Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Proposed Tech Spec 3/4.4.2, Safety/Relief Valves". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20154M381  + (Proposed Tech Spec 3/4.3.2 Re Reactor Water Level Setpoint for Isolation of Group 1 Primary Containment Isolation Valves from Low Level 2 to Low Level 3)
  • ML20005F684  + (Proposed Tech Spec 3/4.3.2, ESFAS Instrumentation, Reflecting Increase to Surveillance Test Interval to 24 Months.Instrument Drift Study Encl)
  • ML20154J541  + (Proposed Tech Spec 3/4.3.2,deleting All Refs to Excessive Cooldown Protection & Associated Items.Proposed FSAR Revs Encl)
  • ML20065S514  + (Proposed Tech Spec 3/4.3.2.2 Re Instrumentation,Steam & Feedwater Rupture Control Sys Instrumentation)
  • ML20065M876  + (Proposed Tech Spec 3/4.3.2.2, Steam & Feedwater Rupture Control Sys Instrumentation)
  • ML20079M719  + (Proposed Tech Spec 3/4.3.3 Deleting Fire Detection Instrumentation & 3/4.7.9 Deleting Fire Suppression Sys, Spray &/Or Sprinkler Sys & Fire Hose Stations)
  • ML20248B415  + (Proposed Tech Spec 3/4.3.3 Re Monitoring Instrumentation)
  • ML20055E003  + (Proposed Tech Spec 3/4.3.3.3,correcting Ref for Reg Guide 1.12, Instrumentation for Earthquakes)
  • ML17214A163  + (Proposed Tech Spec 3/4.3.4 Re Turbine Overspeed Protection)
  • ML20214H317  + (Proposed Tech Spec 3/4.3.4, Turbine Overspeed Protection, Increasing Test Frequency to 120 Days)
  • ML20065G862  + (Proposed Tech Spec 3/4.3.4,eliminating Monthly Testing of Low Pressure Turbine Reheat Stop & Intercept Valves)
  • U-601766, Proposed Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation  + (Proposed Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation)
  • ML20128K388  + (Proposed Tech Spec 3/4.3.4.2, EOC Recirculation Pump Trip Sys Instrumentation, Reflecting Revised Frequency for Measuring Breaker Arc Suppression Time from Once Every 18 Months to Once Every 60 Months)
  • ML17286B104  + (Proposed Tech Spec 3/4.3.5 & Tables 3.3.5-1 & 4.3.5-1 Re RCIC Instrumentation & Surveillance Requirements)
  • ML17278A499  + (Proposed Tech Spec 3/4.3.5, RCIC Sys Actuation Instrumentation, Reflecting Downgrade Resulting from Mods to Automatic Depressurization Sys Logic)
  • ML20116C509  + (Proposed Tech Spec 3/4.3.7.4 Adding Suppression Pool Water Level & Water Temp to Remote Shutdown Monitoring Instrumentation)
  • ML20206T971  + (Proposed Tech Spec 3/4.3.7.4 Re Suppression Pool Water Level & Water Temp Instrumentation to Remote Shutdown Monitoring Instrumentation)
  • ML19332D339  + (Proposed Tech Spec 3/4.3.7.5, Accident Monitoring Instrumentation,Adding Fourth Instrument Range Per Generic Ltr 89-01)
  • ML20236U268  + (Proposed Tech Spec 3/4.3.7.5,modifying Min Operable Channels Required for Standby Gas Treatment Sys Accident Monitoring Instrumentation)
  • ML17158A562  + (Proposed Tech Spec 3/4.3.8 Re Main Turbine Valve Surveillance Test Interval)
  • ML20059C355  + (Proposed Tech Spec 3/4.3.8, Turbine Overspeed Protection Sys)
  • ML17279A645  + (Proposed Tech Spec 3/4.3.8,revising Turbine Valve Test Interval from Weekly to Monthly.Safety Evaluation Encl)
  • B14554, Proposed Tech Spec 3/4.4.1 Re Reactor Coolant Loops & Coolant Circulation  + (Proposed Tech Spec 3/4.4.1 Re Reactor Coolant Loops & Coolant Circulation)
  • ML20214K380  + (Proposed Tech Spec 3/4.4.11, Reactor Vessel Head Vent Sys. Justification & NSHC Encl)
  • ML17285B109  + (Proposed Tech Spec 3/4.4.2 Re Safety/Relief Valves)
  • ML17285A958  + (Proposed Tech Spec 3/4.4.2, Safety/Relief Valves)
  • ML20086D659  + (Proposed Tech Spec 3/4.4.3 Re Operability of PORV & Block Valves & Safety & Relief Valves)
  • U-602265, Proposed Tech Spec 3/4.4.3.1, RCS Leakage - Leakage Detection Sys  + (Proposed Tech Spec 3/4.4.3.1, RCS Leakage - Leakage Detection Sys)
  • ML20234F350  + (Proposed Tech Spec 3/4.4.3.2, Operational Leakage & Table 3.4.3.2-1, RCS Pressure Isolation Valves, Correcting Alarm Setpoints)
  • ML20091D571  + (Proposed Tech Spec 3/4.4.4 Re Limiting Condition for Operation & Surveillance Requirements for Relief Valves & 3.4.9.3 Re Pressure/Temp Limits for Overpressure Protection Sys)
  • ML20086E729  + (Proposed Tech Spec 3/4.4.4 Re Relief Valves & 3/4.4.8 Re Pressure/Temp Limits)
  • ML20086G043  + (Proposed Tech Spec 3/4.4.4,3/4.4.9 & 3/4.4 Re PORV & Block Valve Reliability)
  • ML20248B156  + (Proposed Tech Spec 3/4.4.5 Allowing Option of Using B&W Kinetic Sleeving Process for Steam Generator Tube Repair)
  • ML20247K682  + (Proposed Tech Spec 3/4.4.5 Re Steam Generators Revising Surveillance Requirements to Extend Application of F* Tube Plugging Criterion for Life of Steam Generators)
  • ML20059C681  + (Proposed Tech Spec 3/4.4.5 Re Tube Plugging or Repair Limits)
  • ML17324B136  + (Proposed Tech Spec 3/4.4.5, Steam Generators, Clarifying Requirements for Steam Generator Tube Integrity)
  • ML20154H128  + (Proposed Tech Spec 3/4.4.5, Steam Generators, Surveillance Requirement 4.4.5.4.a.10,allowing Use of Steam Generator Weld Sleeve Processes Contingent Upon Prior NRC Approval)
  • ML20138D035  + (Proposed Tech Spec 3/4.4.5, Steam Generators, Revising Tube Plugging Limit Definition & Permitting Repair of Defective Tubes Using NRC Approved Method)
  • ML20011D207  + (Proposed Tech Spec 3/4.4.5, Steam Generators, Reflecting Extended Application of Tube Plugging Criterion for Life of Steam Generators)
  • ML19332G140  + (Proposed Tech Spec 3/4.4.5, Steam Generators)
  • ML20054E350  + (Proposed Tech Spec 3/4.4.6 Clarifying Action Statement for Radioactivity Monitoring Detection Sys)
  • ML17289A475  + (Proposed Tech Spec 3/4.4.6 Re Pressure/Temp Limits)
  • ML20085L182  + (Proposed Tech Spec 3/4.4.6, Pressure/Temp Limits & Deleted TS Table 4.4.6.1.3-1 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule)
  • ML20042F794  + (Proposed Tech Spec 3/4.4.6, Pressure/Temp Limits)
  • ML20055B538  + (Proposed Tech Spec 3/4.4.7,Table 4.4-3,deleting Requirement for Sampling Chlorides & Fluorides When RCS Sys Is Drained Below Reactor Pressure Vessel Nozzle & Internals &/Or Head, Are in Place)
  • ML20106J609  + (Proposed Tech Spec 3/4.4.7,Table 4.4-3,eliminating Requirement to Sample Chlorides & Fluorides When RCS Drained Below Reactor Pressure Vessel Nozzles & Internals &/Or Head in Place)
  • ML20062G527  + (Proposed Tech Spec 3/4.4.7.3 for Unit 2 & Revised Tech Specs 4.4.7.3.2 for Unit 1 & 3/4.4.7.2 for Unit 2 Re Acceptance Criteria for Leak Testing RCS Isolation Valves)
  • ML20247E123  + (Proposed Tech Spec 3/4.4.8, Structural Integrity)
  • ML20086P602  + (Proposed Tech Spec 3/4.4.9 Re Pressure/Temp Limits to Modify Plant Heatup & Cooldown Curves & Max Allowable PORV Setpoint Curve for Cold Overpressurization Protection)
  • ML17331B277  + (Proposed Tech Spec 3/4.4.9.1 Re Heatup & Cooldown Curves)
  • ML20091D625  + (Proposed Tech Spec 3/4.5.1 Re HPCI Sys Operability)