Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154M381 + (Proposed Tech Spec 3/4.3.2 Re Reactor Water Level Setpoint for Isolation of Group 1 Primary Containment Isolation Valves from Low Level 2 to Low Level 3)
- ML20005F684 + (Proposed Tech Spec 3/4.3.2, ESFAS Instrumentation, Reflecting Increase to Surveillance Test Interval to 24 Months.Instrument Drift Study Encl)
- ML20154J541 + (Proposed Tech Spec 3/4.3.2,deleting All Refs to Excessive Cooldown Protection & Associated Items.Proposed FSAR Revs Encl)
- ML20065S514 + (Proposed Tech Spec 3/4.3.2.2 Re Instrumentation,Steam & Feedwater Rupture Control Sys Instrumentation)
- ML20065M876 + (Proposed Tech Spec 3/4.3.2.2, Steam & Feedwater Rupture Control Sys Instrumentation)
- ML20079M719 + (Proposed Tech Spec 3/4.3.3 Deleting Fire Detection Instrumentation & 3/4.7.9 Deleting Fire Suppression Sys, Spray &/Or Sprinkler Sys & Fire Hose Stations)
- ML20248B415 + (Proposed Tech Spec 3/4.3.3 Re Monitoring Instrumentation)
- ML20055E003 + (Proposed Tech Spec 3/4.3.3.3,correcting Ref for Reg Guide 1.12, Instrumentation for Earthquakes)
- ML17214A163 + (Proposed Tech Spec 3/4.3.4 Re Turbine Overspeed Protection)
- ML20214H317 + (Proposed Tech Spec 3/4.3.4, Turbine Overspeed Protection, Increasing Test Frequency to 120 Days)
- ML20065G862 + (Proposed Tech Spec 3/4.3.4,eliminating Monthly Testing of Low Pressure Turbine Reheat Stop & Intercept Valves)
- U-601766, Proposed Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation + (Proposed Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation)
- ML20128K388 + (Proposed Tech Spec 3/4.3.4.2, EOC Recirculation Pump Trip Sys Instrumentation, Reflecting Revised Frequency for Measuring Breaker Arc Suppression Time from Once Every 18 Months to Once Every 60 Months)
- ML17286B104 + (Proposed Tech Spec 3/4.3.5 & Tables 3.3.5-1 & 4.3.5-1 Re RCIC Instrumentation & Surveillance Requirements)
- ML17278A499 + (Proposed Tech Spec 3/4.3.5, RCIC Sys Actuation Instrumentation, Reflecting Downgrade Resulting from Mods to Automatic Depressurization Sys Logic)
- ML20116C509 + (Proposed Tech Spec 3/4.3.7.4 Adding Suppression Pool Water Level & Water Temp to Remote Shutdown Monitoring Instrumentation)
- ML20206T971 + (Proposed Tech Spec 3/4.3.7.4 Re Suppression Pool Water Level & Water Temp Instrumentation to Remote Shutdown Monitoring Instrumentation)
- ML19332D339 + (Proposed Tech Spec 3/4.3.7.5, Accident Monitoring Instrumentation,Adding Fourth Instrument Range Per Generic Ltr 89-01)
- ML20236U268 + (Proposed Tech Spec 3/4.3.7.5,modifying Min Operable Channels Required for Standby Gas Treatment Sys Accident Monitoring Instrumentation)
- ML17158A562 + (Proposed Tech Spec 3/4.3.8 Re Main Turbine Valve Surveillance Test Interval)
- ML20059C355 + (Proposed Tech Spec 3/4.3.8, Turbine Overspeed Protection Sys)
- ML17279A645 + (Proposed Tech Spec 3/4.3.8,revising Turbine Valve Test Interval from Weekly to Monthly.Safety Evaluation Encl)
- B14554, Proposed Tech Spec 3/4.4.1 Re Reactor Coolant Loops & Coolant Circulation + (Proposed Tech Spec 3/4.4.1 Re Reactor Coolant Loops & Coolant Circulation)
- ML20214K380 + (Proposed Tech Spec 3/4.4.11, Reactor Vessel Head Vent Sys. Justification & NSHC Encl)
- ML17285B109 + (Proposed Tech Spec 3/4.4.2 Re Safety/Relief Valves)
- ML17285A958 + (Proposed Tech Spec 3/4.4.2, Safety/Relief Valves)
- ML20086D659 + (Proposed Tech Spec 3/4.4.3 Re Operability of PORV & Block Valves & Safety & Relief Valves)
- U-602265, Proposed Tech Spec 3/4.4.3.1, RCS Leakage - Leakage Detection Sys + (Proposed Tech Spec 3/4.4.3.1, RCS Leakage - Leakage Detection Sys)
- ML20234F350 + (Proposed Tech Spec 3/4.4.3.2, Operational Leakage & Table 3.4.3.2-1, RCS Pressure Isolation Valves, Correcting Alarm Setpoints)
- ML20091D571 + (Proposed Tech Spec 3/4.4.4 Re Limiting Condition for Operation & Surveillance Requirements for Relief Valves & 3.4.9.3 Re Pressure/Temp Limits for Overpressure Protection Sys)
- ML20086E729 + (Proposed Tech Spec 3/4.4.4 Re Relief Valves & 3/4.4.8 Re Pressure/Temp Limits)
- ML20086G043 + (Proposed Tech Spec 3/4.4.4,3/4.4.9 & 3/4.4 Re PORV & Block Valve Reliability)
- ML20248B156 + (Proposed Tech Spec 3/4.4.5 Allowing Option of Using B&W Kinetic Sleeving Process for Steam Generator Tube Repair)
- ML20247K682 + (Proposed Tech Spec 3/4.4.5 Re Steam Generators Revising Surveillance Requirements to Extend Application of F* Tube Plugging Criterion for Life of Steam Generators)
- ML20059C681 + (Proposed Tech Spec 3/4.4.5 Re Tube Plugging or Repair Limits)
- ML17324B136 + (Proposed Tech Spec 3/4.4.5, Steam Generators, Clarifying Requirements for Steam Generator Tube Integrity)
- ML20154H128 + (Proposed Tech Spec 3/4.4.5, Steam Generators, Surveillance Requirement 4.4.5.4.a.10,allowing Use of Steam Generator Weld Sleeve Processes Contingent Upon Prior NRC Approval)
- ML20138D035 + (Proposed Tech Spec 3/4.4.5, Steam Generators, Revising Tube Plugging Limit Definition & Permitting Repair of Defective Tubes Using NRC Approved Method)
- ML20011D207 + (Proposed Tech Spec 3/4.4.5, Steam Generators, Reflecting Extended Application of Tube Plugging Criterion for Life of Steam Generators)
- ML19332G140 + (Proposed Tech Spec 3/4.4.5, Steam Generators)
- ML20054E350 + (Proposed Tech Spec 3/4.4.6 Clarifying Action Statement for Radioactivity Monitoring Detection Sys)
- ML17289A475 + (Proposed Tech Spec 3/4.4.6 Re Pressure/Temp Limits)
- ML20085L182 + (Proposed Tech Spec 3/4.4.6, Pressure/Temp Limits & Deleted TS Table 4.4.6.1.3-1 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule)
- ML20042F794 + (Proposed Tech Spec 3/4.4.6, Pressure/Temp Limits)
- ML20055B538 + (Proposed Tech Spec 3/4.4.7,Table 4.4-3,deleting Requirement for Sampling Chlorides & Fluorides When RCS Sys Is Drained Below Reactor Pressure Vessel Nozzle & Internals &/Or Head, Are in Place)
- ML20106J609 + (Proposed Tech Spec 3/4.4.7,Table 4.4-3,eliminating Requirement to Sample Chlorides & Fluorides When RCS Drained Below Reactor Pressure Vessel Nozzles & Internals &/Or Head in Place)
- ML20062G527 + (Proposed Tech Spec 3/4.4.7.3 for Unit 2 & Revised Tech Specs 4.4.7.3.2 for Unit 1 & 3/4.4.7.2 for Unit 2 Re Acceptance Criteria for Leak Testing RCS Isolation Valves)
- ML20247E123 + (Proposed Tech Spec 3/4.4.8, Structural Integrity)
- ML20086P602 + (Proposed Tech Spec 3/4.4.9 Re Pressure/Temp Limits to Modify Plant Heatup & Cooldown Curves & Max Allowable PORV Setpoint Curve for Cold Overpressurization Protection)
- ML17331B277 + (Proposed Tech Spec 3/4.4.9.1 Re Heatup & Cooldown Curves)
- ML20091D625 + (Proposed Tech Spec 3/4.5.1 Re HPCI Sys Operability)