions Necessary for Hot Restart Loss of Offsite Power Test)
- ML20203L629 + (Proposed Tech Spec 3/4.8.4,revising Table 3.8-1 Re Containment Penetration Conductor Overcurrent Protective Devices & Changing Associated Bases)
- ML20235H918 + (Proposed Tech Spec 3/4.8.4.1, Electrical Equipment Protective Devices,Ac Circuits Inside Primary Containment, Deleting Four Circuits Functioning as Spares)
- ML20065P307 + (Proposed Tech Spec 3/4.9.1, Boron Concentration)
- ML20101C602 + (Proposed Tech Spec 3/4.9.11 Re Spent Fuel Pool Ventilation Sys to Require Certain Surveillance Testing Only When Sys Used in ESF Function)
- ML20058Q217 + (Proposed Tech Spec 3/4.9.11.2 Re Addition of Alternate DHR Sys)
- ML20084U043 + (Proposed Tech Spec 3/4.9.4,refueling operations-containment Penetrations)
- ML20092M070 + (Proposed Tech Spec 3/4.9.6 Re Replacement of Refueling Platform Mast NF400 W/New GE NF500 Mast)
- ML20082K687 + (Proposed Tech Spec 3/4.9.6, Refueling Platform, Increasing Normal Uptravel Limit by Six Inches for Main & Auxiliary Hoists on Refueling Platform)
- ML20083D662 + (Proposed Tech Spec 3/4.9.6.1 Re Refueling Platform for NF500 Main Hoist Grapple Mast)
- ML17279A849 + (Proposed Tech Spec 3/4.9.7, Crane Travel-Spent Fuel Storage Pool)
- ML20006D869 + (Proposed Tech Spec 3/4.9.8.1 Changing Wording & Associated Bases)
- ML20091S395 + (Proposed Tech Spec 3/4.9.9,changing Min Water Level Spent Fuel Storage Pool from 22 Ft 3 Inches to 20 Ft 6 Inches)
- ML18036A705 + (Proposed Tech Spec 317T Re MCPR Requirements Applicable to Inoperable Rod Block Monitor)
- ML20195H824 + (Proposed Tech Spec 4.0 Surveillance Requirements)
- ML20043G595 + (Proposed Tech Spec 4.0.2 & Associated Bases,Removing 3.25 Times Original Surveillance Interval Limitation for Consecutive Surveillances)
- ML20006E733 + (Proposed Tech Spec 4.0.2 Re Specified Time Interval Surveillance Requirements That Should Be Performed)
- ML19351A495 + (Proposed Tech Spec 4.0.2 Re Surveillance Requirements)
- B13528, Proposed Tech Spec 4.0.2,deleting Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals Not to Exceed 3.25 Times Specific Surveillance Interval + (Proposed Tech Spec 4.0.2,deleting Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals Not to Exceed 3.25 Times Specific Surveillance Interval)
- ML17305A591 + (Proposed Tech Spec 4.0.2,removing 3.25 Limit on Extending Surveillance Intervals in Accordance W/Generic Ltr 89-14)
- ML19327C212 + (Proposed Tech Spec 4.0.2,removing 3.25 Limit for Surveillances)
- ML17285A828 + (Proposed Tech Spec 4.0.2,removing 3.25 Time Interval Limit for Surveillance,Per Generic Ltr 89-14)
- ML20056B447 + (Proposed Tech Spec 4.0.3,permitting 24 H to Complete Inadequately Missed Surveillance)
- ML17328A180 + (Proposed Tech Spec 4.0.4,reflecting Exemptions to 18-month Measurement of Hot Leg/Cold Leg Delta T)
- ML19340A122 + (Proposed Tech Spec 4.1 Re Operational Safety Review Permitting More Conservative Recalibr of Nuclear Instrumentation)
- ML17334B288 + (Proposed Tech Spec 4.1.1.5,reducing Temp from 551 F to 545 F When Reactor Coolant Sys Average Temp Must Be Monitored Every 30 Minutes)
- ML18040A834 + (Proposed Tech Spec 4.1.3.1.4(a) Changing Requirements for Surveillance of Scram Discharge Vol Vent & Drain Valves)
- ML20151V107 + (Proposed Tech Spec 4.1.3.3,providing Alternate Surveillance Requirements for Determining Control Rod Scram Accumulator Operability)
- ML20210T154 + (Proposed Tech Spec 4.1.3.5.b.1.b,changing Low Pressure Alarm Setpoint on Control Rod Scram Accumulators to 940 Psig or Greater on Decreasing Pressure)
- ML20235X822 + (Proposed Tech Spec 4.1.5.b.2,Figure 3.1.5-1 & Bases 3/4.1.5, Maintaining Compliance w/10CFR50.62(c)(4))
- ML13317B031 + (Proposed Tech Spec 4.1.9 Re Auxiliary Feedwater Pumps & Valves.Sketch of Recommended Concept for Auxiliary Feedwater Sys & Description of Sys Used for Indication of Auxiliary Feedwater Flow Encl)
- ML19322B784 + (Proposed Tech Spec 4.11 Re Measurements & Control of Radioactive Liquid & Gaseous Effluents)
- ML20086Q422 + (Proposed Tech Spec 4.12.F.1.a Re Visual Insp Interval for Fire Barrier Penetration Seals)
- ML15007A223 + (Proposed Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp. Revised License Condition 3 Encl)
- ML18057A540 + (Proposed Tech Spec 4.14 Re Augmented Inservice Insp Program)
- ML17254A740 + (Proposed Tech Spec 4.15-4,clarifying Surveillance Requirement for Fire Suppression Sys)
- ML19329A428 + (Proposed Tech Spec 4.16 Re Nonradiological Environ Surveillance)
- ML19312B927 + (Proposed Tech Spec 4.17 Incorporating Program for Surveillance of Steam Generator Tubing)
- ML20079J666 + (Proposed Tech Spec 4.18 Re Steam Generator Tubing Surveillance)
- ML19312B841 + (Proposed Tech Spec 4.18.1 Re Extension of Surveillance Interval for Hydraulic Shock Suppressors)
- ML20085C999 + (Proposed Tech Spec 4.19 Re Auxiliary Bldg Crane Lifting Devices)
- ML19317D212 + (Proposed Tech Spec 4.2 Allowing re-insp of Reactor Coolant Outlet Nozzles at Future Refueling Outage)
- ML20107E660 + (Proposed Tech Spec 4.2 Re Primary Coolant Sys)